Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Landscape Proposal Plans

of 19

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

                                                            Turf as specified in                                                                                                                                                                                                                                                                            GENERAL PLANTING NOTES
                                                            General Notes CD-001                                                                                                                                                                                                                                                                            1. PLANT QUALITY
                                                            Topsoil                                                                                                                                                                                                                                                                                         All plant stock is to be be to the scheduled nomenclature, well formed, hardened off nursery stock.
                                                            - to 100mm depth                                                                                                                    PODIUM SOILS NOTES                                                                                                                                          They are to be container grown in potting mixture with a healthy root system and not pot bound. All
                                                                                                                                                                                                                                                                                                                                                            pots shall be free of weeds and plant stock is to be free from living insects, pests and disease. All plants
                                                            Cultivate subgrade                                                                                                                  Podium soils to be 'Podium Plus - Tub & Planter'                                                                                                            are to be fully sun or shade hardened-off to suit their on-site growing position for a minimum period of
                                                            - to 150mm depth                                                                                                                    Podium soils to be supplied by Hortis Group -                                                                                                               6 weeks.
                                                                                                                                                                                                contact Aaron Ashlin Tel. 0448 007 350.                                                                                                                     2. ADVANCED TREE NOTES.
                                                            Existing subgrade
                                                                                                                                                                                                                                                                                                                                                            All advanced trees 25L or greater are to be certified as either Natspec or AS2303 compliant.
                                                                                                                                                                                                Soil to be installed with 2 profiles as per Typical                                                                                                         Contractor to sight and supply certification to superintendent prior to accepting trees from the nursery.
                                                                                                                                                                                                Detail 04 CD-200                                                                                                                                            Contractor is to review all tree stock at unloading and prior to planting to ensure the following: Trunk is
                                                                                                                                                                                                A Horizon to be the top 30% of planting media                                                                                                               not burried below flare in trunk at top of roots; There is no sign of root girding; Tree is self supporting;
  01 TURF TYPE 1 - TYPICAL PROFILE                                                                                                                                                              with B Horizon to comprise of the lower 70% of                                                                                                              Tree is of good form and health; When bag is removed roots are not circling or pot bound. Trees that
 CD-200 1:5@A1, 1:10@A3                                                                                                                                                                         the planting media.                                                                                                                                         fail these criteria should not be planted and are to be returned to nursery. Trees are to be planted
                                                                                                                                                                                                Soil media profiles to contain the following:                                                                                                               20-30mm above finish level to allow for settling. Rip side of root ball prior to planting to loosen roots.
                                                                                                                                                          90mm∅ capped slotted pipe                                                                                                                                                                         3. IMPLEMENTATION
Notes:                                                                                                                                                    75mm below top of planter             A Horizon
                                                                                                                                                                                                                                                                                                                                                            Ensure all planting procedures result in healthy plant species within the prevailing soil, climatic and
- Place the rootball on a firmed base to achieve required FSL.                                                                                            connected to drainage system          ·     20% Coir Peat/Coir Chip Blend
                                                                                                                                                                                                                                                                                                                                                            management environment of this project. The following minimum is expected:
- Thoroughly water the root ball immediately after planting.                                                                                              per Hydraulic Engineer                ·     10% Composted 0-10mm Slash Bark
- Number of stakes will vary with pot size. Refer plant schedule.                                                                                                                                                                                                                                                                                           - Excavate a hole for each plant twice the diameter of the rootball and 100mm deeper than the root
                                                                                River stone to                                                                                                  ·     20% Clinker Ash                                                                                            PALM COLLAR:
- Cultivate sides of excavated hole 50mm.                                                                                                                                                                                                                                                                                                                   ball. Break up the base of the hole to a further depth of 100mm and loosen the sides of the hole.
                                                                                top of pipe                                                                                                                                                                                                                      Guy ropes tied to palm collar.
                                                                                                                                                          Mulch                                 ·     25% Medium Washed Sand                                                                                                                                - Remove the plant from the container, tease out roots and place in final position, ensure it is central
                                                                                                                                                                                                                                                                                                                 Refer Inset Detail A
                                                                                                                                                          - refer to plans for organic or       ·     25% Screened Sandy Loam                                                                                                                               and plumb. Ensure the root ball is level with the finished surface of the soil surrounding the hole or bed.
                                                                                                                                                          inorganic locations                                                                                                                                                                               - Ensure correct placement of fertiliser and/or water retention additive as per manufacture's
                                                                                                                                                                                                                                                      INSET DETAIL A
                                                                                                             A Horizon mix                                                                      B Horizon                                                                                                        TURNBUCKLE:                                specification and requirements.
                                                                                                                                                                                                                                                      PALM GUYING:
                                                                                                             (30%)                                                                                                                                                                                               Refer notes.                               - Backfill with topsoil as specified. Lightly tamp and water thoroughly to eliminate any air pockets.
                                                                                                                                                          'Podium Plus - Tub & Planter' mix     ·   60% Medium Washed Sand                            Fix Palm Collar as
                                                                                                                                                                                                                                                                                                                                                            Ensure that topsoil is not placed over the top of the rootball or where base of trunk flares.




                                                                                                                              varies
                                                                                                                                                          - refer to CD-001 for Specification   ·   20% Clinker Ash                                   specified to
                                                                                                                                                                                                                                                                                                                                                            - Thoroughly water plants immediately after planting and at such times during the contract period as
Hardwood Stake:                                                                                              B Horizon mix                                                                      ·   20% Coir Peat/Coir Chip Blend                     manufacturers
                                                                                                                                                                                                                                                                                                                                                            required. All plant stock will require a minimum of 10ltrs of water at the time of planting.
25x25x90mm Place 600mm                                                                                        (70%)                                                                                                                                   recommendations.
                                                                                                                                                          Geotextile fabric                                                                                                                                      FIXING:                                    Collect all empty plant containers daily during planting operations and remove from site. Keep soil level
into the ground. Do not                                                                                                                                                                                                                               Guy at 2/3 height
                                                                                                                                                                                                The following additives are to be mixed through                                                                  Refer Notes.                               and flush so that watering will not not push soil in around trunk of tree. Any watering berms are to be
place through rootball.                                                                                                                                   30mm Atlantis drainage cell                                                                 of trunk.
                                                                                                                                                                                                the A Horizon material within 1 week of delivery                                                                                                            made of mulch only.
Secure with ties by looping                                                                                                                               or similar approved                   to site:                                                                                                                                                    Do not vary the plant locations from those specified on the drawings unless otherwise directed by the
in a figure eight pattern.                                                                                                                                                                      ·    Nitrophoska Blue @ 1kg/m³                                                                                                                              Superintendent. Should it be necessary to vary the locations and spacing for any reason, immediately
                                                                                                                                                          Topping slab - If required.                                                                                                                                                                       apply for directions by the Superintendent.
Mulch: Pull away from                                                                                                                                                                           ·    Potassium Sulphate @ 350g/m³
                                                                                                                                                          Depth varies to achieve falls                                                                                                                                                                     4. PLANT ESTABLISHMENT
base of plant.                                                                                                                                                                                  ·     Iron Sulphate Hepahydrate @ 1kg/m³
                                                                                                                                                          to drain.                                                                                                                                                                                         The Establishment Period commences at the date of Practical Completion of Works.
                                                                                                                                                                                                ·     Gypsum @ 2kg/m³
Form an earthen basin                                                                                                                                     Waterproofing and protection                                                                Notes:                                                                                                During the Establishment Period maintain best horticultural practices including (but not limited to) the
                                                                                                                                                                                                ·    Dolomite @ 2kg/m³
around base of plant.                                                                                                                                     - to Architect's Specification.                                                             1. Refer to plant schedule for palms to be guyed.                                                     following items where required: watering, weeding, fertilising, pest and disease control, mulching,
                                                                                                                                                                                                                                                      2. All metal work to be hot dipped galvanised.                                                        pruning, rubbish removal and keeping the site neat and tidy. Rectify defects that become apparent in
                                                                                                                                                          Podium / basement slab                Soil test results are to be supplied for podium       3. Turnbuckles to be HDG, eye to eye type, 8mm dia. with lock nut.                                    the works under normal use
                                                                                                                                                          - refer Engineer's detail.            media certifying the the media achieves a pH 6.2 to   4. All guy ropes are to be tensioned evenly to ensure palm is maintained                              5. PLANT REPLACEMENT
Topsoil blend                                                                                                                                                                                   7.0 level and that the media exceeds AS4419 and       in an upright position.                                                                               Replace failed or damaged plants. This does not include vandalised or stolen plant material - these will
Fertiliser: Do not allow                                                                   04 TYPICAL RAISED PLANTER - TYPICAL PROFILE                                                          satisfies AS3743.                                     5. Wire guy rope to be 5mm dia. and secured with HDG 'D' clamps. Rope                                 be replaced prior to practical completion or at the superintendents direction.
contact with roots.                                                                    CD-200 1:10@A1, 1:20@A3                                                                                                                                        to be fixed with Duckbill Anchors.
                                                                                              To be read in conjunction with Architect's Documentation                                                                                                6. Duckbill Tree Anchors to be appropriate size as recommended by
                                                                                                                                                                                                                                                      manufacturer.
Water retention additive
                                                                                                                                                                                                                                                        06 PALM GUYING DETAIL
                                                                                                                   Notes:                                                                                                                              CD-200 not to any scale                                                                                                                       Podium structural slab
  02 140-300mm PLANTING                                                                                            - Place the rootball on a firm base.
                                                                                                                   - Thoroughly water the root ball immediately after planting.
                                                                                                                                                                                                                                                              Refer to Architect's documentation for raised planter specifications                                                                    - Refer Structural Engineer's/Architect's drawing
                                                                                                                                                                                                                                                                                                                                                                                                      Compacted metal base
 CD-200 1:10@A1, 1:20@A3                                                                                                                                                                                                                               FSL
                                                                                                                   - Cultivate sides of excavated hole 50mm deep.                                                                                                                                                                                                                                     - refer Manufacturers Specification.
                                                                                                                   - Do not disturb kerb, road pavement or road side drainage works.                                                                                                                                       Mulch
Notes:                                                                                                                                                                                                                                                                                                                     - to 100mm depth                                                          Geotextile fabric
                                                                                                                   - Tease out roots on side of rootball when planting.                                                                                                                                                                                                                              - As shown and wrap up sides of planter min
- Place the rootball on a firm base.                                                                               - Ensure top of rootball is not buried; expose and set flush with finished level.
- Thoroughly water the root ball immediately after planting.                                                                                                                                                                                                                                                                                                                                         500mm and tape in place.
                                                                                                                                                                                                                                                                                                                           Soil blend or site topsoil
- Cultivate sides of excavated hole 50mm deep.                                                                                                                                                                Set soil level at top of                                                                                                                                                                Water proofing and protective board as per
                                                                                                                                                                                                                                                                                                                           - to 300mm depth
- Do not disturb kerb, road pavement or road side drainage works.                                                                                                                                             rootball (at flare of trunk)                                                                                                                                                            Architect's documentation
- Tease out roots on side of rootball when planting.                                                                                                                                                                                                                                                                                                                                                  Slotted drainage pipe to
- Ensure top of rootball is not buried; expose and set flush with finished level.                                                                                                                             Pull away mulch                                                                                                                                                                         top of protective board
                                                                                                                                                                                                              from base of plant                                                                                           Cultivated subgrade
                                                                                                                                                                                                                                                                                                                                                                                                      Synthetic turf (level) with sand over
                                                                                                                                                                                                                                                                                                                           - to 150mm depth
                                                                                                                                                                                                                                                                                                                                                                                                      as specified in General Notes CD-002
                                                                                                                   50x50x2400 HW Timber stake:                                                                Form mulch berm
                                                                                                                   Place 600mm into the ground. Do                                                            to the perimeter of
                                                                                                                                                                                                                                                                                                                                                                                              Fall Typ. 1:80                               Fall Typ. 1:80
                                                                                                                   not place through rootball. Secure                                                         the rootball
                                                                                                                   with hessian ties by looping in a                                                          Install root barrier to 600mm
                                                                                                                   figure eight pattern.                                                                      depth where trees are within
                                                                                                                                                                                                              1m of hard infrastructure.                 07 GARDEN BED - TYPICAL PROFILE
Hardwood stake: Place 600mm                                                                                                                                                                                                                            CD-200 1:10@A1, 1:20@A3
into the ground. Do not place                                                                                      Raise plant 20-30mm above                                                                  Distance to local
through rootball. Secure with                                                                                      top of kerb.                                                                               authority
                                                                                                                                                                                                              requirments                             Notes:
ties by looping in a figure eight                                                                                                                                                                                                                     - All timber to be CCA pressure treated to AS1604, Hazard 5, rough sawn pine.
pattern.                                                                                                           Do not excavate                                                                                                                    - All timber ends to have one coat of Cuprinol or equal prior to installation.
Raise plant 50mm above                                                                                             within 50mm of                                                                                                                                                                                                                                           Podium drain                                                    Drainage layer
                                                                                                                                                                                                                                                      - Stakes to be 400mm into ground at max. 1200mm centres, or as required to
                                                                                                                   edge restraint or                                                                                                                                                                                                                                        - refer Hydraulic Engineer's/Architect's drawings               - Modular cell
finished surface level.                                                                                                                                                                                                                               obtain smooth curves. Top of stake to finish 20mm below top of timber edge.
                                                                                                                   pavement.                                                                                     100                                  Where timber edges meet at corners provide double stakes.
Mulch: Pull away from base                                                                                                                                                                                                 Top of Kerb
of plant.                                                                                                                        FSL                                                                                                                  - All fixings to be hot dipped galv.                                                                       09 TURF TYPE 2 - TYPICAL PROFILE
                                                                                                                                                                                                                                                      - Leading edge is to be free of burrs and splinters.                                                      CD-200 1:10@A1; 1:20@A3
Form an earthen basin
                                                                                                                                                                                                                                                                                                                                                                       Install as per Manufacturer's specifications
around base of plant.
                                                                                                                                       50                                                                                                                    FSL
                                                                                                                                                    300




                                                                                                                                                                                                                                                                               (X)
                                                                                                                                                                                                                    2                                                                                     TIMBER EDGE           STAKES
                                                                                                                                                                                                                                                                                                               38                 50
                                                                                                                   Topsoil blend            1                                                                   1                                                                    Timber edge
Topsoil blend                                                                                                                                   1                                                                       Root barrier                                                                                                              (X) = Height above
                                                                                     min 300




                                                                                                                                                                                                                                                                                                           100
                                                                                                                   Bio-degradable Geo-fabric                                                                                                                                                                                                      finished surface level
Water retention additive                                                                                                                                                                                                                                                             Stakes
                                                                                                                   Water retention                                                                                                                                                                                                                      FLUSH
Fertiliser: Do not allow                                                         1                                 additive
                                                                            1                                                                                                                                                                                                        Existing/compacted                                           FIXINGS
fertiliser to come in                                                                                              100mm drainage gravel in                                                                                                                                                             100x38mm
                                                                                                                                                                                                                                                                                     /subgrade/subase
contact with roots.                                                                                                heavy or poor draining soils.                                                                                                                                                                                                      75mm Bugle Headed
                                                                                                                                                                                                                    Connect drainage gravel                                                                                       50x50mm
                                                width (w)                                                                                                                                                                                                                                                                                             Batten Screws.
10 - 20mm Drainage gravel                                                                                                                                                                                           to back of kerb, subsoil
                                                  2xw                                                              Incorporate slow release organic                                                                 drainage where
                                                                                                                   fertilizer and water retention                                                                   applicable                                                                 08 EDGE TYPE 1
                                                                                                                   additives to backfill per                                                                                                                                                  CD-200 1:5@A1, 1:10@A3
  03 45-200ltr PLANTING                                                                                            Manufacturer's recommendations                                                                                                                                                    Timber garden edge

 CD-200 1:10@A1, 1:20@A3
                                                                                                                                                                                                                                                                                              Revision        Date                    Amendment                        Drawn         Checked
                                                                                                                     05 STREET TREE PLANTING
CONSTRUCTION DETAILS                                                                                                CD-200 1:10@A1, 1:20@A3
                                                                                                                           All trees to have 100% NATSPEC inspection prior to delivery to site
                                                                                                                                                                                                                                                                                                  C
                                                                                                                                                                                                                                                                                                  D
                                                                                                                                                                                                                                                                                                  E
                                                                                                                                                                                                                                                                                                           2018.10.19
                                                                                                                                                                                                                                                                                                           2018.11.09
                                                                                                                                                                                                                                                                                                           2019.01.10
                                                                                                                                                                                                                                                                                                                            Pathway adjustment - For Approval
                                                                                                                                                                                                                                                                                                                                       For Tender
                                                                                                                                                                                                                                                                                                                                       For Tender
                                                                                                                                                                                                                                                                                                                                                                         JC
                                                                                                                                                                                                                                                                                                                                                                         JC
                                                                                                                                                                                                                                                                                                                                                                         JC
                                                                                                                                                                                                                                                                                                                                                                                       CS
                                                                                                                                                                                                                                                                                                                                                                                       CS
                                                                                                                                                                                                                                                                                                                                                                                       CS
CD-200                                                                          scale as noted                       Street Tree scale 1:10                                                                                                                                                       F        2019.01.14                  For Tender                        JC            CS
                                                                                                                                                                                                                                                                                                  G        2019.07.22                  For Tender                        AL            CS


30 & 32 DOONELLA STREET TEWANTIN                                                                                                                                                                                                       TENDER ONLY
                                                                                                                                                                                                                                  NOT FOR CONSTRUCTION
                                                                                                                                                                                                                                                                                                  H
                                                                                                                                                                                                                                                                                                   I
                                                                                                                                                                                                                                                                                                   J
                                                                                                                                                                                                                                                                                                           2019.07.25
                                                                                                                                                                                                                                                                                                           2019.07.26
                                                                                                                                                                                                                                                                                                           2019.09.12
                                                                                                                                                                                                                                                                                                                                       For Tender
                                                                                                                                                                                                                                                                                                                                       For Tender
                                                                                                                                                                                                                                                                                                                                       For Tender
                                                                                                                                                                                                                                                                                                                                                                         AL
                                                                                                                                                                                                                                                                                                                                                                         AL
                                                                                                                                                                                                                                                                                                                                                                         ZL
                                                                                                                                                                                                                                                                                                                                                                                       CS
                                                                                                                                                                                                                                                                                                                                                                                       CS
                                                                                                                                                                                                                                                                                                                                                                                       CS
16216                        DOONELLA STREET PTY LTD                                                                                                                                                                                                                                              K        2019.11.05                 RFI Response                       ZL            CS
                                                                                                                                                                                                                                                                                                  L        2021.01.25                 For Approval                       PS            CS

Log in to download the original (Landscape Proposal Plans.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.