GENERAL
TO BE READ IN CONJUNCTION WITH 'SEDIMENT CONTROL DEVICES', REFER STD DRG IPWEA DS-040 &
DS-041
2. TEMPORARY DRAINAGE CONTROL FLOW SHOULD BE DIVERTED AROUND THE WORK SITE WHERE
POSSIBLE.
3. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL BEFORE
COMMENCING UP-SLOPE EARTHWORKS.
4. CONTROL MEASURES TO BE INSPECTED AT LEAST WEEKLY AND AFTER SIGNIFICANT RUNOFF
PRODUCING STORMS.
5. _ INAREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE EITHER ome
MULCHED, COVERED WITH EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTIP OF K&C. =
TO BE DELAYED FOR MORE THAN I4 DAYS. UP-SLOPE RUNOFF
6. CONTROL MEASURES MAY BE REMOVED WHEN ON-SITE EROSION IS CONTROLLED AND 70% oS SROPRINTE
PERMANENT SOIL COVERAGE IS OBTAINED OVER ALL UPSTREAM DISTURBED LAND. SEDIMENT TRAP
7. STRAW BALE SEDIMENT TRAPS ARE TO BE SECONDARY OPTION WHICH GENERALLY SHOULD NOT BE GEOTEXTILE FILTER CLOTH (MANDATORY
USED IF OTHER OPTIONS ARE AVAILABLE. WHEN WORKING ON CLAYEY SOILS)
ALL CAPTURED RUNOFF MUST BE TREATED TO <75NTU PRIOR TO DISCHARGE.
SITE TO BE PROGRESSIVELY STABILISED, AIMING FOR 60% STABILISATION WITHIN 20 DAYS FROM START
OF WORKS AND 70% OR GREATER WITHIN 2 MONTHS
10. ALL INLET PITS TO BE PROTECTED IMMEDIATELY
11. EROSION AND SEDIMENT CONTROL MEASURES TO BE PROGRESSIVELY REMOVED AS SITE
STABILISATION IS ACHIEVED.
SEDIMENT CONTROL
1. ALL SEDIMENT & EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL
EROSION CONTROL ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS. THE BASIC
PRINCIPLES ARE TO:
- MINIMISE THE AREA OF DISTURBANCE;
- CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE;
- MINIMISE EROSION;
- MINIMISE SEDIMENTATION;
PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE
2. SEDIMENT & EROSION CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED
40-75mm CRUSHED ROCK 1
150-P0omm
8.
9.
FILTER SOCKTO
OVERLAP OVER KERB
meoeene SA we To
TRAFFIC"
(a) ROCK ENTRY/EXIT PAD FOR BUILDING SITES
BACK OF K&C
NECESSARY THROUGHOUT CONSTRUCTION
3. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A FUNCTIONAL
ORDER AND REPLACE ALL BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF ro
MAINTENANCE OF WORKS. i}
4, CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE M
SUPERINTENDENT. SHALL BE COMPLETED AND EFFECTIVE PRIOR TO
a STRIPPING OF TOPSOIL AND GRASS.
b. BULK EARTHWORKS TO THE SITE
c. SERVICES INSTALLATION CONSTRUCTION NOTES
d. _ PAVEMENT CONSTRUCTION. FILTERS ROLLS ARE TO BE:
5. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS RECEIVED IN 1. ASINGLE LAYER ROLL OF GEOFABRIC.
“— SPILLWAY
GULLY PIT INLET PROTECTION
SCALE 1:50
WRITING FROM THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL APPLICATIONS.
6. BOTH TEMPORARY AND PERMANENT SEDIMENT MANAGEMENT/EROSION CONTROL DEVICES SHALL BE 2. SEALED ar sore epee (14-20mm) AND
MAINTAINED AT A SUITABLE LEVEL/CONDITION THROUGHOUT CONSTRUCTION TO THE SATISFACTION 3. WRAPPED IN WIRE MESH TO PROVIDE STRENGTH
OF THE SUPERINTENDENT. SEDIMENT FENCES ARE TO BE CLEANED OUT WHEN CAPACITY IS REDUCED AGAINST BURSTING
BY 30%. 4. MINIMUM OF 200mm dia.
7. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN CONJUNCTION
WITH THE APPROVED DRAWINGS.
8. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL |S TO BE OBTAINED FROM THE
SUPERINTENDENT FOR THE LOCATION OF THE SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE
TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.
9. IF EROSION AND SEDIMENT CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILED IN
SERVICE, CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE
AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH
AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND RELEVANT.
SEDIMENT TRAP TO BE FLOCCULATED AND DE-SILTED AS NECESSARY.
WATER QUALITY TESTING / MONITORING TO BE UNDERTAKEN BY CONTRACTOR.
SEDIMENT FENCE
NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.
2 NORMALLY LOCATED ALONG THE CONTOUR WITH A MAXIMUM CATCHMENT AREA 0.6Ha PER 100m
LENGTH OF FENCE
3. WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS MAY BE USED ON SMALL WORK SITES, I.E.
OPERATIONAL PERIOD LESS THAN 6 MONTHS OR ON SITES WHERE SIGNIFICANT SEDIMENT RUNOFF IS.
NOT EXPECTED.
4. WHERE FENCES NEED TO BE LOCATED ACROSS THE CONTOUR THE LAYOUT SHALL CONFORM TO
‘TYPICAL LAYOUT’ ACROSS GRADE.
5. FENCES ARE REQUIRED 2m MIN. FROM TOE OF CUT OR FILL BATTERS, WHERE NOT PRACTICAL ONE
FENCE CAN BE AT THE TOE WITH A SECOND FENCE 1m MIN AWAY. FENCE SHOULD NOT BE LOCATED
PARALLEL WITH TOE IF CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE.
TEMPORARY CONSTRUCTION ENTRY / EXIT
1 ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY FROM ENTRY/EXIT.
2. WHEEL-WASH OR SPRAY UNIT MAY BE REQUIRED DURING WET WEATHER.
STANDARD SPECIFICATIONS
DRAWING TO BE READ IN CONJUNCTION WITH INTERNATIONAL EROSION CONTROL ASSOCIATION (IECA)
AUSTRALASIA BEST PRACTICES STANDARD DRAWINGS & SPECIFICATIONS. IECA STANDARD DRAWINGS.
GENERALLY AS LISTED BELOW BUT NOT LIMITED TO:
EXIT-01 - CONSTRUCTION EXIT - ROCK PAD
EXIT-02 - CONSTRUCTION EXIT - ROCK PAD
EXIT-03 - ROCK PADS FOR BUILDING SITES
CD-01 - CATCH DRAINS
CD-02 - CATCH DRAINS - EARTH LINED
RCD-01 - CHECK DAMS:
FF-01 - FILTER FENCE
SF-01 - SEDIMENT FENCE
SF-02 - SEDIMENT FENCE
ESC-02 - GRATED STORMWATER (FIELD) INLET SEDIMENT TRAP.
ESC-03 - KERB INLET SEDIMENT TRAPS
R-01 - RENEGOTIATION - GENERAL
MAINTENANCE NOTES
FILTER ROLLS REQUIRE
1, REGULAR INSPECTION TO ENSURE QUALITY.
2. REMOVAL OF SILT DEPOSITS WHEN NECESSARY.
UNTIL OFF MAINTENANCE.
THE EROSION & SEDIMENT CONTROL PLAN IS A CONCEPT PLAN DEMONSTRATING
AN APPROACH TO EROSION & SEDIMENTATION CONTROL FOR THE SITE. IT IS THE
CONTRACTORS RESPONSIBILITY TO PROVIDE AN EROSION & SEDIMENT CONTROL
DESIGN AND A COMPLETED DESIGN CERTIFICATE PRIOR TO COMMENCEMENT OF
WORK. CERTIFICATION MUST BE UNDERTAKEN BY A SUITABLY QUALIFIED,
EXPERIENCED PROFESSIONAL NOT DIRECTLY EMPLOYED BY THE PRINCIPAL.
LIP OF K&C
im (MIN) rm (MIN)
FLOW CONTROL BERM INCORPORATED INTO THE oN
ROCK PAD IF THE PAD RECEIVES RUNOFF FROM | | |
THE BUILDING SITE (LOCATION MAY VARY) — BUILDING
SITE
BUILDING. LAND LAND,
SE = SLOPE z SLOPE
= =} fH
= | = [
& &| . SEDIMENT FENCE
. | \ ely \ Z
) MAKE SAFE FOR FOOTPATH | MAKE SAFE FOR
: FOOTPATH PEDESTRIAN TRAFFIC : PEDESTRIAN TRAFFIC
|
ROADWAY ROADWAY
(b) ROCK PAD SLOPING AWAY FROM ROAD
(c) ROCK PAD SLOPING TOWARD THE ROAD
ROCK PADS FOR BUILDING SITES
NTS
CONSTRUCTION NOTES
MATERIALS
ROCK: WELL GRADED, HARD, ANGULAR, EROSION RESISTANT ROCK, NOMINAL DIAMETER OF 40 TO 75mm.
FOOTPATH STABILISING AGGREGATE: 25 TO 50mm GRAVEL OR AGGREGATE (iF REQUIRED).
GEOTEXTILE FABRIC: HEAVY-DUTY, NEEDLE-PUNCHED, NON-WOVEN FILTER CLOTH (‘BIDIM’ A24 OR EQUIVALENT).
INSTALLATION
1 INSPECT ALL SITE ENTRY AND EXIT POINTS PRIOR TO FORECAST RAIN, DAILY DURING EXTENDED PERIODS
OF RAINFALL, AFTER RUNOFF-PRODUCING RAINFALL, OR OTHERWISE AT FORTNIGHTLY INTERVALS.
2. IF SAND, SOIL, SEDIMENT OR MUD IS TRACKED OR WASHED ONTO THE ADJACENT SEALED ROADWAY,
THEN SUCH MUST BE PHYSICALLY REMOVED, FIRST USING A SQUARE-EDGED SHOVEL, AND THEN A
NOTE:
INLET OF GULLY PIT NOT
TO BE OBSTRUCTED.
STIFF-BRISTLED BROOM, AND THEN BY A MECHANICAL VACUUM UNIT, IF AVAILABLE.
3 IF NECESSARY FOR SAFETY REASONS, THE ROADWAY SHALL ONLY BE WASHED CLEAN AFTER ALL
REASONABLE EFFORTS HAVE BEEN TAKEN TO SHOVEL AND SWEEP THE MATERIAL FROM THE ROADWAY.
FABRIC BURIED 200mm —
4. WHEN THE VOIDS BETWEEN THE ROCK BECOMES FILLED WITH MATERIAL AND THE ~=EFFECTIVENESS OF
THE ROCK PAD IS REDUCED TO A POINT WHERE SEDIMENT IS BEING TRACKED OFF THE SITE, ANEW 100mm
LAYER OF ROCK MUST BE ADDED AND/OR THE ROCK PAD MUST BE EXTENDED.
5. _ ENSURE ANY ASSOCIATED DRAINAGE CONTROL MEASURES (e.g. FLOW CONTROL BERM) ARE MAINTAINED
IN ACCORDANCE WITH THEIR DESIRED OPERATIONAL CONDITION
6 DISPOSE OF SEDIMENT AND DEBRIS IN A MANNER THAT WILL NOT CREATE AN EROSION OR POLLUTION
HAZARD
'RETURNS' PLACED AT 20m SPACING (MAX.) IF
FENCE IS LOCATED ALONG THE CONTOUR,
OTHERWISE 5 TO 10m DEPENDING ON SLOPE _,
‘3m (MAX.) WITH WIRE BACKING
OTHERWISE 2m (MAX.)
1.5m (MIN)
DIRECTION OF FLOW sa
— ALL SUPPORT POSTS PLACED
DOWN-SLOPE OF FABRIC
‘— SEDIMENT FENCE FABRIC, NOT
FILTER CLOTH OR SHADE CLOTH
INSTALLATION OF SEDIMENT FENCE
NTS
SEDIMENT FENCE CONSTRUCTION NOTES
1. SEDIMENT FENCE TO BE INSTALLED ALONG A LINE OF CONSTANT GROUND
ELEVATION WHEREVER PRACTICAL.
2. BOTH ENDS OF THE SEDIMENT FENCE TO EXTEND UP THE SLOPE AT LEAST 1m.
3. SUPPORT POST TO BE SPACED MAXIMUM 2m UNLESS THE FENCE IS SUPPORTED
BY ATOP WIRE OR WORE MESH BACKING, IN WHICH CASE 3m MAXIMUM SPACING.
4, FENCE 'RETURN' SHALL BE INSTALLED AT MAXIMUM 20m SPACING IF FENCE IS
INSTALLED ALONG THE CONTOURS, OTHERWISE 5 TO 10m MAXIMUM SPACING.
5. MINIMUM 4 STAPLES OR TIE WIRES PER STAKE.
APPROVED DRAWN XC CLIENT PROJECT DRAWING
STATUS FOR APPROVAL
CHARLES COOK KERRY BONE RESIDENTIAL WORKS EROSION & SEDIMENT
RPEQ NO: 8480 DESIGN XC
APPROVED DATE [cuecK co CONTROL DETAILS PROJECT NO. DRAWING NO. REV NO.
07.04.25 CONSULTING ENGINEERS 5 PARK CRESENT
SUNSHINE BEACH, QLD C4
A_|ISSUED FOR APPROVAL 25.03.25 | cc [SIGNED Charles COOK | conaccmanmse CML |PROIECT MANAGEMENT| TECHNICA. SERVICES 250119 OPW-C-00225 A
REV DESCRIPTION SATE —TABRE 07.04.2025 Semin com. [ABN T2677 14 S32 Heer sie at
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Civil Plans 250407_250119-OPW-C-A-Signed.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.