Original source · versioned page text
Appendix Q - Planning Scheme Code Responses
RESIDENTIAL USES CODE
Performance Criteria and Acceptable Solutions
PROBABLE SOLUTIONS COUNCIL USE
SPECIFIC OUTCOMES SOLUTIONS* COMMENTS
(IF CODE ASSESSABLE) ONLY
14.53 Environmentally Sustainable Building Design
Hot Water Systems S3.1 ✓ O3 Complies
O3 All hot water systems installed are— The proposal utilises environmentally sustainable hot
Hot water systems are installed and (a) solar systems; or water systems.
operated to support the efficient use of (b) electric heat pump systems; or
natural resources and minimise (c) natural gas or LPG systems; or
consequent pollution such as greenhouse (d) any combination of a), b) or c).
gas emissions.
Water supply and conservation S4.1 ✓ O4 Complies
O4 If in a designated rainwater tank area as On-site water storage provides for operational and
On-site water storage is designed and identified in Map 1 of Schedule 8, efficient use of water.
operated to support the efficient use of residential uses that qualify as class 1A or
water; and 1B structures under the Building Code of
Australia have a rainwater tank or tanks in
accordance with Schedule 8; and
O5 S5.1 ✓ O5 Complies
On-site water storage is adequate for Where not in a water service area a On-site water storage will be adequate for every-day
occupants every day use and fire fighting rainwater tank of a minimum of 60,000 use as well as fire fighting purposes.
purposes. litres is provided for each dwelling unit,
with the exception of Multiple Housing
Type 1.
Erosion and sediment control ✓ O6 Complies
O6 The development will not cause erosion or result in the
Development does not cause erosion or No solution provided. transport of sediments off-site.
result in transport of sediments off-site.
Advisory Note
Persons undertaking development,
including
building work, are required under the
Environmental Protection (Water) Policy
1997 (EPP) to ensure that sediment and
other material including building waste,
sawdust, concrete, cement or paint are
not deposited or released into a roadside
1 Solution: ✓ = Acceptable Solution
A/S = Alternative Solution Cooroy Care Farm
N/A = Not applicable to this proposal
521 Elm Street and 10-22 Rose Gum Road, Black Mountain Commenced 3rd February 2006 - Updated October 2006 Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.