Log in to see the plans as drawn (A4.2) Restoration across multiple • In addition to the two initial
further sites, as determined by sites, a number of sites
restoration suitability modelling comprising a minimum of a
and outcomes of community further aggregated 600m2
consultation. surface area of restored
oyster ecosystem in the
Noosa River estuary.
(A4.3) Monitoring and evaluation • Annual monitoring and
study for both pilot and full evaluation report card with 6
restoration sites. Monitoring to monthly status reports to be
include oyster metrics, provided.
invertebrates and fish use
(detailed in MER Plan).
7. Objective Five: Noosa River Plan
7.1 Purpose and deliverables
The purpose of objective five is to provide technical and expert support to NSC particularly in regards to planning,
implementation and evaluation associated with the draft Noosa River Plan and other coastal and marine management
plans including the Noosa Environment Strategy.
The objective recognises that TNC has technical skills and experiences across a broad range of marine and coastal
management areas and that these skills and experiences would benefit NSC staff overseeing the implementation of
the Noosa River Plan and Noosa Environment Strategy. Delivery mechanisms include:
• Informal advice through meetings and one-one dialogue
• Formal requests for peer review
• Structured decision-making workshops and trainings
• Study tours
• Coda Fellowships (internal TNC temporary work placements)
Access to experts in relevant fields can include TNC local staff, TNC international staff and TNC external networks.
Deliverables associated with this objective are:
(A5.1) Run workshop with Noosa Council to identify ongoing focus areas for TNC support.
*(A5.2) Provide technical/peer review on minimum five plans/reports/studies if requested by Noosa Council.
*(A5.3) Facilitate a minimum of three study tours of relevant sites in line with objectives and scope of the program in
Australia/US if requested by Noosa Council (flights and incidentals covered separately by Noosa Council,
accommodation and in-country travel covered by this Grant).
*(A5.4) Develop a Conservation Action Plan for specific issues (not yet determined) relevant to the Noosa Estuary
(including community workshops) if requested by Noosa Council.
36
BRING BACK THE FISH: PROJECT MANAGEMENT PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.