Original source · versioned page text
2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnExamples of Key messages
Primary message
1 Restoring shellfish ecosystems will re-establish a previously common ecosystem in the Noosa River estuary
and boost estuary health by helping to clean the water, enhance biodiversity and increase fish life.
2 This project is part of a suite of environmental initiatives delivered under the Noosa River Plan designed to
improve the environmental health and recreational vale of the estuary.
3 This project is part of TNC’s national shellfish restoration project that aims to rebuild 60 shellfish
ecosystems across Australia. If achieved, the project will proclaim Australia the first nation in the world to
have recovered a critically endangered marine ecosystem. Shellfish restoration projects in Melbourne’s
Port Phillip Bay and South Australia’s Gulf St Vincent have already been completed with others underway
near Adelaide, SA; Perth and Mandurah, WA, and now Noosa, QLD.
Secondary messages
• Shellfish ecosystem restoration works in tandem with various other estuary and catchment management
initiatives to support the health of the Noosa River under increasing challenges such as population
growth and climate change impacts (they are not a silver bullet but enhance overall estuary resilience).
• Shellfish ecosystems were once common in the Noosa River estuary. These were extensively
commercially harvested in the late 1800s and along with changes in catchment land use and urban
development, these impacts are collectively responsible for their decline.
• This project is a collaborative effort. Its success depends on working with a wide range of stakeholders
including government, scientists, industry, indigenous groups and community groups.
• As well as improving estuary health, this project provides opportunities for community engagement,
education and industry participation through shell recycling and ecosystem monitoring.
• Previous trials undertaken in the Noosa River were just that – trials. It was not anticipated at the time
that the final shellfish ecosystems would look anything like the initial experimental shell-filled coir bags.
Previous trials, and studies, have helped answer questions around oyster spat availability, interaction
with adjacent habitats, human recreation impacts and siltation.
• This project has been made possible by the generous support of Noosa Shire Council, The Nature
Conservancy, The Thomas Foundation and Australian Marine Conservation Society.
• People interested in learning more about the project, becoming involved or providing a donation, can
contact Project Manager, Craig Bohm ([email protected]), or visit The Nature Conservancy website at
http://natureaustralia.org.au
Communication goals
A. Improve awareness amongst local community, businesses and visitors on the objectives and outcomes of the
project and need for the Noosa River Plan and associated activities.
B. Spark greater community interest and stewardship in supporting shellfish restoration and wider estuary
health.
C. Encourage further funding support in the project (i.e. to support more habitat restoration, ongoing
monitoring, and/or local training and/or employment opportunities.
D. Acknowledge project funders and supporters and demonstrate our commitment to project delivery.
We will do this by:
i. Promoting all newsworthy stages of the project to print, TV, radio and online media through media
statements, media briefings and social media channels.
ii. Building general community awareness of the project through face-to-face interactions such as guest
presentations and workshops.
iii. Building key stakeholder and donor awareness of the project through targeted briefings and site trips.
Primary media contact for all media queries
Tony Jupp, Associate Director of Communications, The Nature Conservancy. Email: [email protected]
49 | Bring Back the Fish MER plan 2020 – 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.