2019-12-11 SM Agenda - Item 1 - Attachment 1 DRAFT 20191202-Noosa Plan Consultation Report
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn2.3 Tailored Process
The tailored process for Council to follow in preparation of the planning scheme was provided by the
Chief Executive DSDMIP in March 2018. Of particular relevance to this report are steps 9 through
14 which commence following the first State Interest Review. These steps can be summarised as
follows:
Step 9 Council commences public Public notification was given Friday 15 February and the draft
consultation on the Plan was available online from that day. Submissions could
proposed planning scheme be lodged by 5:00pm 20 May, although late submissions
through public notice. were also accepted.
(Initial Consultation) This met the required 40 business day consultation period.
Step 10 The Council considers Through a series of workshops Council reviewed the content
properly made submissions of submissions and considered the matters raised. Given the
content of submissions it was apparent some changes would
be appropriate.
Step 11 Council makes changes to At its meeting of 12 September Council endorsed proposed
the proposed planning changes to the draft New Noosa Plan considered significant.
scheme, including changes In considering the proposed changes and what effect they
resulting from submissions, have on land use outcomes and assessment requirements
amending drafting errors or on certain types of development, it was considered that
addressing new or changed readvertising was necessary for various changes such as:
planning circumstances or
- the removal of maps from the draft plan, or addition of
information.
new maps
- a change in zone
- an increase in level of assessment or whether a use is
made consistent or inconsistent
- a policy change or a change where a significant area of
the Shire is covered.
Step 12 Council restarts or repeats The consultation period met the required least 40 business
consultation due to days but allowed, was limited to only those aspects of the
significant scheme proposed planning scheme that have significantly changed.
changes.
(Further Consultation) Public notification was given Friday 13 September.
Submissions on the significant changes closed 5:00pm
Monday 11 November although submissions lodged a few
days late were also accepted.
Step 13 Council considers all Council must consider submissions and prepare a
submissions received consultation report about how it has dealt with properly made
during consultation, submissions. This report is to be:
including both the original
- provided to each person who made a properly made
and repeated consultation
submission;
periods, and prepares a
- available to view and download on Council’s website; or
consultation report.
- available to inspect and purchase in Council’s offices.
Step 14 Council makes further Council must ensure any changes made to the proposed
changes to the proposed scheme continue to appropriately integrate and address
planning scheme, including relevant state interests, including those identified in the State
changes resulting from Interest Review.
submissions.
Consultation Report - Consideration of Submissions on the New Noosa Plan Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.