Skip to the record
Every meeting, every word.

Original source · versioned page text

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Annex 3: Monitoring methods: Ecological

An overview of monitoring methods deployed in the TNC’s shellfish restoration program is provided below
together with the associated key performance indicators. The monitoring methods described here are adapted
from the Shellfish Habitat Restoration Monitoring and Assessment Handbook 26. Some methods may be adapted,
or omitted, as practically and efficiency demands.

Mapping restoration sites and monitoring sampling sites

Method: Multi-beam sonar
To map the dimensions, bathymetry monitoring area of subtidal shellfish restoration sites,
multibeam sonar is often used. Using this method, a multibeam sonar ‘towfish’ is deployed
from a vessel and transects are run in a grid pattern over the potential, or pre-determined restoration site/s. Echo
soundings using multibeam sonar is are accurate to 0.1 m. The survey grid is provided in ASCII format to Chart
Datum at both 5 m and 25 m grid spacings, or is determined using one of the following formulas:

                             Side-scan Sonar Lane width = Range – (Altitude + Overlap)

Altitude is the altitude (height) of the ‘towfish’ scanning unit above the seafloor (this would be a value equal to
10% of the range), and overlap is the desired overlap between lanes (overlap of 10%).

                             Multi-beam Sonar Lane width = Total Range – Overlap

The total range is determined by the frequency used (generally 3 times the water depth but check manufacturer’s
specifications) and desired overlap is ideally 10 percent of the total swath width).

The results of the scans are then presented for interpretation.

Method: aerial/satellite imagery/GPS
For mapping the total area and monitoring areas of shallow-subtidal and intertidal restoration sites, multi-beam
sonar is not a practical survey method. Instead, aerial/satellite imagery or drones and a GIS are employed.
Alternately, for intertidal/shallow subtidal sites, the edge of the reef can be walked around using a handheld GPS
logging the track and the area can be calculated by the internal area of the track.

Determining shellfish restoration impact by area

Method: Physical measurement
The vertical growth of the shellfish ecosystem can be measured by periodically placing a ruler (or meter stick or
graduated rod) vertically on the site, with careful contact at the sediment surface, and then using another ruler
(or other thin, flat, rigid object) to lie horizontally on top of the shell and against the stick to make the height
observation. The average of these measurements is taken to determine the mean height.

Key Performance Indicators

i1. Total area of restoration substrate deployed (m3) – Total area of patches/rows of substrate, with and without
live oysters, deployed within the project footprint.

i2. Total restoration footprint (m3) – Total area of seafloor encompassing all substrates deployed in a given
restoration site and/or all sites throught the estuary.

i3. Total restoration substrate deployed (t) or (m3) – As deterined by the quantity of substrate, usually rubble/rock
+ dried oyster shell + spat on shell + adult oysters (or combinations thereof) that is deployed from the vessel, or
set on the seabed at a given restoration site, or deployed across all restoration sites.


26
     The Nature Conservancy et al, Oyster Habitat Restoration Monitoring and Assessment Handbook


76
Log in to download the original file

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.