Original source · versioned page text
Appendix Q - Planning Scheme Code Responses
RESIDENTIAL USES CODE
Performance Criteria and Acceptable Solutions
PROBABLE SOLUTIONS COUNCIL USE
SPECIFIC OUTCOMES SOLUTIONS* COMMENTS
(IF CODE ASSESSABLE) ONLY
Multiple housing is designed and sited to S14.1 No solution provided
minimise the extent of shadows cast on
solar
photovoltaic cells on roofs of adjoining
buildings.
Sloping sites ✓ O15 Complies
O15 S15.1 Buildings and structures on sloping The site layout accommodates the natural topography
On sloping sites, buildings and structures sites— in order to minimise the need for cut and fill.
are designed to maximise the use of the (a) Have a maximum distance of 3m
natural between the ground and the lowest
topography and minimise the need for cut part of the floor of the building or the
and fill. building incorporates undercroft
skirting or screening (eg. timber
battens) to the full height of any
undercroft area higher than 3m above
ground level at the perimeter of the
building;
(b) are of split level design that step
down the slope or have suspended
floor construction;
(c) limit the amount of cut or fill to less
than 1.5m in depth; and
(d) do not result in the spread of fill
beyond the footprint of the building
and associated batters.
Wall length and detailing N/A Not Applicable
O16 S16.1 The proposed development is in the rural and rural
Within the Semi-attached Housing, The maximum wall length is 15m; and settlement zones.
Attached Housing and Visitor Mixed
Use Zones buildings and other structures S16.2
provide for visual interest and amenity Wall planes incorporate design elements
by— to add visual interest and amenity, such
(a) staggering or separating continuous as windows, pergolas, sun shading
walls into smaller sections to vary the devices and variations in balcony styles.
elevation; and
(b) providing well articulated building
1 Solution: ✓ = Acceptable Solution
A/S = Alternative Solution Cooroy Care Farm
N/A = Not applicable to this proposal
521 Elm Street and 10-22 Rose Gum Road, Black Mountain Commenced 3rd February 2006 - Updated October 2006 Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.