Council archive · source document
RFI - Attachment 3 - Operational Waste Management Plan · MCU22/0094
Plans and drawings: the text below has words only, no drawings.
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
Table Index Table 1.1: Scope Items ....................................................................... 5 Table 1.2: OWMP Compliance Checklist ............................................ 6 Table 1.3: Development Summary .................................................. 10 Table 2.1: CMC Provided Generation Rates ..................................... 11 Table 2.2: Refuse Calculations ......................................................... 12 Table 2.3: Bin Requirements ............................................................ 13 Table 2.4: Additional Equipment ..................................................... 13 Table 3.1: Disposal of Frequently Generated Refuse ....................... 19 Table 3.2: Disposal of Infrequently Generated Waste ..................... 20 Table 3.3: General Refuse Management Checklist .......................... 21 Table 3.4: Safety Checklist ............................................................... 21 Table 3.5: Signage Checklist............................................................. 22 Table 3.6: Cleaning and Maintenance Checklist .............................. 22 Table 3.7: Education and Communication Checklist ........................ 23 Table 3.8: Refuse Minimisation Checklist ........................................ 23 Table 3.9: Monitoring and Review Checklist .................................... 24 Figure Index Figure 1.1: Site Location .................................................................... 9 Figure 2.1: Refuse Room Layout ...................................................... 15 Figure 2.2: Refuse Transfer Path and Bin Presentation Area ........... 17 Site: Lot 4, 28 Eenie Creek Road, Noosaville Reference: 23BRW0003 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 3 - Operational Waste Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.