Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
1. Executive Summary
This Project Management Plan (Plan) details the work-flow associated with The Nature Conservancy’s (TNC) and Noosa
Shire Council’s (NSC) Bring Back the Fish conservation project for the Noosa River Estuary. The period of the plan is
the 25th of July 2019 to the 30th of September 2022, as per the related TNC-NSC Alliance and Funding Agreement for
this project.

The project proposes to establish an innovative and regionally significant Noosa River Partnership, amongst Noosa
Shire Council, The Nature Conservancy and the Noosa Community, to improve the health and resilience of the Noosa
River estuary and the industries and local communities that rely on its long-term health.

The focus of the Partnership is to:

    •     Improve the health and resilience of Noosa’s marine and estuarine environment through innovative
          restoration and coastal resilience projects;
    •     Capitalize on the expertise of The Nature Conservancy’s global networks and experience (through knowledge
          brokering, mentoring, study tours and access to subject matter experts) to improve Noosa River
          management and strengthen the long-term social, environmental and economic health and resilience of the
          Noosa River and surrounding marine environment;
    •     Demonstrate a leading example of a replicable, environmentally-focused, collaborative alliance that achieves
          superior outcomes for the environment and local communities compared to existing river and marine
          management models; and,
    •     Increase government (State and Federal), private, industry and community support for restoration and
          conservation-focused activities that improve the long-term social, economic and environmental health and
          resilience of the Noosa River and surrounding marine environment.

The Partnership, delivered through this Project, will initially prioritize the restoration of shellfish ecosystems in the
lower estuary (as described below) in addition to:

    •     Providing general strategic support/advice for planning, management and evaluation associated with the
          new Noosa River Plan and Noosa Environment Strategy and other initiatives and projects associated with the
          river system;

    •     Engaging the Noosa community and businesses in meaningful volunteering, citizen science and marine
          education opportunities;

    •     Coordination of research and associated projects that will inform and contribute to implementation of the
          Noosa River Plan and Noosa Environment Strategy, with a particular focus on seagrass mapping and
          restoration and living shorelines; and,

    •     Critical evaluation and potential reform of current and future management activities with a particular focus
          on opportunities for sustainable commercial and recreational fishing and associated activities.

Shellfish ecosystem restoration methodology will follow standards aligned with best practice shellfish restoration and
the Society for Ecological Restoration (SER) global guidelines.

A number of previous projects, including a three-year study led by the University of Sunshine Coast, established the
feasibility of shellfish ecosystem restoration by demonstrating sufficient shellfish recruitment and survival, and
invertebrate colonization, at a number of locations throughout the lower estuary. Following on from this initial work,


                                                                                                                      5
        BRING BACK THE FISH: PROJECT MANAGEMENT PLAN
Log in to download the original file

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.