Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Targets, goals and objectives
The development of the monitoring, evaluation and reporting (MER) process follows a MER framework as outlined
in
Figure 4: Framework of monitoring, evaluation and reporting process for TNC shellfish restoration projects, which
follows the Open Standards for the Practice of Conservation. Definitions of MER level terminology is show on the
left and an example of each.

At the highest level, there are broad restoration targets with goals and objectives which hierarchically convey the
objectives of the project. Each target can have multiple goals and objective. Each objective can have at least one
indicator (but potentially more) that assesses whether the objective has been met. Thus, each target could have
single or multiple goals that can be outlined by single or multiple objectives that are in turn measured by single
or multiple indicators, with each indicator being measured by a specific method. The process outlined here is
derived from the Open Standards for the Practice of Conservation 15.




Figure 4: Framework of monitoring, evaluation and reporting process for TNC shellfish restoration projects,
which follows the Open Standards for the Practice of Conservation. Definitions of MER level terminology is show
on the left and an example of each on the right




15
     http://cmp-openstandards.org/

60 | Bring Back the Fish MER plan 2020 – 2022
Log in to download the original file

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.