2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 managemen               been           leveraged
 t throughout         leveraged         (including In-kind)
  the project

                    OBJECTIVE 11.                                Cumulative
                                        i 24. Project                                                                 8 month
                         Project                              expenditure report,   Data collected
                                        outputs delivered                                               TBD        cumulative and           TNC
                   delivered within                            Annual progress      by Project Mgr
                                        within budget                                                               annual report
                         budget                                    report
                    OBJECTIVE 12.
                     Demonstrate
                        effective       i 25. TAG
                                                               Summarize TAG
                       technical        meetings                                    Data collected
    Goal 10.                                                  meeting details, #                        TBD           Quarterly             TNC
                         advice         coordinated                                 by Project Mgr
 Demonstrate                                                     attendees
                        provided        quarterly and
   Technical
                      throughout        attended by key
    Advisory
                         project        personnel
     input
                    OBJECTIVE 13.
  throughout                                                                        Data collected
                    Restore each                              To be determined                                          TBD in
  the project                                                                       by Project Mgr                                     TNC/ Agencies/
                      site to meet      i 26. Permit           once conditions                                     consultation with
                                                                                         and            TBD                             Contractors/
                    environmental       conditions met          have been set                                        compliance
                                                                                    Contractors as                                        Experts
                    conditions set                            through approvals                                        officers
                                                                                       required
                     in approvals
    Goal 11.
                    OBJECTIVE 14.
 Demonstrate
                    Demonstrate         i 27. No of project
    effective                                                                                        Milestones
                     timely and         milestones                                                                    Ongoing
     project                                                                        Data collected   delivered
                       effective        delivered within      % delivered on time                                    throughout             TNC
 managemen                                                                          by Project Mgr   effectively
                        project         specified                                                                      project
 t throughout                                                                                         on time
                    management          timeframe
     project
                    and delivery
    delivery




74 | Bring Back the Fish MER plan 2020 – 2022
Log in to download the original file

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗