Original source · versioned page text
2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn • Provide resource support as required
• For shell recycling, follow TNC standard process for Shuck don’t Chuck
Table 7. Deliverable checklist for Objective 3 (to be completed in six monthly, annual and final reports).
Deliverables Measurable outcomes Status and notes
(Not Started/In
Progress/Delayed/Completed)
(A3.1) Community, industry and • Records of public and
stakeholder consultation to stakeholder consultation,
identify most appropriate including one-on-one
community volunteering meetings, open forums,
opportunities (e.g. shell recycling, media, etc.
oyster gardens, oyster watch,
video monitoring).
(A3.2) Establish at least one • Record of volunteer hours
community volunteering program dedicated to community
identified from the above process volunteering programs, such
which takes into account current as: shell recycling, oyster
and future resources, gardens, oyster watch, video
management and interest. monitoring.
29
BRING BACK THE FISH: PROJECT MANAGEMENT PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.