Original source · versioned page text
2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Planning & Environment
Committee Agenda
7 July 2020
Item 3 - Attachment 1
Bring Back the Fish
Restoration and conservation of shellfish ecosystems in the Noosa River
estuary
Project Management Plan
25th of July 2019 – 30th of September 2022
June 2020
© The Nature Conservancy Australia
This project was made possible by The Nature Conservancy, Noosa Shire Council, The Thomas Foundation
and Australian Marine Conservation Society. The project is located on Kabi Kabi Sea Country.
1
BRING BACK THE FISH: PROJECT MANAGEMENT PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.