Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 modelling and                 further
 outcomes of                   aggregated 600m2
 community                     surface area of
 consultation.                 restored shellfish
                               ecosystem in the
                               Noosa River
                               estuary.
 (A5.1) Run workshop      •    Workshop
 with Noosa Council            completed.
 to identify ongoing
 focus areas for TNC
 support.
 *(A5.2) Provide          •    Minimum 5 peer
 technical/peer                review reports
 review on minimum             completed during
 five                          the three-year
 plans/reports/studies         term of this
 if requested by               Agreement, if
 Noosa Council.                requested by
                               Noosa Council. If
                               Noosa Council
                               requests a peer
                               review, TNC will
                               provide a
                               minimum of 3
                               experts who are
                               qualified in the
                               relevant area of
                               expertise for
                               Noosa Council
                               consideration and
                               Noosa Council’s
                               acceptance of 1
                               expert for the
                               peer review.
 *(A5.3) Facilitate a     •    Minimum three
 minimum of three              study tours
 study tours of                completed during
 relevant sites in line        the three year
 with objectives and           term of this
 scope of the                  Agreement, if
 program in                    requested by
 Australia/US if               Noosa Council.
 requested by Noosa
 Council (flights and
 incidentals covered
 separately by Noosa
 Council,
 accommodation and




87 | Bring Back the Fish MER plan 2020 – 2022
Log in to download the original file

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.