2018-08-07 S&O Agenda - Att 1 to Item 1 - Draft Bridges Asset Management Plan

of 33

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                Att 1 to Item 1
                Services and Organisation
                Committee Meeting Agenda
                7 August 2018



Asset Management Plan

    Road Bridges




                               July 2018
                             Revision 1.0
Log in to download the original file

2018-08-07 S&O Agenda - Att 1 to Item 1 - Draft Bridges Asset Management Plan(PDF, 2MB).pdf · 2.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 32 sections

Section 2

Table of Contents
1.     Executive Summary ............................................................................................................. 3
2.     Introduction .......................................................................................................................... 4
       2.1         Asset Management Plan Definition and Purpose...................................................... 4
       2.2         Scope ....................................................................................................................... 4
       2.3         Road Bridges ........................................................................................................... 4
       2.4         Road Bridges Asset Management Objectives .......................................................... 5
       2.5         Levels of Service ...................................................................................................... 5
       2.6         Legislative & Standards Requirements ..................................................................... 5
       2.7         Current Levels of Service ......................................................................................... 6
       2.8         Measured Levels of Service ..................................................................................... 6
3.     Future Demand .................................................................................................................... 7
       3.1         Demand Drivers ....................................................................................................... 7
       3.2         Demand Impacts on Assets...................................................................................... 7
       3.3         Climate Change Adaptation...................................................................................... 7
4.     Lifecycle Management Plan ................................................................................................ 8
       4.1         Assets ...................................................................................................................... 8
       4.2         Asset Valuation ........................................................................................................ 8
       4.3         Asset Condition ........................................................................................................ 8
       4.4         Operations ............................................................................................................. 11
       4.5         Bridge Maintenance Plan ....................................................................................... 12
       4.6         Asset Renewals ..................................................................................................... 13
       4.7         Capital Upgrades and New Assets ......................................................................... 14
       4.8         Capitalisation of Assets .......................................................................................... 14
       4.9         Disposal and Replacement of Assets ..................................................................... 15
5.     Risk Management .............................................................................................................. 16
       5.1         Critical Assets ........................................................................................................ 16
       5.2         Risk Assessment.................................................................................................... 16
6.     Financial Summary ............................................................................................................ 17
       6.1         Financial Statements and Projections .................................................................... 17
       6.2         Funding Strategies ................................................................................................. 17
       6.3         Budget Forecasts ................................................................................................... 17
7.     Plan Improvement and Monitoring ................................................................................... 19
       7.1         Status of Asset Management Practices .................................................................. 19
       7.2         Improvement Program............................................................................................ 19
       7.3         Monitoring and Review Processes for the Asset Management Plan ....................... 20
       7.4         Asset Management Effectiveness .......................................................................... 20
ANNEX A: Measured Levels of Service ..................................................................................... 21
ANNEX B: Bridge Asset Register.............................................................................................. 23


Asset Management Plan: Road Bridges                                                                                                     Page 1

Section 3

ANNEX C: Bridge Maintenance Plan ........................................................................................ 26
ANNEX D: Bridge Asset Renewal Program .............................................................................. 28
F: Bridge Level 2 & 3 Inspections List ...................................................................................... 30
ANNEX F: Bridge Stakeholders ................................................................................................ 31
ANNEX G: Document Management ........................................................................................... 32




Asset Management Plan: Road Bridges                                                                                    Page 2

Section 4

1. Executive Summary
Noosa Council is responsible for a diverse and extensive range of community assets which
represents a major investment over many years. To fulfil its objectives in delivering a variety of
services to the community, Council must ensure that the assets supporting these services are
managed in a way that guarantees an optimal balance of cost, risk and performance.

Council’s road bridges play a vital role in connectivity of the 867km road network (both 670km sealed
and 197km unsealed roads) across the Noosa Shire. There are a total of 51 Road Bridges and 5
Underpass pedestrian bridges on Council’s asset register, considered in this Asset Management
Plan (AMP). These bridges have a current replacement value of $103m, which equates to 10% of
Council’s financial assets.

The operational and maintenance expenses for road bridges make up approximately 3% of the $70m
annual budget. The capital works program fluctuates from year to year, however, the proposed
2018/19 capital works program with the capital investment of $2.53m for road bridges equates to 9%
of the $28.5m capital works program.

The mitigation of risks is fundamental in the management of bridge structures. For Council to make
informed decisions, with the focus placed on consistent cyclical inspections across all bridge assets.
The condition data needs to be accurately recorded in the asset management system (Technology
One). Bridge data was established by reconciling financial asset data, GIS data and inspection data
to achieve a “single point of truth” for all bridge assets.

Good maintenance and renewal practices have been established, with regular inspections and
subsequent Condition Assessments (CA) across the network of road bridges. There are three levels
of inspections undertaken and they are in accordance with the Department of Transport and Main
Roads Structures Inspection Manual September 2016. Future condition assessments will also
capture a breakdown of assets and comprehensive condition information against bridge components
and will also include the estimated economic life, asset condition, repair priorities, expected year of
replacement and asset values for loading into the asset management system.

This Road Bridge AMP meets the objectives of the Noosa Corporate Plan. Key focus areas under
Theme 4 (Long term planning for Noosa Shire) of the Corporate Plan includes: to undertake long
term financial sustainability planning identifying asset management outcomes and establish
functional Asset Management Plans for all Council asset classes. These focus areas have been a
major driver in the development of this AMP.

The road bridges AMP provides the relevant information and organisational activities to ensure the
organisational objectives for asset management have been achieved and that the pathway for
continual improvement across all management activities for road bridges has been established. The
provision of road bridges is, therefore, a significant part of the infrastructure services provided by
Council.




Asset Management Plan: Road Bridges                                                             Page 3

Section 5

2. Introduction
2.1     Asset Management Plan Definition and Purpose
“Documented information that specifies the activities, resources and timescales required for an
individual asset, or a grouping of assets, to achieve the organisation’s asset management
objectives.”1

The purpose of the road bridges asset management plan is to define the whole of life activities
associated with operating and maintaining of road bridges for the Noosa Community. The plan
identifies the assets and the levels of service to meet the expectations of the Noosa Community. A
key outcome of the asset management plan is the identification of the current state of the asset
conditions and the development of renewal and maintenance plans. Importantly, the identification of
future costs and potential risks to the assets that support the service for operating road bridges is
fundamental in achieving the asset management objectives for Noosa Council.
2.2     Scope
The scope of this asset management plan is to ensure the road bridges meets, demonstrates and
incorporates the following key asset management objectives:

•     A description of assets and the services provided.
•     Links to Councils long term financial plan through:
      o     An asset renewal program reflecting Council’s Capital Works
            Program.
      o     A maintenance program.
•     Levels of service and demand are identified and determined.
•     The assets are identified with a condition.
•     Life cycle costs are addressed.
•     Long-term cash-flow requirements are forecasted for asset
      renewals, maintenance and operations.
•     Asset rationalisation and disposal is addressed.
•     The risk management activities associated with the road bridges.
2.3     Road Bridges
There a total of 56 structures within the Road Bridges asset management plan (AMP). For the
purpose of this AMP these assets including timber bridges, concrete bridges and concrete
underpasses will be referred to throughout this document as “Bridges”. Other smaller bridges such
as pedestrian bridges will be included in the pathways and boardwalks AMP and major culverts that
are similar in structure to bridges are included in the Stormwater Drainage AMP.

The Bridge assets included in this document consist of:
          o 23 Timber Road Bridges
          o 28 Concrete Road Bridges
          o    5 Concrete Underpasses

Bridges are critical infrastructure to Noosa’s transportation network with the primary function of
maintaining connectivity of council’s sealed and unsealed road network. This asset management
plan (AMP) consolidates Councils available data and analysis on the bridge assets. It also presents
the output of how systematic approaches are applied by Council to optimally balance cost, risk and
performance. This is essential to meet forecasted demand and the levels of service required.

1 ISO 55000:2014 (3.3.3) Asset Management – Overview, principles and terminology

Asset Management Plan: Road Bridges                                                           Page 4

Section 6

2.4    Road Bridges Asset Management Objectives
The AM objectives detailed in the AMP include:
•    A consolidated asset register that identifies (Refer to Annex B):
     o     Asset description;
     o     Asset condition;
     o     Useful life and renewal dates; and
     o     Replacement costs.
•    The levels of service provided by bridges to the Noosa Community;
•    Current and future maintenance expenditure;
•    Identifying any future demand forecasts for the bridges;
•    Stakeholders (refer to Annex F);
•    Identifying any legislative considerations necessary in the management of the bridges;
•    Documenting the financial forecasts for the bridges;
•    Identifying all risks and opportunities related to management of the bridges; and
•    Documentation of any future actions identified to improve the asset management objectives of
     the bridges.

2.5    Levels of Service
The levels of service that are currently being maintained for Council’s bridges are aligned to the
Corporate Plan and Branch Plan objectives. The continuous development and implementation of the
asset management objectives that include good asset governance and asset knowledge are also
aligned to the Corporate Plan objectives. The service delivery is provided internally with external
specialists and technical consultants engaged as required.

There is no demand to change the current levels of service on our bridges, any changes in the levels
of service to the bridges will be required to demonstrate the benefit and will require Council approval.
Changes in levels of service should be addressed through the asset management governance
framework prior to the approval by Council. An example of a change in levels of service would be
the upgrade of a bridge to improve flood immunity. There will be a requirement to provide a business
case to demonstrate the overall community benefits before these changes in the level of service
would be approved.


2.6    Legislative & Standards Requirements
The Legislative and Standards requirements relative to bridges are:
•    Transport Operations (Road Use Management) Act 1995
•    Department of Transport and Main Roads - Structures Inspection Manual, September 2016.
•    AS 1742 - Manual of uniform traffic control devices
•    Australian and Queensland Road Rules
•    AUSTROADS Guidelines for Bridge Management: Structure Information, 2004
•    AUSTROADS publications:
•    AP-13/91 Bridge Management Practice
•    AP-14/91 Guide to Bridge Construction Practice
•    AP-15/96 Australian Bridge Design Code
•    AP-23/94 Waterway Design: A Guide to the Hydraulic Design of Bridges, Culverts &
     Floodways.




Asset Management Plan: Road Bridges                                                              Page 5

Section 7

2.7    Current Levels of Service
The current levels of service for bridges is to ensure connectivity of council’s sealed and unsealed
road network. Council’s bridges are designed and constructed to suit the hierarchy of the road
network and therefore structure types, load limits and traffic demands determine the levels of service.
The overall management of Council’s bridges are in accordance with the Department of Transport
and Main Roads Structures Inspection Manual - September 2016.

Regular inspections are critical to the management of bridges and the inspections undertaken by
Council and by third party providers will meet the standards and statutory requirements to ensure all
structures remain safe to all users of bridges. The scheduled maintenance activities will be within
the defined timeframes to ensure that all potential or identified defects are rectified.

Levels of service must be readily measurable and preferably from available data sources or
otherwise. Each level of service should be stated in terms of appropriateness and understood by the
community for whom the service is provided. The levels of service in this AMP are intended to:

   Measure the effectiveness of this AMP;
   Assist with the identification of the expenditure and benefits of the Noosa Council services being
    offered;
   Provide focus for the development of future bridges asset management strategies;
   Provide guidance for current and future services to be offered; and
   Define the specific levels of service provided by Noosa Council.

The levels of service outlined in this Bridges AMP are also aligned to:
 Statutory, legislative and relevant code requirements.
 Information obtained from asset condition assessments and maintenance analysis; and
 Noosa Council’s Corporate Plan.

The current levels of service are catalogued and is located at Annex A.


2.8    Measured Levels of Service
To demonstrate the levels of service of the bridge assets a table of performance measures have
been drafted and are located at Annex A. This table of Measured Levels of Services are to inform
responsible staff of their obligations in maintaining the current levels of service. When targets are
not achieved they should be escalated and reported through the Asset Management Governance
Framework.




Asset Management Plan: Road Bridges                                                             Page 6

Section 8

3. Future Demand
3.1    Demand Drivers
There is currently an ad hoc approach of demand management applied to the management of the
bridges through the monitoring of the asset conditions and traffic volumes. Load limits are a key
demand driver on the current and future levels of serviceability for bridges. Significant changes in
the monitoring of these activities should act as an indicator to reviewing demand management for a
specific bridge. It is Council practice that any change in the level of service due to demand is reported
to Council in accordance with current guidelines and practices. The major drivers of capital upgrade
for bridges will be:
     changes in legislative/statutory requirements,
     changes to load limits,
     Changes to traffic volumes,
     external funding opportunities,
     Improvements to trunk networks,
     risk management,
     climate change adaptation,
     Flood mitigation,
     changes in technologies or impacts on operational and maintenance activities.

The current bridge inspection program will act as a trigger for any need to improve on preventative
maintenance activities to preserve the life of the assets.


3.2    Demand Impacts on Assets
The most significant impact on assets from demand relate to periods of scheduled closures for asset
repairs/refurbishment or maintenance works. These scheduled activities should ideally be
undertaken outside of the peak traffic periods (Christmas to Easter) where vehicle movements on
our road network is most prevalent. Where practical, night works for scheduled maintenance may
be necessary to reduce the impacts on parts of the road transport network.


3.3    Climate Change Adaptation
Responding to changing natural hazard risks due to climate change will be another demand driver
that will affect bridge assets across the local government area. Consideration of impacts from
increases in the terrestrial areas subject to and intensity of natural hazards such as catchment
flooding, storm tide inundation, coastal erosion and shoreline recession, periodic tidal inundation,
and increased atmospheric temperatures must be taken into consideration for future upgrades for
those affected assets.

Those assets potentially affected by coastal hazards and catchment flooding can be identified within
the flooding and coastal hazard layers, which are viewable using Intramaps. These hazard layers
are located in the Emergency module and Development Assessment module, respectively.

Consultation with Council’s Program Coordinator, Climate Change Adaptation should be undertaken
for any assets within these zones. Council is currently pursuing more detailed and actionable
information regarding future climate conditions, including increased atmospheric temperatures, for
the local government area. Once obtained, this information should be considered as part of asset
design and maintenance.




Asset Management Plan: Road Bridges                                                               Page 7

Section 9

4. Lifecycle Management Plan
4.1    Assets
Council’s bridges play a vital role in connectivity of the 680km road network (both sealed and
unsealed roads) across the Noosa Shire. There is a total of 56 structures that are made up of
concrete and timber bridges as well as concrete pedestrian underpasses that are considered in this
Asset Management Plan (AMP). A detailed register of these assets is located at Annex B.

The 56 structures include:
• 23 x Timber road bridges
• 28 x concrete road bridges
• 5 x concrete underpasses




4.2    Asset Valuation
The value of the Bridge Assets, at the end of the financial year 2016/2017 for the purposes of this
AMP is summarised below.

        May 2018            Current Asset Cost     Current Depreciation      Written Down Value

 Road Bridges                $103,604,223           $ 25,168,425            $78,435,798

Table 3: Road Bridges Asset Valuation


4.3    Asset Condition
Levels of service and asset management decision making is directly linked to asset condition; this
determines what condition the asset should be in before an asset management intervention. The
intent of current and future Condition Assessments (CA) is to:
•     Provide a robust and repeatable process for carrying out condition assessments on Council’s
      bridge assets;
•     Use condition assessments to develop programs for intervention with regards to further
      inspection, monitoring, maintenance and renewals;
•     Provide a basis for information for the modelling of condition data for the likelihood of asset
      failure for those assets not inspected.

A consistent condition ranking scale has been chosen by Council as the framework for measuring
bridge assets, based on the 1 to 5 ranking according to the International Infrastructure Management
Manual (IIMM). Any asset scoring 4 (fair) to 5 (poor) will be considered under a renewal program.


Asset Management Plan: Road Bridges                                                           Page 8

Section 10

The safety and condition of bridge structures on Council’s road network is monitored through a three
level hierarchical inspection regime based on the Department of Transport and Main Roads
guidelines.

The three inspection levels are as follows:

Level 1 – Routine Maintenance Inspection − A visual inspection to check the general serviceability
of the structure, particularly for the safety of road users and to identify any emerging problems. Leve;
1 inspections are conducted every 6 months.

Level 2 – Condition Rating Inspection − An inspection to assess and rate the condition of a
structure (as a basis for assessing the effectiveness of past maintenance treatments, identifying
current maintenance needs, modelling and forecasting future changes in condition and estimating
future budget requirements). Level 2 inspections are conducted every 3 years or more frequently if
recommended from previous inspections.

Level 3 – Special Inspection − An inspection to provide improved knowledge of the condition, load
capacity, in-service performance or any other characteristic beyond the scope of other types of
inspection. Special inspections may be used to inform/develop the scope of other types of inspection.
The frequency of level 3 inspections will be a result from an escalation from a previous level 2
inspection in the first instance.

Level 3 inspection categories include:
   structural engineering
   Asbestos Containing Material (ACM) identification
   ACM verification
   underwater access
   fracture critical/low redundancy
   sub-standard load rating
   complex/unique structures
   known/suspected deficiencies
   confined space inspection.


Condition Assessments (CA) are conducted as part of the Level 2 inspections, undertaken by
Council staff on a 3 yearly cycle or more frequently if recommended from a previous inspection(s).
The CA covers all bridge components above the high water mark and provides an overview of the
condition of the components of a bridge. The Level 2 inspections are the trigger to activate the need
for a Level 3 type inspection, which is a more invasive and detailed condition assessment of all
bridge components. Level 3 inspections are only undertaken when there is escalations in defects
observed from a Level 2 inspection or when recommendations from previous Level 3 inspections are
recommended to do so.

The Level 3 assessment includes:
    estimated economic life,
    asset condition,
    repair priorities,
    expected year of replacement and costs for replacement of assets,
    underwater components,
    more detailed electrical/ mechanical assessments that were not included in previous
      inspection, and
    consideration of future condition assessment timeframes.




Asset Management Plan: Road Bridges                                                              Page 9

Section 11

The asset conditions are ranked according to the International Infrastructure Management Manual
(IIMM). The combined rating of these assets resulted in an average condition rating of 3 (Good). The
five underpasses included in this total all had a condition rating of 3 (Good), except the Girraween
Underpass that had a condition rating of 1 (New). Because of these condition ratings, the
underpasses have not been identified in the 10 year renewal program. These assets are grouped
consistently as Timber and Concrete and reported accordingly throughout this document. There are
two timber bridges (Old Noosa Rd Bridge & Mary River Rd Bridge) that have reached condition 5
and these bridges are being renewed in accordance with the 10-year capital works program.

The Bridge Working Group are currently developing a Level 2 and 3 bridge inspection priority
program. There is a current list of bridges that are being addressed for inspection over the next 12
months and are listed at Annex E.

In asset reporting an approach to linking individual assets to either timber bridges or concrete
structures has been undertaken. The graph below details the combined Condition Assessments for
both timber bridges and concrete structures which includes the five (5) concrete underpasses
included in concrete assets.




                          Conditions by Number of Assets
       25


       20


       15


       10


        5


        0
                            Concrete                                   Timber

                                             1   2   3   4   5


Figure 1: Condition by Number of Assets


The breakdown of replacement costs by asset condition is depicted in the graph below. The
importance of this graph is to identify the value of each asset condition and where future investments
are required to renew or rehabilitate the bridge assets. There are a number of bridges that have
bridge components that are close to failure that impact the life of the bridge. On the rehabilitation or
renewal of the specific bridge component the overall bridge condition is expected to improve and the
condition rating will be adjusted within the asset management system (T1).

The timing of the renewal of these assets will be addressed in the asset renewal plan that is included
in this AMP and, will be reflected in Council’s 10 year Capital Works Program.




Asset Management Plan: Road Bridges                                                            Page 10

Section 12

                         Replacement cost for Bridge Conditions by Primary
                                             Material
        $70,000,000.00


        $60,000,000.00


        $50,000,000.00


        $40,000,000.00


        $30,000,000.00


        $20,000,000.00


        $10,000,000.00


                $0.00
                                        Concrete                                    Timber

                                                   1   2    3   4    5


Figure 2: Bridge Asset Condition by Replacement Costs

4.4     Operations
Operational costs for the Bridges are those expenses not specifically targeted towards upgrade,
replacement, maintenance or restoration. These day-to-day operational costs have no effect on
bridge conditions but are necessary to keep the management of bridge assets appropriately utilised
and operating within the organisation.

Typical operational activities include:
•    Utility costs.
•    Salaries.
•    Depreciation.
•    Staff training.

               Actual        Actual       Actual           Budget        Budget      Forecast   Forecast
 Year          2014/15       2015/16      2016/17          2017/18       2018/19     2019/20    2020/21
 Operating      $278,392     $450,409      $315,015        $341,840      $324,826    $340,871   $341,991
               Forecast      Forecast     Forecast         Forecast      Forecast    Forecast   Forecast
 Year          2021/22       2022/23      2023/24          2024/25       2025/26     2026/27    2027/28
 Operating     $343,114 $344,240 $345,370 $346,502 $347,638 $348,776                            $349,918


Table 4: Road Bridges Annual Operations Expenditures (actuals and forecasted budget)


It is estimated that operational costs will rise in the future with increasing overheads and safety costs;
particularly the additional use of plant & equipment. Noosa Council will consider various sustainability
measures to minimise the increase in operational costs.



Asset Management Plan: Road Bridges                                                                   Page 11

Section 13

4.5    Bridge Maintenance Plan
Maintenance is fundamental for the ongoing management of the bridges. It is considered an
investment rather than a liability. The bridges rely on maintenance costs as these are a significant
annual investment that directly influence the potential for a bridge asset to reach its intended useful
life. The ongoing development of asset knowledge through asset inspections, improved maintenance
inspections and activities, subsequent defect monitoring and repairs are fundamental in developing
sustainable intervention levels for renewal and replacement of bridge assets.


                 Actual       Actual          Actual       Budget       Budget        Forecast     Forecast
 Year            2014/15      2015/16         2016/17      2017/18      2018/19       2019/20      2020/21
 Maintenance     $2,051,375   $2,297,024      $2,091,252   $1,839,426   $1,680,328    $1,935,120   $1,757,895
                 Forecast     Forecast        Forecast     Forecast     Forecast      Forecast     Forecast
 Year            2021/22      2022/23         2023/24      2024/25      2025/26       2026/27      2027/28
 Maintenance     1,778,787    1,637,718       $1,464,387   $1,418,155   $1,541,528    $1,541,528   $1,721,079


Figure 3: Annual Maintenance Costs by Asset Group

Ongoing maintenance costs are identified to ensure council understands the whole of life costs
associated with the day-to-day management of bridges. The figure below identifies the long term
financial commitment required in maintaining assets. In order to maintain assets to an acceptable
level, the cumulative costs over a ten-year period will equate to $23m. It is proposed to develop a
more detailed list of maintenance activities per annum, by bridge assets, through the utilisation of
the T1 asset management system. Annex C highlights the budget for 2018/19 Maintenance.
However, more detail and longer term planning for maintenance has been identified as an
improvement from this AMP.


                10 Year Operating and Maintenance Expenditures Forecast
 $25,000,000




 $20,000,000




 $15,000,000




 $10,000,000




  $5,000,000




         $-
               2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29

                       Maintenance         Operating       O&M Totals      Cumulative Total


Figure 4: Bridge Operating & Maintenance Costs & Forecast



Asset Management Plan: Road Bridges                                                                Page 12

Section 14

4.6    Asset Renewals
The purpose of developing a renewal plan is to identify assets that need to be replaced to maintain
the current level of service. Asset failure due to lack of renewal will affect the capacity to deliver
future renewals of bridges and subsequently the service bridges provide to the Noosa Community.

Bridge asset renewals are condition based. Recent condition assessments has provided staff the
ability to develop a Capital Renewal Program (Annex D lists the current bridges in the 10 year
renewal program by asset and year). Bridge assets have an estimated useful life of up to 100 years,
it is difficult to forecast the renewal beyond a 20 year period, even with good asset condition
knowledge.

There are still more bridges to be considered in future renewal plans. However, until all the bridges
that require level 3 inspections are completed further development and prioritisation of the renewal
program will be carried out. The individual asset components of the bridge assets are yet to be
componentised consistently within the T1 asset system. The ongoing asset management maturity
and development of the condition assessments and subsequent maintenance and renewal plans
relies heavily on the componentisation of all bridge assets.

Renewal expenditure is work which does not increase the bridges design capacity but restores,
rehabilitates, replaces or renews an existing asset to its original service capacity. Improved condition
assessment data capture is currently being developed to include asset renewal considerations based
on physical conditions and estimates of remaining useful life of assets to guide and improve renewal
programs.

Renewal plans are developed to maintain levels of service to ensure assets achieve their optimal
useful life before they reach the asset condition range of 5. A renewal program is defined in Annex
D and only has bridges that have been identified through the level 3 inspections for renewal. Further
development of the renewal program is required to identify the bridges in need of renewal over the
next 10 years and beyond.

The safety and condition of structures on Council’s road network is critical to the linkage of Noosa’s
communities. The trunk road network in the coastal areas is sensitive at peak periods and the failure
or part closure of any of those bridge assets will result in a reduction of the levels of service on the
community.

The graph below depicts the planned renewals by asset class over the next 10 years. There are
major renewals in 2018/19 for the Old Noosa Road Timber Bridge and Mary River Road Bridge
planning activities on Witta Circle Bridge and Doonella Bridge for future renewals. Other bridges to
be assessed for renewal works include the Orealla Bridge and Cooroy Mountain Road Bridge.

As the bridge assets age, continued CAs are required to monitor the assets and adjust more defined
renewal plans. The graph below enables Council to identify and plan for these significant renewal
activities in the shorter term. Further condition assessments will assist in developing a more robust
and defined 10-year renewal program.

Furthermore, the graph below also identifies the cumulative costs and future investment required in
renewing bridges over a 10-year period. The current renewals are identified in Annex D and are
reflective in Council’s 10 year Capital Works Program on the adoption of this AMP.




Asset Management Plan: Road Bridges                                                            Page 13

Section 15

                                  10 Year Asset Renewal Costs
$16,000,000.00


$14,000,000.00


$12,000,000.00


$10,000,000.00


 $8,000,000.00


 $6,000,000.00


 $4,000,000.00


 $2,000,000.00


        $0.00
                 2018   2019   2020     2021   2022     2023   2024     2025   2026   2027   2028     2029
                                           Renewal Cost      Cumulative


Figure 5: Bridges Asset Renewal Costs



4.7     Capital Upgrades and New Assets
There is a need to develop more maturity in the overall assessment and management of our bridge
assets before there is a consideration for further upgrades and expansion. Evidence based data
such as traffic volumes, vehicle types, trunk networks, cost benefits, sustainability, environmental
impacts and overall community benefit are key indicators when planning for capital upgrades and
new bridge assets.

The development of the Noosa Transport Strategy may have indicators that identify when upgrades
or new bridge assets should be considered. In May 2018, an initiative from the transport strategy
identified an integrated long-term transport proposal called ‘e-Noosa’, for the purpose of seeking
funding for long term initiatives. The e-Noosa concept focused on a subset of the components of
the broader Transport Strategy and Vision that could be implemented as an integrated transport
solution.

An initiative of the e-Noosa that proposes upgrade or new bridge assets for Noosa Council is to
duplicate the Garth Prowd Bridge, to include transit lanes and clear ways on Noosa Parade to
improve bus and bike access. There is no priority or timeframe currently proposed for if/or when this
proposal may be considered and will require Council approval.



4.8     Capitalisation of Assets
All new and renewed assets will be acquired and commissioned in accordance with the Noosa
Council Capital Delivery Framework.




Asset Management Plan: Road Bridges                                                                 Page 14

Section 16

4.9    Disposal and Replacement of Assets
Disposal of assets will be consistent with statutory and regulatory requirements. The replacement
of assets will be driven from the condition assessments.

The disposal and commissioning of assets from the asset register is undertaken in the capitalisation
and asset write-on/off process. This process is being delivered via the Asset Management Branch
and Finance Branch.




Asset Management Plan: Road Bridges                                                         Page 15

Section 17

5. Risk Management
Risk management is a coordinated approach to the management and control of risk by Noosa
Council.
5.1    Critical Assets
The identification of critical assets is based on the consequence of failure multiplied by the likelihood
of failure (adapted from the International Infrastructure Manual 2015 Section 3.2.4). For an indicative
draft table of risk measures refer to Councils Risk Matrix in Council’s Corporate Risk Register.
5.2    Risk Assessment
It is important to have a good understanding of the risks associated with the operations of the Bridge
Assets. Council continues to develop its bridge management activities to ensure that the bridges are
meeting the intended design life and where necessary work on the optimised intervention for
undertaking rehabilitation and renewal activities. However, there are risks associated with delivering
the levels of service above and not being able to enact identified activities as referenced in this asset
management plan, Council has identified the main risks as:

       1. Bridge deterioration and structural failure possibly accelerated by the increasing severity
          in weather and climate change conditions. Currently there is assessments proposed for
          all bridges in marine areas, to identify any calcification and impacts from the saltwater
          environment on these structures. Increased asset failure due to carbonation of concrete
          bridges needs greater emphasis and further investigations.
       2. Asset Performance – No asset failures that influence the service levels.
       3. Asset Knowledge - The need to understand the performance of the bridge assets at
          component level and a componentisation process needs to be undertaken. Improve
          decision making to mitigate bridge related risks.
       4. Climate Change adaptation considerations to be implemented into the asset decision
          making processes.
       5. Funding – the ongoing operational and maintenance costs for bridges will continue to rise
          and efficiencies and cost savings are reviewed regularly. Grant opportunities for
          renewals/upgrades must always be considered.
       6. Workforce Continuity - there is a specialist team within the organisation that is responsible
          for the operations of bridges, the continuity beyond the current workforce must be
          considered over the next 3 to 5 years.

These risks and all other current risks will be regularly reviewed and if necessary, they can be
documented in the Infrastructure Services – Risk Register. Should the need for them to be further
escalated they can be addressed for consideration by the Risk and Audit Committee.

To mitigate these risks there are resulting actions from this AMP. For Council to make informed
decisions, it is understood that focus must be placed on consistent cyclical inspections across all
bridge assets with condition data accurately recorded in Technology One (T1). This then supports
the reconciling of financial asset data, GIS data and inspection data to have a single point of truth
for all road and bridge assets.




Asset Management Plan: Road Bridges                                                             Page 16

Section 18

6. Financial Summary
6.1    Financial Statements and Projections
Council’s bridges play a vital role in connectivity of the 867km road network (both 670km sealed and
197km unsealed roads) across the Noosa Shire. There are a total of 51 Road Bridges and 5
Underpass pedestrian bridges on Council’s asset register that are considered in this AMP. These
bridges have a current replacement value of $103m, which equates to 10% of Council’s financial
assets.

The operational and maintenance expenses for bridges make up approximately 3% of the $70m
annual budget. The capital works program fluctuates from year to year, however, the 2018/19 capital
works program the capital investment of $2.6m for road bridges equates to 9% of the $28m capital
works program.

The Civil Operations Branch Plan details the financial statements and projections associated with
the operational and maintenance expenses for the road bridges on an annual basis. The capital
investments including renewals, upgrades and expansions are highlighted in the annual capital
works program which is reflected in the 10 year capital works program.


6.2    Funding Strategies
The immediate improvements to funding requests for maintenance and renewals in the budget
process are now evidence based and are supported from the condition assessments that have been
carried out.

The funding strategy, key assumptions, reliability and confidence levels are detailed in the Council’s
long-term financial plan. More detailed funding strategies that promote the long-term sustainability
of the road bridges will be further developed and defined in future asset management plans.


6.3    Budget Forecasts
Budget forecasts will continue to be developed as information is captured and reported from the
Technology One (T1) financial system. The annual review of actuals, maintenance and renewal
activities against budget will initiate further development and identify trends that are reportable and
reflect future year forecasts.




Asset Management Plan: Road Bridges                                                            Page 17

Section 19

                                  10 Year Expenditures Forecast
 $35,000,000

 $30,000,000

 $25,000,000

 $20,000,000

 $15,000,000

 $10,000,000

  $5,000,000

         $-
               2017/18 2018/19   2019/20   2020/21   2021/22   2022/23   2023/24   2024/25   2025/26      2026/27

               Maintenance        Operating          Renewal        Gross Total        Cumulative Total


Figure 7: Bridges 10-Year forecasted expenditures

The figure above identifies the current forecasts for the operational, maintenance and renewal
expenses to demonstrate the whole of life costs over a 10-year period for the bridges. In
summarising, the 10-year forecast has an overall expenditure range from a maximum of $7.3m in
2019/20 and a minimum $1.8m p.a. in 2024/25. There will be further asset renewals and
maintenance activities over coming years that will further influence this current forecast. However,
until good asset knowledge of all bridge structures, down to the component level, this type of
predictive modelling will continue to be limited.

The bridge assets have the longest useful life of any asset class maintained by Council. The bridges
useful lives vary based on construction and material type but are estimated between 90 – 130 years.
The oldest bridge operated by Council at present is the Cooroy-Belli Creek Road Bridge “A” identified
in Council’s asset register as being constructed in 1929.

The ongoing maintenance activities development will ensure that future asset failure will be
minimalised and a “no-surprises” approach is attained enabling the achievement of all identified
funding forecasts. This will be greatly supported through the initial development of condition
monitoring to predict potential maintenance and renewal requirements. However, in pulling these
forecasts together the following general assumptions have been identified:
•     Proposed Capital Renewal Program will be funded as per the current Council model adopted;
•     Renewal works will be prioritised according to asset condition;
•     The condition of the assets reflect what is reported within this document;
•     Current maintenance funding levels will meet service level requirements;
•     Renewals, maintenance and isolated failure replacement is generally ‘like for like’;
•     Where a renewal must be provided to a higher standard, the difference in cost between a ‘like
      for like’ renewal and the higher standard is to be treated as an asset upgrade.
•     Depreciation is in accordance with Council Policy;
•     There is no allowance for CPI as the continuing revaluation and condition inspection process
      will make adjustments for current rates.




Asset Management Plan: Road Bridges                                                                         Page 18

Section 20

7. Plan Improvement and Monitoring
7.1    Status of Asset Management Practices
Currently all Asset Management activities are managed within the Noosa Council Asset
Management Governance Framework and enabled through Technology One (T1) asset information
management system.


7.2    Improvement Program
The following initiatives are recommended:

1.    Asset Inventory – Componentisation –
      Ensure that there is one single asset register/hierarchy that captures all parent and child assets
      required; at a level of the lowest or appropriate repairable unit. All other duplicated asset
      lists/registers should be eliminated. The T1 is the Enterprise Asset Management Repository.
      Prior to the revaluation, it is recommended a detailed asset register and data reconciliation
      project establishes a single point of truth for asset data within T1.

2.    Condition Assessments – Consideration for more detailed and regular condition
      assessments, to include all component and sub-component assets of the bridges. Condition
      assessments for the underwater infrastructure should be incorporated in future condition
      inspection routines. Condition assessments should also utilise the standard template to ensure
      both maintenance and renewal activities are developed. The Bridge Working Group are
      currently developing a cyclic Level 2 & 3 bridge inspection priority program that will be over a
      number of years. There is a current list of bridges that are being addressed for inspection over
      the next 12 months and is listed at Annex G.

3.    Workforce Continuity - there is a specialist team within the organisation that is responsible
      for the operations of bridges, the continuity beyond the current workforce must be considered
      over the next 3 to 5 years.

4.    Asset Systems – There is an initial implementation of operational work orders for planned,
      reactive work and inspections to date. There is a number of functions within the T1 system that
      would improve the operational and maintenance activities and as a result further enhance the
      asset management objectives of the organisation. These include:
      i.    Planned maintenance work orders;
      ii.   Costings via work orders;
      iii.  Inspections and defects logged within T1;
      iv.   Asset performance reporting from T1;
      v.    Data capture – asset validation and updating.

5.    Renewal and Maintenance Plans – Plans must be regularly reviewed and incorporated into
      the annual budget process. Continued inspections and recording of asset condition and
      maintenance activities are key to achieving this initiative. This will be a key outcome for the
      Bridge Working Group to regularly review the bridge maintenance and renewal plan. The need
      to develop longer-term maintenance plan beyond a single year is required for more effective
      resource planning.




Asset Management Plan: Road Bridges                                                            Page 19

Section 21

7.3    Monitoring and Review Processes for the Asset Management Plan
This first edition of Asset Management Plan for the bridges refers to current levels of service that
have existed over recent years. This AMP is to be a ‘living’ document reflecting actual practices used
in managing the bridges. In accordance with this, Council will use best practice to balance cost, risk
and performance needs for the bridges.

The AMP will have a high-level annual review for developing the annual budget from the
maintenance and renewal plans. A full document review will occur on a three-year cycle, in line with
the completion of detailed condition assessments and the financial asset revaluation of the bridge
assets.


7.4    Asset Management Effectiveness
The effectiveness of this Asset Management Plan will be measured in terms of:
1.   Adoption of the Road Bridge AMP by Council.
2.   The ongoing development of good asset knowledge through a commitment to recording
     information against assets and the undertaking of cyclic condition assessments at the facility.
3.   Maintenance and renewal plans that are robust and initiate the annual budget process.
4.   Historical asset activities that are recorded and located in Council’s asset management
     system.
5.   Limited reactive work and more planned maintenance activities.
6.   The Road Bridge AMP becomes the reference point of all information that enables good
     decision making for asset related activities and investments.




Asset Management Plan: Road Bridges                                                           Page 20

Section 22

ANNEX A: Measured Levels of Service
 Levels of service

 Bridges: The activities include cyclic inspections and routine scheduled maintenance to
 ensure structures achieve optimum service life.

 Performance     Level of        Measure         Measurement      Target
 Measure         Service                         Criteria

 Reliability     Bridges are     Bridges are     Unplanned        No bridge closures due to
                 operational     fully           maintenance or   asset maintenance failures.
                                 Operational     asset failure
                                 without
                                 defects or
                                 asset
                                 failures

 Quality /       Bridges are     Condition of    Condition        All assets with a score 1, 2 or
 Condition       fit for         Bridge          Rating           3. All assets with score of 4
                 Purpose         Assets                           should be placed on the
                                                                  Capital program for renewal
                                                                  and all assets with a score of 5
                                                                  should be
                                                                  replaced/rehabilitated/renewed
                                                                  or upgraded ASAP.

                                                                  More than 50 or (90%) of the
                                                                  road bridges assets in
                                                                  condition 3 or better.

 Health and      Bridges are     No of           Reported         Zero injuries
 Safety          safe and free   Injuries        Injuries
                 from Hazards

 Legal and       Compliance      Compliance      Audit of Legal   100% Compliant
 Statutory       of Bridge       with Legal,     and Statutory
 Compliance      Management      Statutory       Compliance
                                 Standards
                                 and relevant
                                 codes

 Appearance      Bridges are     Cleanliness     Customer         Less than 5 issues or
 and             clean and       and             Feedback         complaints about poor asset
 Presentation    presentable     maintenance                      appearance and condition per
                 condition       appearance                       year.

                                 Maintenance     Audit of         100% of items in need of
                                 to prescribed   Maintenance      maintenance are performed or
                                 Standards       and inspection   accounted for and prioritised
                                 based on the    activities.      for rectification.
                                 DTMR
                                 Structures
                                 Manual.




Asset Management Plan: Road Bridges                                                              Page 21

Section 23

 Levels of service

 Bridges: The activities include cyclic inspections and routine scheduled maintenance to
 ensure structures achieve optimum service life.

 Performance     Level of        Measure       Measurement      Target
 Measure         Service                       Criteria

 Load Limits     The bridge      Maximum       Reduction in     No more than 1 bridge has a
                 load limits     Load limit    load limit on    reduced load limit (lowered
                 are                           any bridge.      from as designed limit) due to
                 maintained to                                  its poor condition prior to the
                 an acceptable                                  bridge being rehabilitated/
                 level.                                         renewed.




Asset Management Plan: Road Bridges                                                           Page 22

Section 24

ANNEX B: Bridge Asset Register
                                                                                                                                          Anticipated    Asset        Supply &
                                                                                                                          Installation
  Asset     Plant                                   Description                                 Length    Width   Spans                     Year of     Condition    Installation
                                                                                                                             Date
                                                                                                                                         Replacement     Rating         Cost

                    Bridge_Cooroy_Cooroy Belli Creek Road_Bridge 'A'_Br.40_Sr85208020_Old AMS
 1000817   TIMBER                                                                                   10     6.2        1   30/06/1929        2046           3          $294,172
                    526535_Timber
 1000813   TIMBER   Bridge_Cooran_Old Noosa Road_Br.07_Sr85713002_Old AMS 526562_Timber             39     4.4        5   30/06/1936        2031           5          $704,335

 1000828   TIMBER   Bridge_Kin Kin_Wahpunga Lane_Br.10_Sr86050010_Old AMS 526512_Timber             25     3.6        3   30/06/1946        2046           4          $389,929
                    Bridge_Cooroy_Cooroy Mountain Road_Br.26_Sr85209003_Old AMS
 1000818   TIMBER                                                                                   10     6.9        1   30/06/1962        2046           5          $314,680
                    526524_Timber
                    Bridge_Tewantin_Memorial Avenue_Doonella Bridge_Br.51_Sr01144001_Old AMS
 1000871   CONC                                                                                     50     11         5   30/06/1970        2062           4         $2,689,402
                    526544_Concrete
 1000836   CONC     Bridge_Noosa Heads_Weyba Road_Br.55_Sr09559020_Old AMS 526548_Concrete          61     8.5        4   30/06/1971        2062           4         $2,535,373
                    Bridge_Sunrise Beach_Orealla Crescent_Br.62_Sr85251010_Old AMS
 1000869   CONC                                                                                     38     8.8        3   30/06/1971        2038           4         $1,731,342
                    526555_Concrete
                    Bridge_Noosa Heads_Noosa Parade_Br.57_Sr08365003_Old AMS
 1000833   CONC                                                                                     60     7.5        2   30/06/1975        2062           4         $2,200,420
                    526550_Concrete
                    Bridge_Noosa Heads_Noosa Parade_Munna Point Bridge_Br.58_Sr04619017_Old
 1000834   CONC                                                                                    105     7.3        7   30/06/1979        2114           2         $7,592,411
                    AMS 526551_Concrete
                    Bridge_Cooran_Tablelands Road_Bridge 'A'_Br.05_Sr85967013_Old AMS
 1000814   TIMBER                                                                                  15.9    3.7        2   30/06/1981        2046           4          $268,299
                    526509_Timber
                    Bridge_Pomona_McCabes Road_Bridge 'A'_Br.17_Sr85626002_Old AMS
 1000854   TIMBER                                                                                   5.8    3.5        1   30/06/1981        2046           3          $92,580
                    526518_Timber
 1000809   TIMBER   Bridge_Cooran_Brewers Road_Br.01_Sr85112009_Old AMS 526536_Timber                8     3.6        1   30/06/1983        2046           3          $131,345

 1000823   TIMBER   Bridge_Federal_Sankeys Road_Br.43_Sr85866002_Old AMS 526537_Timber               9     3.6        1   30/06/1983        2046           3          $147,763

 1000826   TIMBER   Bridge_Kin Kin_Jeremys Lane_Br.03_Sr85493001_Old AMS 526507_Timber               7     3.3        1   30/06/1983        2046           3          $105,349
                    Bridge_Black Mountain_Uhlmanns Road_Br.25_Sr86030017_Old AMS
 1000806   TIMBER                                                                                   4.8    4          3   30/06/1984        2046           3          $87,563
                    526523_Timber
                    Bridge_Cooroy_Mary River Road meets Maple Street_Bridge
 1000819   TIMBER                                                                                   26     9          3   30/06/1985        2031           5         $1,013,816
                    'A'_Br.35_Sr85619024_Old AMS 526531_Timber
                    Bridge_Lake Macdonald_Lake Macdonald Drive_Br.39_Sr85550052_Old AMS
 1000830   CONC                                                                                     16     3.6        3   30/06/1985        2062           3          $331,357
                    526534_Concrete
 1000824   TIMBER   Bridge_Federal_Skyring Creek Road_Br.23_Sr85911005_Old AMS 526521_Timber        23     4.8        3   30/06/1986        2046           3          $478,313
                    Bridge_Cooran_Tablelands Road_Bridge 'B'_Br.06_Sr85967045_Old AMS
 1000815   TIMBER                                                                                   12     3.6        1   30/06/1987        2046           4          $197,017
                    526561_Timber
                    Bridge_Pinbarren_Upper Pinbarren Ck Road_Bridge 'A'_Br.08_Sr86034000_Old
 1000848   CONC                                                                                     19     4.7        1   30/06/1987        2062           3          $409,426
                    AMS 526510_Concrete
 1000857   TIMBER   Bridge_Pomona_Rules Road_Br.24_Sr85855002_Old AMS 526522_Timber                  9     4          1   30/06/1990        2046           3          $164,181



Asset Management Plan: Road Bridges                                                                                                                                 Page 23

ANNEX B:               Bridge Asset Register

                                             —                                       ;           ee en    Anticipated  er       Sry as
  Asset    Plant                         Description                       Length   iol da) Spans  ae       bao)     er elie   Installation
                                                                                                          aXe) Cela    atl ULale | (erex=i
 1000817  _TIMBER
 1000813  _TIMBER
 1000828  _TIMBER
 1o0osis  TEER | SisSsatmper                                    |                  8   || annenaca |         aoe
 1000871 _ CONC
 1000836 _ CONC
 1000869 _ CONC
 1000833   CONC | Sessoms                                         || 78 || attoeters |                      ase
 1000834 _ CONC
 1000814  TIMBER
 1000854  _TIMBER
 1000809  TIGER | Brdge_Cooran Brewers Road Br.01_Si@sit2009_oW AMS seess6 Timber | [36 [| soosnses |        aoe | 3 | sisioas
 1000823  _TIMBER | Bridge Federal Sankeys Road B43 SiB5866002O14AMS 626597_Timber_ | __—9|_ 36 | 1 | sooeisea | 204s |_| s147.763
 1000806  _TIMBER
 1000819  TIGER | inNBras Sresetsoss Og aMsszesst timber                  || || annmngas |                  aor |
 1000830 _ CONC
 1000824  _TIMBER
 1000815  _TMBER

Asset Management Plan: Road Bridges                                                                                           Page 23

Section 25

Anticipated    Asset        Supply &
                                                                                                                             Installation
  Asset     Plant                                   Description                                    Length    Width   Spans                     Year of     Condition    Installation
                                                                                                                                Date
                                                                                                                                            Replacement     Rating         Cost

                    Bridge_Sunrise Beach_David Low Way_Burgess Creek
 1000866   CONC                                                                                       107     9.1        4   30/06/1992        2062           3         $4,761,220
                    Bridge_Br.64_Sr85251019_Old AMS 526557_Concrete
                    Bridge_Noosaville_Gibson Road_William Gibson Bridge_Br.56_Sr85375010_Old
 1000840   CONC                                                                                       48.3   14.8        3   30/06/1993        2062           3         $3,495,440
                    AMS 526549_Concrete
                    Bridge_Noosaville_Gympie Terrace_James Duke Bridge_Br.52_Sr12981003_Old
 1000841   CONC                                                                                        61     8.5        3   30/06/1993        2062           3         $2,535,373
                    AMS 526545_Concrete
 1000825   TIMBER   Bridge_Kin Kin_Bunneys Lane_Br.02_Sr85128001_Old AMS 526506_Timber                  7     3.6        1   30/06/1994        2046           3          $114,927
                    Bridge_Pomona_Kennedys Road_Bridge 'A'_Br.32_Sr85517003_Old AMS
 1000852   TIMBER                                                                                      10     4.3        1   30/06/1995        2046           3          $196,105
                    526529_Timber
                    Bridge_Castaways Beach_David Low Way_Underpass, Antipodes Close_Br.65_Old
 1000808   CONC                                                                                        30     3          0   30/06/1996        2062           3          $491,859
                    AMS 526558_Concrete
                    Bridge_Noosaville_Saltwater Avenue_Br.54_Sr85061009_Old AMS
 1000842   CONC                                                                                       13.2   11.3        1   30/06/1997        2062           3          $858,077
                    526547_Concrete
                    Bridge_Noosaville_Saltwater Avenue_Jock Sturrock Bridge_Br.53_Sr85861003_Old
 1000843   CONC                                                                                       17.3   12.4        1   30/06/1997        2062           3         $1,234,076
                    AMS 526546_Concrete
                    Bridge_Sunrise Beach_David Low Way_Sobraon Bridge_Br.61_Old AMS
 1000867   CONC                                                                                        52     3          1   30/06/1997        2062           3          $762,812
                    526554_Concrete
                    Bridge_North Shore_Frying Pan Track_Br.49_Sr86305014_Old AMS
 1000844   TIMBER                                                                                      8.9    2.8        1   30/06/1998        2031           4          $113,650
                    526542_Timber
                    Bridge_North Shore_Frying Pan Track_Br.50_Sr86305012_Old AMS
 1000845   TIMBER                                                                                      6.2    2.8        1   30/06/1998        2031           4          $79,172
                    526543_Timber
                    Bridge_Castaways Beach_David Low Way_Castaways Creek
 1000807   CONC                                                                                        30     9.2        1   30/06/2000        2062           3         $1,508,366
                    Bridge_Br.66_Sr12876034_Old AMS 526559_Concrete
                    Bridge_Black Mountain_Lawnville Road_Br.33_Sr85561031_Old AMS
 1000804   TIMBER                                                                                      16     8.8        2   30/06/2001        2046           3          $642,129
                    526530_Timber
                    Bridge_Noosaville_Eenie Creek Road_Underpass_Br.60_Old AMS
 1000839   CONC                                                                                         0     0          0   30/06/2001        2062           3          $950,141
                    526553_Concrete
 1000870   CONC     Bridge_Sunrise Beach_Orient Drive_Underpass_Br.63_Old AMS 526556_Concrete           0     0          0   30/06/2001        2062           3          $324,036

 1000847   TIMBER   Bridge_Pinbarren_Crosiers Road_Br.14_Sr85235014_Old AMS 526567_Timber              9.4    4.2        1   30/06/2004        2046           3          $180,052
                    Bridge_Cooran_Bridge Street_Victor Giles Bridge_Br.48_Sr13968001_Old AMS
 1000810   CONC                                                                                        33     7.5        4   30/06/2005        2062           3         $1,281,421
                    526541_Concrete
 1000829   TIMBER   Bridge_Kin Kin_Williams Road_Br.11_Sr86094001_Old AMS 526513_Timber                 5     3.7        1   30/06/2005        2046           4          $84,371

 1000837   CONC     Bridge_Noosa Heads_Witta Circuit_Br.59_Sr86100001_Old AMS 526552_Concrete         46.5    7.3        2   30/06/2005        2062           4         $1,659,850
                    Bridge_Peregian Beach_Woodland Drive_Murdering Creek
 1000846   TIMBER                                                                                      9.2    3.7        1   30/06/2005        2046           3          $155,242
                    Bridge_Br.67_Sr86105018_Old AMS 526560_Timber
                    Bridge_Cooroy Mountain_Lukes Road_Br.34_Sr85591007_Old AMS
 1000816   TIMBER                                                                                     10.4    4.2        1   31/10/2005        2046           3          $199,206
                    526568_Timber
                    Bridge_Noosaville_Eenie Creek Road_Concrete_Noosa Springs Overpass
 1000838   CONC                                                                                        37    12.5        1   1/01/2006         2062           3         $2,394,575
                    Bridge_Br.73_37m x 12.5m_Drawing No. Not available_SR8730306
                    Bridge_Noosa Heads_Eenie Creek Road_Monks Bridge_Br.72_Sr8730506_Old
 1000832   CONC                                                                                       525     12        16   30/04/2006        2084           3        $22,363,143
                    AMS 526569_Concrete


Asset Management Plan: Road Bridges                                                                                                                                    Page 24

een         Anticipated    Asset        Supply &
   Asset      Plant                                  Description                                Length     iol da)  Spans      D           bao)       oreo litte   Installation
                                                                                                                                ate                        i
                                                                                                                                        aX) ELA ulal    Rating        Cost
                       Bridge_Sunrise Beach_David Low Way_Burgess Creek
  1000866     CONC | Bridge Br.64_Sr85251019 Old AMS 526557_ Concrete                               ae      ae          i   (cece           ma            S        lee
                       Bridge_Noosaville_Gibson Road_William Gibson Bridge_Br.56_Sr85375010_Old
  1000340     CONC     AMS 526549 Concrete                                                         48.3     14.8        3 | 30/06/1993      2062          3        $3,495,440
                       Bridge_Noosaville_Gympie Terrace_James Duke Bridge_Br.52_Sr12981003_Old
  1000841     CONC     AMS 526545 Concrete                                                           61     8.5         3 | 30/06/1993      2062          3        $2,535,373
  1000825    TIMBER | Bridge Kin Kin _Bunneys Lane_Br.02_Sr85128001_Old AMS 526506_Timber                                   30/06/1994      2046                    $114,927
                       Bridge_Pomona_Kennedys Road_Bridge 'A'_Br.32_Sr85517003_Old AMS
  1000852    TIMBER    526529 Timber                                                                 10     4.3         1 | 30/06/1995      2046          3         $196,105
                       Bridge_Castaways Beach_David Low Way_Underpass, Antipodes Close_Br.65_Old
  1000803     CONC     AMS 526558 Concrete                                                           30      3              30/06/1996      2062          3         $491,859
                       Bridge_Noosaville_Saltwater Avenue_Br.54_Sr85061009_ Old AMS
  1000842     CONC     526547 Concrete                                                              13.2    11.3        1 | 30/06/1997      2062          3         $858,077
                       Bridge_Noosaville_Saltwater Avenue_Jock Sturrock Bridge_Br.53_Sr85861003_Old
  1000843.    CONC     AMS 526546 Concrete                                                          17.3    12.4        1 | 30/06/1997      2062          3        $1,234,076
                       Bridge_Sunrise Beach_David Low Way_Sobraon Bridge_Br.61_Old AMS
  1000867     CONC     526554 Concrete                                                               52      3          1 | 30/06/1997      2062          3         $762,812
                       Bridge_North Shore_Frying Pan Track_Br.49_Sr86305014 Old AMS
  1000844    TIMBER    526542 Timber                                                                        2.8         1 | 30/06/1998      2031                    $113,650
                       Bridge_North Shore_Frying Pan Track_Br.50_Sr86305012_Old AMS
  1000845    TIMBER    526543 Timber                                                                6.2     2.8         1 | 30/06/1998      2031                     $79,172
                       Bridge_Castaways Beach_David Low Way_Castaways Creek
  1000807     CONC | Bridge Br.66_Sr12876034_Old AMS 526559 Concrete                                 no                     eee             ma            S          eee
                       Bridge_Black Mountain_Lawnville Road_Br.33_Sr85561031_Old AMS
  1000804    TIMBER    526530 Timber                                                                 16     8.8         2 | 30/06/2001      2046          3         $642,129
  100039      conc | Bilge Noosa                                                              F     of 0 |            0f sovseccr |         aoe           fe | seso.a
                       Bridge_Noosaville_Eenie Creek Road_Underpass_Br.60_Old AMS
  1000870     CONC | Bridge Sunrise Beach Orient Drive_Underpass_Br.63 Old AMS 526556_Concrete |    0] 0 |             0 | 30/06/2001       2062                    $324,036
  1000847.   TIMBER | Bridge_Pinbarren_Crosiers Road_Br.14_Sr85235014_Old AMS 526567_ Timber                                30/06/2004      2046                    $180,052
                       Bridge_Cooran_Bridge Street_Victor Giles Bridge_Br.48_Sr13968001_Old AMS
  1000810     CONC     526541. Concrete                                                              33     7.5         4 | 30/06/2005      2062          3        $1,281,421
  1000829    TIMBER | Bridge_Kin Kin_Williams Road_Br.11_Sr86094001_Old AMS 526513. Timber                                  30/06/2005      2046                     $84,371
  1000837     CONC | Bridge Noosa Heads Witta Circuit_Br.59_Sr86100001_Old AMS 526552. Concrete                             30/06/2005      2062                   $1,659,850
                       Bridge_Peregian Beach_Woodland Drive_Murdering Creek
  1000846    TIMBER | Bridge Br.67_Sr86105018 Old AMS 526560_Timber                                  ca |               1 | 90/06/2005      2046          i         ee
                       Bridge_Cooroy Mountain_Lukes Road_Br.34_Sr85591007_Old AMS
  1000816    TIMBER    526568. Timber                                                               10.4    4.2         1 | 31/10/2005      2046          3         $199,206
                       Bridge_Noosaville_Eenie Creek Road_Concrete_Noosa Springs Overpass
  1000838     CONC | Bridge Br.73_37m x 12.5m_Drawing No. Not available_SR8730306                    a      es           a   ls             ma            2        eeeie
                       Bridge_Noosa Heads_Eenie Creek Road_Monks Bridge_Br.72_Sr8730506_Old
  1000832     CONC     AMS 526569. Concrete                                                         525     12         16 | 30/04/2006      2084          3        $22,363,143
Asset Management Plan: Road Bridges                                                                                                                               Page 24

Section 26

                                                                                                                                            Anticipated    Asset        Supply &
                                                                                                                            Installation
  Asset     Plant                                    Description                                  Length    Width   Spans                     Year of     Condition    Installation
                                                                                                                               Date
                                                                                                                                           Replacement     Rating         Cost

                    Bridge_Noosa Heads_Walter Hay Drive_Eenie Creek Bridge_Br.74_Sr8653006_Old
 1000835   CONC                                                                                      225     13        10   30/04/2006        2082           2        $14,315,722
                    AMS 526570_Concrete
 1000856   CONC     Bridge_Pomona_Mill Street_Br.19_Sr85642002_Old AMS 526573_Concrete                 9     4.2        1   31/10/2007        2062           3          $217,453
                    Bridge_Cooran_Greenridge Pinbarren Road_Bridge 'B'_Br.41_Sr85399000_Old
 1000812   CONC                                                                                      28.8    6.1        3   1/08/2008         2082           2          $960,108
                    AMS 526576_Concrete
                    Bridge_Sunrise Beach_Eenie Creek Road_Girraween
 1000868   CONC                                                                                      260    16.5        0   1/11/2008         2084           3        $11,073,959
                    Bridge_Br.76_Sr85300105_Old AMS 526575_Concrete
                    Bridge_Pomona_Grahams Road_Concrete_Single Lane_Single Span_20.55m long
 1000851   CONC                                                                                      25.5    5          1   21/03/2011        2082           2          $696,800
                    x 5m wide_and AC for 20m on approach roads
                    Bridge_Pinbarren_Upper Pinbarren Creek Road_Concrete_16.65m long x 5m wide
 1000849   CONC                                                                                       21     5          1   16/06/2011        2082           2          $573,835
                    single span
                    Bridge_Ridgewood_Jorgensen Road_Single Span_Reinforced Concrete_11.95m
 1000861   CONC                                                                                      17.7    5          1   21/07/2011        2062           3          $509,117
                    long x 5.2m wide_One lane wide
                    Bridge_Pomona_Exhibition Street_10.9m long x 10.5m wide_reinforced concrete
 1000850   CONC                                                                                      10.4    5.5        1   2/10/2012         2082           2          $683,289
                    and associated roadworks and drainage
                    Girraween Sports Complex_Bebo Arch Underpass_Eenie Creek Road_Sunshine
 1060781   CONC                                                                                        0     0          0   27/06/2013        2042           1          $664,123
                    Beach
 1000827   CONC     Bridge_Kin Kin_Moran Group Road_BR04_Concrete                                     12     4.8        1   12/12/2013        2082           2          $420,508

    2630   CONC     Bridge_Noosaville Walter Hay Dr Underpass Br.75                                    0     0          0      #N/A           2019           3          $950,000
                    PEREGIAN BEACH David Low Way Concrete Road Bridge (near intersection with
    3341   CONC                                                                                       16     14         1      #N/A           2019           3          $860,000
                    Emu Mountain Road)




Asset Management Plan: Road Bridges                                                                                                                                   Page 25

Section 27

ANNEX C: Bridge Maintenance Plan
                                 2018-19 Maintenance Plan
 Asset Number           Asset Description                                                                  Description of Work              Estimate
                        Bridge_Cooran_Tablelands Road_Bridge 'B'_Br.06_Sr85967045_Old AMS
 1000815                526561_Timber                                                                      white ant treatment              $     700.00
 1000826                Bridge_Kin Kin_Jeremys Lane_Br.03_Sr85493001_Old AMS 526507_Timber                 white ant treatment              $     700.00
                        Bridge_Peregian Beach_Woodland Drive_Murdering Creek
 1000846                Bridge_Br.67_Sr86105018_Old AMS 526560_Timber                                      white ant treatment              $     700.00
                                                                                                           White ant treatment paint
 1000804                Bridge_Black Mountain_Lawnville Road_Br.33_Sr85561031_Old AMS 526530_Timber        kerbs, rbs 6lts                  $     800.00
                                                                                                           White ant treatment paint
 1000806                Bridge_Black Mountain_Uhlmanns Road_Br.25_Sr86030017_Old AMS 526523_Timber         kerbs                            $     800.00
                        Bridge_Cooroy_Cooroy Belli Creek Road_Bridge 'A'_Br.40_Sr85208020_Old AMS
 1000817                526535_Timber                                                                      white ant treatment 6lts paint   $     800.00


 1000818                Bridge_Cooroy_Cooroy Mountain Road_Br.26_Sr85209003_Old AMS 526524_Timber          white ant treatment 6lts paint   $     800.00

 1000847                Bridge_Pinbarren_Crosiers Road_Br.14_Sr85235014_Old AMS 526567_Timber              white ant treatment 6lts paint   $     800.00
                        Bridge_Pomona_Kennedys Road_Bridge 'A'_Br.32_Sr85517003_Old AMS
 1000852                526529_Timber                                                                      white ant treatment 6lts paint   $     800.00
                        Bridge_Cooroy_Mary River Road meets Maple Street_Bridge 'A'_Br.35_Sr85619024_Old
 1000819                AMS 526531_Timber                                                                  white ant treatment              $     900.00

 1000813                Bridge_Cooran_Old Noosa Road_Br.07_Sr85713002_Old AMS 526562_Timber                white ant treatment              $     950.00
                        Bridge_Cooran_Tablelands Road_Bridge 'A'_Br.05_Sr85967013_Old AMS
 1000814                526509_Timber                                                                      white ant treatment              $     950.00

 1000828                Bridge_Kin Kin_Wahpunga Lane_Br.10_Sr86050010_Old AMS 526512_Timber                white ant treatment              $     950.00
                                                                                                           white ant treatment 6lts paint
                                                                                                           2 [email protected] long 200x100
 1000823                Bridge_Federal_Sankeys Road_Br.43_Sr85866002_Old AMS 526537_Timber                 @ 43ltm $361                     $    1,161.00
                                                                                                           white ant treatment 2 deck
 1000816                Bridge_Cooroy Mountain_Lukes Road_Br.34_Sr85591007_Old AMS 526568_Timber           6lts paint                       $    1,200.00




Asset Management Plan: Road Bridges                                                                                                             Page 26

Section 28

                        Bridge_Pomona_McCabes Road_Bridge 'A'_Br.17_Sr85626002_Old AMS
 1000854                526518_Timber                                                               3 deck white ant treatment        $    1,350.00
                                                                                                    3 [email protected] long 200x100
                                                                                                    @ $43ltm $541 white ant
 1000809                Bridge_Cooran_Brewers Road_Br.01_Sr85112009_Old AMS 526536_Timber           treatment                         $    1,400.00



                                                                                                    white ant treatment 6lts paint,
 1000829                Bridge_Kin Kin_Williams Road_Br.11_Sr86094001_Old AMS 526513_Timber         realign kerbs $756                $    1,556.00

 1000857                Bridge_Pomona_Rules Road_Br.24_Sr85855002_Old AMS 526522_Timber             white ant treatment 6lts paint    $    1,622.00
                                                                                                    white ant treatment 5 deck
                                                                                                    5.4 long 200x100 @ $43ltm
 1000824                Bridge_Federal_Skyring Creek Road_Br.23_Sr85911005_Old AMS 526521_Timber    $1161                             $    2,111.00
                        Bridge_Cooran_Bridge Street_Victor Giles Bridge_Br.48_Sr13968001_Old AMS
 1000810                526541_Concrete                                                             bank end scour                    $    2,200.00



 1000870                Bridge_Sunrise Beach_Orient Drive_Underpass_Br.63_Old AMS 526556_Concrete   Treat rust in reo patch hb80      $    2,500.00
                                                                                                    white ant treatment I450dia
                                                                                                    girder @ 10 mts $410lmt
                                                                                                    $4100 5 [email protected] long
 1000825                Bridge_Kin Kin_Bunneys Lane_Br.02_Sr85128001_Old AMS 526506_Timber          200x100 @43ltm $903               $    5,700.00

                        Bridge_Noosaville_Eenie Creek Road_Concrete_Noosa Springs Overpass          conduct level 2 $5000 clean
 1000838                Bridge_Br.73_37m x 12.5m_Drawing No. Not available_SR8730306                paint Barriers $2000              $    7,000.00


 Ad-Hoc                 Rubbish Tip Fees                                                                                                     $10,000

 Ad-Hoc                 Incidentals - Nuts / Bolts / Brackets / Screws                                                                       $10,000

 Ad-Hoc                 Level 2 and 3 inspections (refer to Annex E)                                                                  $ 40,000.00
                                                                                                    redo expansion joint adjust
                                                                                                    finger expansion joint
                        Bridge_Noosa Heads_Eenie Creek Road_Monks Bridge_Br.72_Sr8730506_Old AMS    investigate water leak
 1000832                526569_Concrete                                                             engineer                          $ 50,000.00


Asset Management Plan: Road Bridges                                                                                                       Page 27

Section 29

ANNEX D: Bridge Asset Renewal Program
                                                                                                                           Anticipated    Asset
                                                                                                           Installation                                  Supply &
   Asset     Plant                          Description                           Length   Width   Spans                     Year of     Condition
                                                                                                              Date                                   Installation Cost
                                                                                                                          Replacement     Rating

                     Bridge_Cooran_Old Noosa Road_Br.07_Sr85713002_Old AMS
  1000813   TIMBER                                                                    39    4.4        5   30/06/1936        2019           4
                     526562_Timber                                                                                                                   $ 1,519,800
                     Bridge_Cooran_Old Noosa Road_Br.07_Sr85713002_Old AMS
  1000813   TIMBER                                                                    39    4.4        5   30/06/1936        2018           4
                     526562_Timber                                                                                                                   $   130,200
                     Bridge_Cooroy_Mary River Road meets Maple Street Bridge
  1000819   TIMBER                                                                    26    9          3   30/06/1985        2018           4
                     'A'_Br.35_Sr85619024_Old AMS 526531_Timber                                                                                      $   354,200
                     Bridge_Cooroy_Mary River Road meets Maple Street Bridge
  1000819   TIMBER                                                                    26    9          3   30/06/1985        2019           4
                     'A'_Br.35_Sr85619024_Old AMS 526531_Timber                                                                                      $   972,650
                     Bridge_Sunrise Beach_Orealla Crescent_Br.62_Sr85251010_Old
  1000869    CONC                                                                     38    8.8        3   30/06/1971        2018           4
                     AMS 526555_Concrete                                                                                                             $   33,600
                     Bridge_Sunrise Beach_Orealla Crescent_Br.62_Sr85251010_Old
  1000869    CONC                                                                     38    8.8        3   30/06/1971        2020           4
                     AMS 526555_Concrete                                                                                                             $ 1,844,512
                     Bridge_Noosa Heads_Witta Circuit_Br.59_Sr86100001_Old AMS
  1000837    CONC                                                                   46.5    7.3        2   30/06/2005        2019           4
                     526552_Concrete                                                                                                                 $   28,000
                     Bridge_Noosa Heads_Witta Circuit_Br.59_Sr86100001_Old AMS
  1000837    CONC                                                                   46.5    7.3        2   30/06/2005        2020           4
                     526552_Concrete                                                                                                                 $   743,975
                     Bridge_Noosa Heads_Witta Circuit_Br.59_Sr86100001_Old AMS
  1000837    CONC                                                                   46.5    7.3        2   30/06/2005        2021           4
                     526552_Concrete                                                                                                                 $   769,381
                     Bridge_Tewantin_Memorial Avenue_Doonella
  1000871    CONC                                                                     50    11         5   30/06/1970        2020           4
                     Bridge_Br.51_Sr01144001_Old AMS 526544_Concrete                                                                                 $ 1,568,210
                     Bridge_Tewantin_Memorial Avenue_Doonella
  1000871    CONC                                                                     50    11         5   1/07/1970         2021           4
                     Bridge_Br.51_Sr01144001_Old AMS 526544_Concrete                                                                                 $   281,890
                     Bridge_Tewantin_Memorial Avenue_Doonella
  1000871    CONC                                                                     50    11         5   2/07/1970         2019           4
                     Bridge_Br.51_Sr01144001_Old AMS 526544_Concrete                                                                                 $   17,500
                     Bridge_Noosa Heads_Witta Circuit_Br.59_Sr86100001_Old AMS
  1000837    CONC                                                                   46.5    7.3        2   30/06/2005        2020           4
                     526552_Concrete                                                                                                                 $   743,975
                     Bridge_Noosa Heads_Witta Circuit_Br.59_Sr86100001_Old AMS
  1000837    CONC                                                                   46.5    7.3        2   30/06/2005        2021           4
                     526552_Concrete                                                                                                                 $   113,282
                     Bridge_Kin Kin_Wahpunga Lane_Br.10_Sr86050010_Old AMS
            TIMBER                                                                    25    3.6        3   30/06/1946        2020           4
  1000828            526512_Timber
                                                                                                                                                     $   21,000
                     Bridge_Kin Kin_Wahpunga Lane_Br.10_Sr86050010_Old AMS
  1000828   TIMBER                                                                    25    3.6        3   30/06/1946        2021           4
                     526512_Timber                                                                                                                   $   529,200
                     Bridge_Noosa Heads_Noosa Parade_Br.57_Sr08365003_Old
  1000833    CONC                                                                     60    7.5        2   30/06/1975        2022           4
                     AMS 526550_Concrete Garth Proud                                                                                                 $   769,381
                     Bridge_Noosa Heads_Noosa Parade_Br.57_Sr08365003_Old
  1000833    CONC                                                                     60    7.5        2   30/06/1975        2021           4
                     AMS 526550_Concrete Garth Proud                                                                                                 $ 1,242,636
                     Bridge_Cooran_Tablelands Road_Bridge
  1000815   TIMBER                                                                    12    3.6        1   30/06/1987        2021           4
                     'B'_Br.06_Sr85967045_Old AMS 526561_Timber                                                                                      $   171,920


Asset Management Plan: Road Bridges                                                                                                                          Page 28

ANNEX D:                  Bridge Asset Renewal                             Program

   Asset     Plant                       Description                     Tater ta) Width Spans     weal      alvin       Condition    est
                                                                                                             Replacement   CLiale|

  1000871     _CONc
  1000871     _CONc
  1000871     _CONc

  1000828             526512_Timber                                                                                                  $   21,000

Asset Management Plan: Road Bridges                                                                                                         Page 28

Section 30

Bridge_Cooran_Tablelands Road_Bridge
  1000815   TIMBER                                                                12    3.6   1   1/07/1987    2022   4
                     'B'_Br.06_Sr85967045_Old AMS 526561_Timber                                                           $   233,380
                     Bridge_Pomona_McCabes Road_Bridge
            TIMBER   'A'_Br.17_Sr85626002_Old AMS 526518_Timber - Replace with    5.8   3.5   1   30/06/1981   2024   4
  1000854            Culverts                                                                                             $   300,000
                     Bridge_Cooran_Tablelands Road_Bridge
  1000814   TIMBER                                                               15.9   3.7   2   30/06/1981   2029   4
                     'A'_Br.05_Sr85967013_Old AMS 526509_Timber                                                           $   320,000
                     Bridge_Noosa Heads_Weyba Road_Br.55_Sr09559020_Old
  1000836    CONC                                                                 61    8.5   4   30/06/1971   2020   4
                     AMS 526548_Concrete                                                                                  $   110,000
                     Bridge_Noosa Heads_Weyba Road_Br.55_Sr09559020_Old
  1000837    CONC                                                                 61    8.5   4   1/07/1971    2023   4
                     AMS 526548_Concrete                                                                                  $   320,000
                     Bridge_Cooroy_Cooroy Mountain Road_Br.26_Sr85209003_Old
            TIMBER                                                                10    6.9   1   30/06/1962   2020   4
                     AMS 526524_Timber
  1000818                                                                                                                 $   314,680
                     Bridge_North Shore_Frying Pan Track_Br.49_Sr86305014_Old
  1000844   TIMBER                                                                8.9   2.8   1   30/06/1998   2031   4
                     AMS 526542_Timber                                                                                    $   113,650
                     Bridge_North Shore_Frying Pan Track_Br.50_Sr86305012_Old
  1000845   TIMBER                                                                6.2   2.8   1   30/06/1998   2031   4
                     AMS 526543_Timber                                                                                    $   79,172




Asset Management Plan: Road Bridges                                                                                              Page 29

Bridge_Cooran_Tablelands Road_Bridge
   1000815    ‘MBER | \e B06 $185967045 Old AMS 526561_Timber                    ta    ee           a                  Ae                     $  233,380
                       Bridge_Pomona_McCabes Road_Bridge
              TIMBER | 'A'_Br.17_Sr85626002_Old AMS 526518 Timber - Replace with 5.8   3.5         1   30/06/1981      2024
   1000854            Culverts                                                                                                                $  300,000
                       Bridge_Cooran_Tablelands Road_Bridge
   1000814    TIMBER | :~: Br.05 $185967013 Old AMS 526509 Timber                                      ee                                     $  320,000
                       Bridge_Noosa Heads_Weyba Road_Br.55_Sr09559020_Old
   1000836     CONC | ang 526548 Concrete                                       61     8.5         4|  30/06/1971      2020                   $   110,000
                       Bridge_Noosa Heads_Weyba Road_Br.55_Sr09559020_Old
   1000837     CONG    AMS 526548 Concrete                                       61    8.5         4    1/07/1971      2023                   $  320,000
              TIMBER   Oe ebeeed a Sea    Mountain Road_Br.26 Sr85209003 Old     10                1   30/06/1962      2020
   1000818                       -                                                                                                            $  314,680
                       Bridge_North Shore_Frying Pan Track_Br.49_Sr86305014_ Old
   1000844    TIMBER   AMS 526542 Timber                                               2.8         1   30/06/1998      2031                   $   113,650
                       Bridge_North Shore_Frying Pan Track_Br.50_Sr86305012_Old
   1000845    TIMBER   AMS 526543 Timber                                        6.2    2.8         1   30/06/1998      2031                   $   79,172

Asset Management Plan: Road Bridges                                                                                                                  Page 29

Section 31

ANNEX E: Bridge Level 2 & 3 Inspections List



                       Bridges - Level 2 & 3 Inspections List
  Priority       Asset         Level
                                         Report Required By                                   Description
    No.         Number        Required
                                          End of July 2018
      1         1000836           3                                       Concrete Bridge (br. 55). Noosa Heads, Weyba Road.
                                          Out for Quotation
                                          End of July 2018
      2                                                                Concrete Bridge (Br. 51). Tewantin, Memorial Ave, Doonella.
                1000871           3       Out for Quotation
                                                              Concrete Bridge (Br. 57). Garth Prowd (Sheraton) Bridge, Noosa Parade, Noosa
      3
                1000833          3         December 2018                                          Heads.
     4          1000837          3         December 2018                   Concrete Bridge (Br. 59). Witta Bridge, Noosa Heads.
     5          1000807         2&3        December 2018      Concrete Bridge (Br. 66). Castaways beach, David Low way. Castaways Creek.
     6          1000866          3         December 2018        Concrete Bridge (Br. 64). Sunrise Beach, David Low Way. Burgess Creek.
     7          1000841          2         December 2018           Concrete Bridge (Br. 52). Noosaville, Gympie Terrace, James Street.
     8          1000840          2         December 2018                    Concrete Bridge (Br. 56). Noosaville, Gibson Road.
     9          1000810          3         December 2018                     Concrete Bridge (Br. 48). Cooran, Bridge Street.
     10         1000870          2         December 2018            Concrete Bridge (Br. 63). Sunrise Beach, Orient Drive. Underpass.
     11         1000817          3         December 2018                    Timber Bridge (Br. 40). Cooroy, Bellie Creek Road.
     12         1000804          3         December 2018                 Timber Bridge (Br. 33). Black Mountain, Lawnville Road.
     13         1000852          3         December 2018                    Timber Bridge (Br. 32). Pomona, Kennedys Road.




Asset Management Plan: Road Bridges                                                                                                  Page 30

Section 32

ANNEX F: Bridge Stakeholders
The internal and external stakeholders for the Bridges are detailed below:

 Role                         Function
 Internal
 Council Staff                Council officers play a major role in managing assets to ensure that they
                              provide a level of service that meets the needs of both residents and
                              visitors to the area. Council officers implement the components identified
                              in the road bridges asset management plan.
 Elected Council Officers     This stakeholder group includes Councilors and the Mayor for the Council.
                              They are primarily responsible to ensure that their decisions represent and
                              reflect the needs of the wider Noosa community.
 Bridge Working Group         Provides technical advice to improve decision making across all internal
                              stakeholders. The group must ensure the asset management planning
                              covers the whole of life and optimally balances cost, risk and performance
                              of the bridges where possible.
 Asset Manager                Infrastructure Services Director responsible for Infrastructure Services
                              branch management.
 Civil Operations – Bridge    Responsible for the day-to-day operations and maintenance activities and
 Crew                         minor to moderate capital works on timber and concrete bridges.
 Asset Management Branch      Responsible for facilitating Level 3 inspections in developing renewal
                              programs and delivering the bridge renewals.
 Project Delivery Team        Responsible for delivering the bridge renewals, upgrades and expansions.
 Finance                      Ensures that the appropriate level of financial information is made
                              available to Infrastructure Services branch management.
 External
 Community & Residents        Residents are the core users of road bridges. Their needs, wants and
                              expectations are conveyed to Council, which should be reflected in the
                              levels of service for maintaining a good road network.
 Councils Insurer             Ensures that all insurance and risk are adequately addressed.
 Visitors                     Visitor’s wants, needs and expectations drive the development in areas of
                              high tourism usage.

It is important that the defined roles have the capability and capacity within their management
responsibility to make good on the responsibilities assigned to them. From stakeholder discussions
held during development of the Asset Management Improvement Roadmap, some of these
responsibilities may be centralised in the first instance and then transferred to other parts of the
Organisation when the appropriate capability and/or capacity is developed.




Asset Management Plan: Road Bridges                                                                Page 31

Section 33

ANNEX G: Document Management
Document Owner

Revision     Date                             Document Owner                         Date Approved

1.0          01/06/18                         Asset Planning Manager




Document History

Revision    Date           Reviewed By                      Approved By              Date Approved
1.0         01/07/2018     Asset Planning Manager           Asset Planning Manager   00/00/18




Distribution of Copies

Revision          No. of Copies                        Issued to
1st draft         1 x electronic copy                  Asset Planning Manager




Noosa Council Associated Asset Management Documents

Document                                                 Date         Approved By
Strategic Asset Management Plan (SAMP)                   2017         Council
Noosa Council Asset Management Roadmap                   2016         Council

Abbreviations

Abbreviations                  Meaning
AM                             Asset Management
AMP                            Asset Management Plan
CA                             Condition Assessment
ISO                            International Standards Organisation
KPI                            Key Performance Indicators
(LoS)                          Level of Service
SAMP                           Strategic Asset Management Plan




Proposed Amendments

No      Section       Proposed Amendment




Asset Management Plan: Road Bridges                                                             Page 32

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.