Original source · versioned page text
Landscape Proposal Plans
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
Turf as specified in GENERAL PLANTING NOTES
General Notes CD-001 1. PLANT QUALITY
Topsoil All plant stock is to be be to the scheduled nomenclature, well formed, hardened off nursery stock.
- to 100mm depth PODIUM SOILS NOTES They are to be container grown in potting mixture with a healthy root system and not pot bound. All
pots shall be free of weeds and plant stock is to be free from living insects, pests and disease. All plants
Cultivate subgrade Podium soils to be 'Podium Plus - Tub & Planter' are to be fully sun or shade hardened-off to suit their on-site growing position for a minimum period of
- to 150mm depth Podium soils to be supplied by Hortis Group - 6 weeks.
contact Aaron Ashlin Tel. 0448 007 350. 2. ADVANCED TREE NOTES.
Existing subgrade
All advanced trees 25L or greater are to be certified as either Natspec or AS2303 compliant.
Soil to be installed with 2 profiles as per Typical Contractor to sight and supply certification to superintendent prior to accepting trees from the nursery.
Detail 04 CD-200 Contractor is to review all tree stock at unloading and prior to planting to ensure the following: Trunk is
A Horizon to be the top 30% of planting media not burried below flare in trunk at top of roots; There is no sign of root girding; Tree is self supporting;
01 TURF TYPE 1 - TYPICAL PROFILE with B Horizon to comprise of the lower 70% of Tree is of good form and health; When bag is removed roots are not circling or pot bound. Trees that
CD-200 1:5@A1, 1:10@A3 the planting media. fail these criteria should not be planted and are to be returned to nursery. Trees are to be planted
Soil media profiles to contain the following: 20-30mm above finish level to allow for settling. Rip side of root ball prior to planting to loosen roots.
90mm∅ capped slotted pipe 3. IMPLEMENTATION
Notes: 75mm below top of planter A Horizon
Ensure all planting procedures result in healthy plant species within the prevailing soil, climatic and
- Place the rootball on a firmed base to achieve required FSL. connected to drainage system · 20% Coir Peat/Coir Chip Blend
management environment of this project. The following minimum is expected:
- Thoroughly water the root ball immediately after planting. per Hydraulic Engineer · 10% Composted 0-10mm Slash Bark
- Number of stakes will vary with pot size. Refer plant schedule. - Excavate a hole for each plant twice the diameter of the rootball and 100mm deeper than the root
River stone to · 20% Clinker Ash PALM COLLAR:
- Cultivate sides of excavated hole 50mm. ball. Break up the base of the hole to a further depth of 100mm and loosen the sides of the hole.
top of pipe Guy ropes tied to palm collar.
Mulch · 25% Medium Washed Sand - Remove the plant from the container, tease out roots and place in final position, ensure it is central
Refer Inset Detail A
- refer to plans for organic or · 25% Screened Sandy Loam and plumb. Ensure the root ball is level with the finished surface of the soil surrounding the hole or bed.
inorganic locations - Ensure correct placement of fertiliser and/or water retention additive as per manufacture's
INSET DETAIL A
A Horizon mix B Horizon TURNBUCKLE: specification and requirements.
PALM GUYING:
(30%) Refer notes. - Backfill with topsoil as specified. Lightly tamp and water thoroughly to eliminate any air pockets.
'Podium Plus - Tub & Planter' mix · 60% Medium Washed Sand Fix Palm Collar as
Ensure that topsoil is not placed over the top of the rootball or where base of trunk flares.
varies
- refer to CD-001 for Specification · 20% Clinker Ash specified to
- Thoroughly water plants immediately after planting and at such times during the contract period as
Hardwood Stake: B Horizon mix · 20% Coir Peat/Coir Chip Blend manufacturers
required. All plant stock will require a minimum of 10ltrs of water at the time of planting.
25x25x90mm Place 600mm (70%) recommendations.
Geotextile fabric FIXING: Collect all empty plant containers daily during planting operations and remove from site. Keep soil level
into the ground. Do not Guy at 2/3 height
The following additives are to be mixed through Refer Notes. and flush so that watering will not not push soil in around trunk of tree. Any watering berms are to be
place through rootball. 30mm Atlantis drainage cell of trunk.
the A Horizon material within 1 week of delivery made of mulch only.
Secure with ties by looping or similar approved to site: Do not vary the plant locations from those specified on the drawings unless otherwise directed by the
in a figure eight pattern. · Nitrophoska Blue @ 1kg/m³ Superintendent. Should it be necessary to vary the locations and spacing for any reason, immediately
Topping slab - If required. apply for directions by the Superintendent.
Mulch: Pull away from · Potassium Sulphate @ 350g/m³
Depth varies to achieve falls 4. PLANT ESTABLISHMENT
base of plant. · Iron Sulphate Hepahydrate @ 1kg/m³
to drain. The Establishment Period commences at the date of Practical Completion of Works.
· Gypsum @ 2kg/m³
Form an earthen basin Waterproofing and protection Notes: During the Establishment Period maintain best horticultural practices including (but not limited to) the
· Dolomite @ 2kg/m³
around base of plant. - to Architect's Specification. 1. Refer to plant schedule for palms to be guyed. following items where required: watering, weeding, fertilising, pest and disease control, mulching,
2. All metal work to be hot dipped galvanised. pruning, rubbish removal and keeping the site neat and tidy. Rectify defects that become apparent in
Podium / basement slab Soil test results are to be supplied for podium 3. Turnbuckles to be HDG, eye to eye type, 8mm dia. with lock nut. the works under normal use
- refer Engineer's detail. media certifying the the media achieves a pH 6.2 to 4. All guy ropes are to be tensioned evenly to ensure palm is maintained 5. PLANT REPLACEMENT
Topsoil blend 7.0 level and that the media exceeds AS4419 and in an upright position. Replace failed or damaged plants. This does not include vandalised or stolen plant material - these will
Fertiliser: Do not allow 04 TYPICAL RAISED PLANTER - TYPICAL PROFILE satisfies AS3743. 5. Wire guy rope to be 5mm dia. and secured with HDG 'D' clamps. Rope be replaced prior to practical completion or at the superintendents direction.
contact with roots. CD-200 1:10@A1, 1:20@A3 to be fixed with Duckbill Anchors.
To be read in conjunction with Architect's Documentation 6. Duckbill Tree Anchors to be appropriate size as recommended by
manufacturer.
Water retention additive
06 PALM GUYING DETAIL
Notes: CD-200 not to any scale Podium structural slab
02 140-300mm PLANTING - Place the rootball on a firm base.
- Thoroughly water the root ball immediately after planting.
Refer to Architect's documentation for raised planter specifications - Refer Structural Engineer's/Architect's drawing
Compacted metal base
CD-200 1:10@A1, 1:20@A3 FSL
- Cultivate sides of excavated hole 50mm deep. - refer Manufacturers Specification.
- Do not disturb kerb, road pavement or road side drainage works. Mulch
Notes: - to 100mm depth Geotextile fabric
- Tease out roots on side of rootball when planting. - As shown and wrap up sides of planter min
- Place the rootball on a firm base. - Ensure top of rootball is not buried; expose and set flush with finished level.
- Thoroughly water the root ball immediately after planting. 500mm and tape in place.
Soil blend or site topsoil
- Cultivate sides of excavated hole 50mm deep. Set soil level at top of Water proofing and protective board as per
- to 300mm depth
- Do not disturb kerb, road pavement or road side drainage works. rootball (at flare of trunk) Architect's documentation
- Tease out roots on side of rootball when planting. Slotted drainage pipe to
- Ensure top of rootball is not buried; expose and set flush with finished level. Pull away mulch top of protective board
from base of plant Cultivated subgrade
Synthetic turf (level) with sand over
- to 150mm depth
as specified in General Notes CD-002
50x50x2400 HW Timber stake: Form mulch berm
Place 600mm into the ground. Do to the perimeter of
Fall Typ. 1:80 Fall Typ. 1:80
not place through rootball. Secure the rootball
with hessian ties by looping in a Install root barrier to 600mm
figure eight pattern. depth where trees are within
1m of hard infrastructure. 07 GARDEN BED - TYPICAL PROFILE
Hardwood stake: Place 600mm CD-200 1:10@A1, 1:20@A3
into the ground. Do not place Raise plant 20-30mm above Distance to local
through rootball. Secure with top of kerb. authority
requirments Notes:
ties by looping in a figure eight - All timber to be CCA pressure treated to AS1604, Hazard 5, rough sawn pine.
pattern. Do not excavate - All timber ends to have one coat of Cuprinol or equal prior to installation.
Raise plant 50mm above within 50mm of Podium drain Drainage layer
- Stakes to be 400mm into ground at max. 1200mm centres, or as required to
edge restraint or - refer Hydraulic Engineer's/Architect's drawings - Modular cell
finished surface level. obtain smooth curves. Top of stake to finish 20mm below top of timber edge.
pavement. 100 Where timber edges meet at corners provide double stakes.
Mulch: Pull away from base Top of Kerb
of plant. FSL - All fixings to be hot dipped galv. 09 TURF TYPE 2 - TYPICAL PROFILE
- Leading edge is to be free of burrs and splinters. CD-200 1:10@A1; 1:20@A3
Form an earthen basin
Install as per Manufacturer's specifications
around base of plant.
50 FSL
300
(X)
2 TIMBER EDGE STAKES
38 50
Topsoil blend 1 1 Timber edge
Topsoil blend 1 Root barrier (X) = Height above
min 300
100
Bio-degradable Geo-fabric finished surface level
Water retention additive Stakes
Water retention FLUSH
Fertiliser: Do not allow 1 additive
1 Existing/compacted FIXINGS
fertiliser to come in 100mm drainage gravel in 100x38mm
/subgrade/subase
contact with roots. heavy or poor draining soils. 75mm Bugle Headed
Connect drainage gravel 50x50mm
width (w) Batten Screws.
10 - 20mm Drainage gravel to back of kerb, subsoil
2xw Incorporate slow release organic drainage where
fertilizer and water retention applicable 08 EDGE TYPE 1
additives to backfill per CD-200 1:5@A1, 1:10@A3
03 45-200ltr PLANTING Manufacturer's recommendations Timber garden edge
CD-200 1:10@A1, 1:20@A3
Revision Date Amendment Drawn Checked
05 STREET TREE PLANTING
CONSTRUCTION DETAILS CD-200 1:10@A1, 1:20@A3
All trees to have 100% NATSPEC inspection prior to delivery to site
C
D
E
2018.10.19
2018.11.09
2019.01.10
Pathway adjustment - For Approval
For Tender
For Tender
JC
JC
JC
CS
CS
CS
CD-200 scale as noted Street Tree scale 1:10 F 2019.01.14 For Tender JC CS
G 2019.07.22 For Tender AL CS
30 & 32 DOONELLA STREET TEWANTIN TENDER ONLY
NOT FOR CONSTRUCTION
H
I
J
2019.07.25
2019.07.26
2019.09.12
For Tender
For Tender
For Tender
AL
AL
ZL
CS
CS
CS
16216 DOONELLA STREET PTY LTD K 2019.11.05 RFI Response ZL CS
L 2021.01.25 For Approval PS CS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Landscape Proposal Plans.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.