Appendix Q - Planning Scheme Code Responses

of 88

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                                        TRANSPORT, ROADS AND DRAINAGE CODE
                                                                                                                                       Performance Criteria and Acceptable Solutions



                                                       PROBABLE SOLUTIONS                                                                                           COUNCIL USE
      PERFORMANCE CRITERIA                                                                    SOLUTIONS*                        COMMENTS
                                                       (IF CODE ASSESSABLE)                                                                                            ONLY

O10                                          S10.1                                                ✓        S10.1 Complies
Alignment      of   stormwater    drainage   The location, design and construction of                      Proposal will comply.
infrastructure is to allow for easy access   stormwater drainage structures is in
for the ongoing maintenance by Council.      accordance with Sections 4 and 5 of
                                             PSP5, Engineering Design Standards -
                                             Roads, Drainage and Earthworks; and

                                             S10.2                                                ✓        S10.2 Complies
                                             Where infrastructure is located on private                    Proposal will comply.
                                             land an easement is dedicated over the
                                             infrastructure in accordance with Section
                                             4 of PSP 5, Engineering Design
                                             Standards – Roads, Drainage and
                                             Earthworks.

14.165 Frontage works
O11                                          S11.1                                                ✓        S11.1 Complies
Development is provided with external        The following infrastructure components                       Appropriate infrastructure will be provided.
roadworks along the full extent of the       already exist at the frontage of the site or
frontage of the site to an appropriate       are     provided     at    the     developer’s
standard having regard to the specified      expense—
function of the road.                        (a) full width sealed road;
                                             (b) concrete kerb and channel where
                                                  appropriate;
                                             (c) forming and grading to footpaths;
                                             (d) vehicular kerb and footpath
                                                  crossings;
                                             (e) a constructed bikeway;
                                             (f) a constructed footpath;
                                             (g) a constructed carriageway;
                                             (h) required alterations to public utility
                                                  mains, services or installations;
                                             (i) construction of any required
                                                  alterations to public utility mains,
                                                  services or installations;
                                             (j) stormwater drainage works; and
1    Solution: ✓ = Acceptable Solution
               A/S = Alternative Solution                                                                                                                          Cooroy Care Farm
               N/A = Not applicable to this proposal

521 Elm Street and 10-22 Rose Gum Road, Black Mountain                  Commenced 3rd February 2006 - Updated October 2006                                                   Page 6
Log in to download the original file

Appendix Q - Planning Scheme Code Responses.pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.