Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
   enhances                             i 12. Benthic
    marine                              functional groups:
  biodiversity                          Increased                                                          Functional
                                                                                         Diver surveys:
                                        benthic                Change compared                              Groups >      Before and after
                                                                                         RLS; intertidal
                                        functional             to baseline and                              control/       S. glomerata       TNC
                                                                                        surveys; oyster
                                        diversity in           control (#/m2)                               baseline          seeding
                                                                                            baskets
                                        contrast to                                                          (#/m²)
                                        control and
                                        before monitoring
   GOAL 5.
   Monitor
 water quality
                    OBJECTIVE 7.                                                                                              Monthly.
       to                                                      Change compared
                     Explore the                                                                                           Baseline and
 demonstrate                            i 13. Turbidity/susp    to baseline and
                   capacity for the                                                                          Secchi         throughout
      that                              solids around          controls for turbidity   turbidity/secchi
                     developing                                                                             depth >       project. Unlikely    ?
 construction                           restoration site        (NTU/mg.L) and                disk
                    ecosystem to                                                                            baseline      to see change
  of the reef                           reduced                water clarity (Secchi
                    reduce water                                                                                              until reef
  enhances                                                           depth)
                       turbidity                                                                                             matures.
   marine
  ecological
    health
                                 Performance                                                    Planned      Frequency/Timin
     Goal             Objective                             Metric              Method                                            Responsibility
                                   indicator                                                     Output               g
       SOCIO-ECONOMIC TARGET: To create opportunities for the local community, recreational users and businesses in the Noosa Shire through shellfish reef restoration.
                                          i 13. Stories/                                     Written,
                   OBJECTIVE 8. To
                                          testimonials.                                     recorded
                     qualitatively                                                                           #stories/       Ongoing
                                          Qualitatively                                 (audio & video)
     GOAL 6.         demonstrate                                        TBD                                testimonials     throughout        TNC
                                        describe benefits                                of testimonials
    Within the      benefits to the                                                                         / mentions        project
                                          to the local                                    collected by
 timeframe of      local economy
                                           economy.                                       Project staff.
   the project
 demonstrate                            i 14. No of local      Summarise number                                              Ongoing
                                                                                        Data collected
   the benefit                          full-time jobs to      of local jobs used in                       >baseline        throughout        TNC
                                                                                        by Project Mgr
    of shellfish   OBJECTIVE 9. To      deliver project              Project                                                  project
 reefs to local     demonstrate
    economy        delivery of jobs                            Summarise number
                                        i 15. Number of                                                                      Ongoing
                                                                     of local           Data collected
                                        local contractors                                                  >baseline        throughout        TNC
                                                               contractors/business     by Project Mgr
                                        engaged                                                                               project
                                                                     es used



71 | Bring Back the Fish MER plan 2020 – 2022
Log in to download the original file

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.