outcomes of aggregated 600m2
community surface area of
consultation. restored shellfish
ecosystem in the
Noosa River
estuary.
(A5.1) Run workshop • Workshop
with Noosa Council completed.
to identify ongoing
focus areas for TNC
support.
*(A5.2) Provide • Minimum 5 peer
technical/peer review reports
review on minimum completed during
five the three-year
plans/reports/studies term of this
if requested by Agreement, if
Noosa Council. requested by
Noosa Council. If
Noosa Council
requests a peer
review, TNC will
provide a
minimum of 3
experts who are
qualified in the
relevant area of
expertise for
Noosa Council
consideration and
Noosa Council’s
acceptance of 1
expert for the
peer review.
*(A5.3) Facilitate a • Minimum three
minimum of three study tours
study tours of completed during
relevant sites in line the three year
with objectives and term of this
scope of the Agreement, if
program in requested by
Australia/US if Noosa Council.
requested by Noosa
Council (flights and
incidentals covered
separately by Noosa
Council,
accommodation and
87 | Bring Back the Fish MER plan 2020 – 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.