Skip to the record
Search everything, all in one place.

Original source · versioned page text

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Deliverables              Measurable outcomes       Tracking   Progress and notes

 (A1.1) Hiring of full     •   PM in place
 time Project
 Manager and
 allocation of TNC and
 NSC support staff to
 the project
 (A1.2) Delivery of        •   Project Plan
 Project Plan (this            completed and
 Plan),                        endorsed
 communication plan,       •   Comms Plan
 and risk                      completed and
 assessment(s)                 endorsed
                           •   Monitoring and
                               Evaluation Plan
                               completed and
                               endorsed
 (A1.3) Establishment      •   TAG in place
 of a Project Technical    •   Evidence of Kabi
 Advisory Group for            Kabi engagement
 reef restoration and
 associated activities
 (A1.4) Participation      •   community
 and delivery of public        engagement
 education and                 forums
 engagement forums         •   3 media
 and media                     statements
 statements                    released
 (A1.5) Annual and         •   3 six monthly
 six-monthly project           status updates
 reporting                 •   3 annual reports
 (A2.1) Shellfish          •   Shellfish
 restoration suitability       restoration
 model incorporating           suitability model
 physical parameters           which
 of oysters and public         incorporates
 and industry usage,           industry, Kabi Kabi
 access etc. to                and public
 identify priority sites       interests.
 for restoration.
 (A2.2) Obtain             •   All relevant
 necessary State               permits secured
 Government
 permits/authorities
 including particular
 resource allocation



85 | Bring Back the Fish MER plan 2020 – 2022
Log in to download the original file

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.