Reference Document - MCU25 0092 & OPW25 0143 (As Published)
NOOSA COUNCIL
REFERENCE DOCUMENT
MCU25/0092 & OPW25/0143
20 APRIL 2026
Dayne Lawrie Constructions Project Number: SCG 0599
2/2 Project Ave Project Name:: 5 Martin St Peregian Beach
Noosaville, QLD SCG Consulting Engineers
Email: [email protected]
Landslide Risk Assessment
5 Marin St, Peregian Beach
At the request of Lawrie Constructions the attached report is to provide a landslide risk assessment for the
above-mentioned site in accordance with Noosa Shire Council guidelines.
The site is located at 5 Martin Street, Peregian Beach and is identified as Lot 267 on RP93113. The site has an
area of 744 m2 and is bordered by Martin Street to the north, Avocet Parade the east, residential dwelling to
the south and vacant vegetated land to the west. Figure 1 shows an aerial view of the site and its surroundings,
with the approximate site boundary shown in red.
Figure 1: Site Locality Plan (Site boundaries depicted in red)
Review of provided survey data completed by Max Watterson + Associates contour plans provided indicates
that the that the site currently slopes from the South-western corner towards the north east from
approximately RL 11.25 m to RL 8.18m AHD. Figure 2 below depicts an extract of the site contours.
SCG Consulting Engineers Page 1 of 5 SCG 0599 24 September 2025
Document Set ID: 24189920
Version: 1, Version Date: 30/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 9 pages
Page 2
Figure 2: Survey Plan (client provided)
SCG Consulting Engineers Page 2 of 5 SCG 0599 24 September 2025
Document Set ID: 24189920
Version: 1, Version Date: 30/09/2025
Page 3
Based on the provided plans, it is understood that the existing residence will be demolished, and a new 2-
storey residence with a partial inground garage basement and a semi-inground pool will be constructed.
A previous geotechnical report has been provided for the eastern neighbouring property located at 66 Peregian
Esplanade by Pacific Geotech. The geotechnical investigation comprised the drilling and sampling of five (5)
boreholes extending to depths ranging between 0.5 m and 7.4 m (drill rig refusal). The investigation
summarised the site as comprising very loose grading to very dense sand grading with depth. Ground water
was noted ranging between 2.6 m and 3.3 m below ground level. It is typical for groundwater to fluctuate
regularly throughout the area.
The provided report, in conjunction with local experience, is consistent with available mapping as shown in
Figure 3 below.
Figure 3: Local site geology (Queensland Geoscientific database)
Noosa Shire Council mapping indicates that the proposed site is mapped ‘moderate hazards area’, as shown
in Figure 4.
SCG Consulting Engineers Page 3 of 5 SCG 0599 24 September 2025
Document Set ID: 24189920
Version: 1, Version Date: 30/09/2025
Page 4
Figure 4: Landslide hazard overly map showing lot boundary in red (from Noosa Shire Council)
Based on a desktop review of the provided data and understanding of the area, there are two potential failure
mechanisms can be considered, these include:
» Hazard 1 – Small rotational failure through the natural loose sands – volume of failure less than 20m3
(failure will required an unusual sever triggering event)
» Hazard 2 – Large rotational failure through the natural loose sands – volume of failure less than 2000m3
(failure will required an extreme triggering event)
A qualitative landslip risk assessment was completed for these potential failure mechanisms in general
accordance with Australian Geomechanics (2007) Guideline for Landslip Susceptibility, Hazard and Risk
Zoning for Land Use Planning). The slope risk assessment is summarised in Table 1.
Table 1: Summary of the qualitative slope risk assessment
Hazard 1 – small rotational failure Hazard 2 - Large rotational failure
Hazards though the natural loose sands up to though the natural loose sands up to
20m3 2,000 m3
Property People, who Property People, who
either live, or may either live, or may
that spend some that spend some
Risk Element
time in the area time in the area
affected by the affected by the
landslip landslip
Likelihood POSSIBLE POSSIBLE BARLEY CREDIBLE BARLEY CREDIBLE
Frequency C C F F
estimate,
expressed as an
annualised
probability and
taking into account
the probability of
spatial impact
SCG Consulting Engineers Page 4 of 5 SCG 0599 24 September 2025
Document Set ID: 24189920
Version: 1, Version Date: 30/09/2025
Page 5
Measure of INSIGNIFICANT INSIGNIFICANT MAJOR CATASTROPHIC
consequence 5 5 2 1
RISK LEVEL VERY LOW VERY LOW VERY LOW LOW
VL VL VL L
The small and large rotational failures through the loose sands of very low and low risk, respectively and are
unlikely to impact the property and people who live or spend time in the area, provided the following
recommendation are adhered too:
» All temporary and permanent retaining walls and excavations shall be design in accordance with AS4678,
and stability analysis be carried out by a geotechnical engineering ensuring minimum Factors of Safety
(FOS) for temporary and permanent conditions of 1.3 and 1.5, respectively are achieved.
» All foundations of the house to be extended to the medium dense sand, as a minimum.
» The development shall adhere to good hill side practice. Examples of good and poor hill side practice for
the construction of residential dwelling on slopes is presented in Appendix D, Practice Note Guidelines for
landslide risk management 2007, from Australian Geomechanics Journal Vo 42, No. 1 dated March 2007.
Excavations up to 3.0 m depth could generally be designed with a safe 1.5H:1V temporary batter slope or
2H:1V for permanent batter slopes. This assumes that soils are not wet/saturated and groundwater is not
present, and is subject to the below recommendations:
» All temporary batters should not have construction loads (i.e. plant, equipment or soil stockpiles) or
people at the crest of the batters at a distance equal to the height of the slope,
» Batters should be assessed to not effect neighbouring properties/dwellings,
» Permanent batters (at a minimum) should be protected from erosion. Topsoiling and planting, or erosion
matting should be applied to the batter as soon as possible,
» Suitable drainage and stormwater provisions must be installed for the batters. Surface and stormwater
runover must be directed away from batters and prevented from pooling at the base and crest. At a
minimum, spoon drained should be installed at the crest and base of permanent batters,
» Temporary batters should not remain open for extended periods of time.
» Any batters or excavations exceeding this should be inspected by a suitably qualified geotechnical
engineer to assess to the stability of the batter, and
» Batters exceeding the heights or slopes stated above, or batters that contain buildings or surcharge loads
within a distance equal to one batter height from the crest, should undergo detailed stability analysis to
determine risk levels.
If temporary batters steeper than 1.5H:1V are proposed for the site these will require the design of a suitable
retention system.
We trust this information is satisfactory for your current needs. Should you have any questions, please feel
free to contact the undersigned.
Regards,
PTG Consulting Reviewed By
Luke Goodluck Justin Taing
Branch Lead – Sunshine Coast Geotechnical Regional Director – Geotechnical (RPEQ 30087)
p | 07 5647 0457 p | 07 5647 0411
e | [email protected] e | [email protected]
SCG Consulting Engineers Page 5 of 5 SCG 0599 24 September 2025
Document Set ID: 24189920
Version: 1, Version Date: 30/09/2025
Page 6
Landscape Design Outcomes Specifications for Landscape Works
General Conditions
The proposed design aims to achieve sustainable and aesthetic results through practical solutions. This will be accomplished by applying the landscaping plans
and notes. The design calls for selecting trees, shrubs, and ground-cover plantings around the proposed building and surrounding areas to complement the All landscape construction work must comply with relevant council approvals and adhere to industry best practices.
architecture and help create a sustainable, safe, and functional environment within the development. Any deviations from the design documentation require approval from the project designer before on-site construction.
Erosion and sediment control measures are to be implemented as necessary to prevent detrimental effects on downstream waterways or
The planting design will incorporate the following: neighboring sites.
Site Preparation/Earthworks
Plantings will primarily consist of native endemic species to complement the existing environment and local council landscape design policy.
Prior to commencing work, the contractor must document the existing site conditions.
Surveillance and sightline criteria will be met to ensure safe and easy travel for residents throughout the development site.
All existing and proposed services on the site are to be located and clearly identified.
All building rubbish and harmful materials must be removed from the site and taken to an approved waste location.
Shade trees will be planted in carparking areas, driveways, walkways, and general hardstand areas to provide solar relief where practical and possible.
Landscape areas are to be scarified to a depth of 150mm to promote good growth for turf and planting.
Planting species will be selected for their aesthetic value, sustainability during water-conscious periods, and low maintenance qualities. Materials/Services
All plants selected are from native species listed in Table SC6.3.4.1 "Coastal Beachfront Area Species" of the Noosa Plan 2020. All materials used in the construction of the designed landscape must be of industry-standard quality and sourced sustainably where
possible.
No materials used on site shall be toxic to humans, animals, or plants.
All selected materials must be approved by the client prior to on-site construction.
LANDSCAPING SCHEDULE Service conduits are to be provided to all garden beds for irrigation and drainage purposes.
Conduits for lighting should be provided where required.
Code Scpecies Name Common Name Size Quantity Adequate drainage for planting areas, considering specific site soil conditions, is to be ensured through the use of slotted agricultural
drains (select type for application), overland flow paths within gardens (select river gravel on geofabric material), and surface stormwater
gc1 Austromyrtis Dulcis Midgen Berry 140 mm 231
pits (located in generally concealed positions).
gc2 Blechnum Indicum Swamp Water Fern 140 mm 61
Hardscape
gc3 Dianella Caerulea Flax Lily 140 mm 32
Proposed hardscape items are to be constructed to Australian Standards and relevant Council codes by a suitably licensed contractor.
Workplace Health and Safety regulations must be implemented during the construction phase.
gc4 Grevillea Cooroora Cascade 140 mm 128
Plant Management (AS 2303-2015 Tree Stock for Landscape Use)
gc5 Hibbertia Scandens Snake Vine 140 mm 104
All plant species are detailed within the plant schedule; no substitutions are allowed without prior acceptance by the Council and Project
gc6 Lomandra Verday 140 mm 197 Landscape Architect.
The contractor shall obtain all specified plants from an accredited nursery or other approved source.
gc7 Scaevola Calendulacea Dune Fan Flower 140 mm 27
Plants are to be pre-watered before arriving on site.
Plants must be healthy, hardy, and of good form.
gc8 Viola Hederacea Native Violet 140 mm 94
The root system of each plant should not be root-bound and must be conducive to successful transplantation.
s1 Alpina Caerulea Native Ginger 200 mm 19
All plants are to be pest and disease-free, with containers free from weeds.
Street tree species must comply with NATSPEC and relevant Council conditions.
s2 Banksia Spinulosa Hairpin Banksia 200 mm 2 Stake trees with a minimum of two 50x50 HWD stakes and hessian strap or similar, ensuring no damage to the tree; a 'figure 8' detail is
recommended.
s3 Banksia Robur Swamp Banksia 200 mm 17 No type of stake is to be placed through the rootball of the plant at any time.
Each plant is to have added water crystals to the planting hole and watered in after planting as required.
s4 Asplenium Australasicum Bird's Nest Fern 200 mm 13 Plant stock may be rejected if it does not conform to the above specifications.
s5 Cordyline Petiolaris Palm Lily 200 mm 19 Softscape (AS 4419-2003, Soils for Landscaping and Garden Use; AS 4454-2003, Composts, Soil Conditioners, and Mulches)
s6 Cordyline Stricta Palm Lily 200 mm 63 The setout of all softscape areas must be in accordance with approved plans.
Planting areas are to be mounded to achieve adequate drainage and aesthetic presentation.
s7 Grevillea 'Superb' 200 mm 19 Soil: A good quality, friable, moderately draining, organic-enriched landscaping soil mix shall be imported from an approved source. The
soil should not contain any clay and must be free from contaminants such as weeds, sticks, and rocks. Implementation within garden
s9 Lepidozamia Peroffskyana 200 mm 15 areas should be to a minimum depth of 300mm.
Organic Mulch: Hoop pine mulch, in its variety of forms, is to be supplied and installed to a minimum depth of 100mm. Mulch must be free
s10 Melaleuca 'Claret Tops' 200 mm 14 of foreign matter, including weeds, soil, sticks, and rocks. Avoid placing mulch against the stem or trunk of plants. Grade mulch to be self-
retained within garden edging.
s11 Syzygium 'Aussie Boomer' 200 mm 13 Gravel Mulch: Selected washed river mulch, graded in size and color, is to be used in areas as specified on plans. It will be used to
separate organic mulch from building walls, adjacent paths, and to facilitate drainage within garden beds. The minimum depth is to be
s12 Syzygium 'Resilience' 200 mm 13
twice the diameter of the largest pebble.
t1 Banksia Integrifolia Coastal Banksia 45 L 7 Turf
t1 RETAINED 45 L 1 Turf shall consist of dense, well-rooted, vigorous grass growth with a minimum of 25mm of topsoil.
Turf is to be delivered to the site within 24 hours of being cut.
t2 Banksia Serrata Old Man Banksia 45 L 4 Turf should be free from deleterious material, including weeds, seeds, or roots, including nut grass and oxalis.
Turf shall be supplied in uniform size and in unbroken condition.
t3 Cyathea Cooperi Australian Tree Fern 45 L 7
The moisture level of turf must remain consistent during laying.
Turf is to be laid along contours and pinned if the slope is greater than 1:4.
t4 Cupaniopsis Anacardiodes Tuckeroo 45 L 7
Prepare the subgrade to a level base with an approved topsoil and spread under-turf fertilizer at the recommended rate.
t5 Pandanus Tectorius Screwpine 200 L 3
Turf is to finish level with paths, edges, and curbs after rolling and settlement.
Irrigation (To All Planters & Undercroft Areas)
t6 Waterhouse Floribunda Weeping Lilly Pilly 45 L 5
Irrigation must be installed by a suitably qualified contractor and in accordance with all Council water regulations.
The most water-efficient method of irrigation is to be used, connected to tank supply where possible.
Conduits are to be laid to all garden areas to provide regulated coverage.
Flush and pressure test prior to commissioning.
Provide "as constructed" drawings clearly showing the location of all irrigation components.
NOOSA COUNCIL
Landscape Establishment Period
APPROVED PLAN
The contractor is responsible for the care and maintenance of all landscape works for a period of 13 weeks after completion.
MCU25/0092 & OPW25/0143 Maintenance includes mowing turf, removing and spraying weeds, pruning and trimming shrubs where required, replacing dead or
20 APRIL 2026 diseased plant stock, and ensuring the correct working of the irrigation system.
Water is to be provided to all soft landscaping at a required rate during the establishment period to ensure healthy and vigorous growth.
NOTES: DATE REV Revision ID ISSUE PROJECT: CLIENT: DRAWING NAME: PROJECT No: PHASE: DRAWING No: REV:
23/03/2026 D D Structure Revision
MARTIN ST DAVID & JENIFER BULL Landscaping Notes 005 SD SD 400-00 D
5 MARTIN STREET, PEREGIAN
BEACH, QLD. SCALE:
SCHEMATIC DESIGN DA
COPYRIGHT LAWRIE DESIGN
N/A
GSPublisherVersion 0.13814.100.0
Page 7
SITE BOUNDARY 355°00' - 32.505
Vegetation Legend
Trees to be Removed
GB1
10,270
10,270 P1 - Paving. Refer Eng's
1 9,593
1 Detail and Specifications
2 1
3
T1 - Turfed Area Type 1
2 2
9,870 T2 - Turfed Area Type 2
GB1
T2 GB1 GB1 - Mulched Garden Beds
9,593
GB2 - Planters
Bin t1 - Banksia Integrifolia
GB2
Bse t2 - Banksia Serrata
3 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 9,293
GB2 10,370 6 5 4 3 2 1
Cc t3 - Cyathea Cooperi
SITE
GB2
BOU
T1
ND
GB2
ARY
10,370
9,293 P3 Can t4 - Cupaniopsis Anacardiodes
10
9,570 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
1°00
4 4
SITE BOUNDARY 265°00' - 26.152
6 5 4 3 2 1
' - 23
.183
GB2 Pt t5 - Pandanus Tectorius
Wf t6 - Waterhouse Floribunda
GB1
Ac s1 - Alpina Caerulea
9,370
9,320
9,540 Bs s2 - Banksia Spinulosa
T2
5
4 3 2 1 Br s3 - Banksia Robur
5 5
As s4 - Asplenium Australasicum
9,100
6 6
5
6 Cp s5 - Cordyline Petiolaris
GB2 4
3
2 8,565 Cs s6 - Cordyline Stricta
1
NOOSA COUNCIL Gs s7 - Grevillea 'Superb'
T2 APPROVED PLAN
Ghg s8 - Grevillea 'Honey Gem'
MCU25/0092 & OPW25/0143
GB1 20 APRIL 2026 Lp s9 - Lepidozamia Peroffskyana
Mc s10 - Melaleuca 'Claret Tops'
SI
TE
BO
UN
GB1 Sa s11 - Syzygium 'Aussie Boomer'
DA
RY
13
8°
00
'-
P1 6.
Sr s12 - Syzygium 'Resilience'
42
6
gc1 - Austromyrtis Dulcis
WM
SITE BOUNDARY 175°00' - 20.982
GB1
gc2 - Blechnum Indicum
gc3 - Dianella Caerulea
A B C D E F G H
gc4 - Grevillea 'Cooroora Cascade'
S S gc5 - Hibbertia Scandens
T1
gc6 - Lomandra "Verday"
gc7 - Scaevola Calendulacea
S
gc8 - Viola Hederacea
NOTES: DATE REV Revision ID ISSUE PROJECT: CLIENT: DRAWING NAME: PROJECT No: PHASE: DRAWING No: REV:
23/03/2026 D D Structure Revision
MARTIN ST DAVID & JENIFER BULL Landscaping: Surface Finishes 005 SD SD 400-01 D
5 MARTIN STREET, PEREGIAN
N
BEACH, QLD. SCALE:
SCHEMATIC DESIGN
COPYRIGHT LAWRIE DESIGN
1:125
GSPublisherVersion 0.13814.100.0
Page 8
SITE BOUNDARY 355°00' - 32.505
Vegetation Legend
Wf Can Wf Can Wf Can Trees to be Removed
10,270 1.50
Pt
10,270
0 P1 - Paving. Refer Eng's
1 9,593 1.00
0
1.50
1 Detail and Specifications
2 1 0
3
t6 x1 t4 x1 t6 x1 t4 x1 t6 x1 t4 x1 t2 x1 T1 - Turfed Area Type 1
2 2
9,870 t1 x1 T2 - Turfed Area Type 2
Bse
t5 x1 GB1 - Mulched Garden Beds
9,593
Bin
GB2 - Planters
t4 x1
Can Bin t1 - Banksia Integrifolia
Pt
t3 x1 t3 x1
Bin t5 x1
Bse t2 - Banksia Serrata
Cc Cc t1 x1
3 3
t3 x1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 9,293
t3 x1
Cc 10,370 6 5 4 3 2 1
Cc t3 - Cyathea Cooperi
SITE
Cc
BOU
ND
Cc
ARY
10,370
9,293 t3 x1 t4 x1 Can t4 - Cupaniopsis Anacardiodes
t3 x1
10
9,570 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
1°00
4 4
SITE BOUNDARY 265°00' - 26.152
6 5 4 3 2 1
' - 23
.183
Cc Cc
t3 x1 Bse Pt t5 - Pandanus Tectorius
Can
1.00
0
1.00
0
1.50 t2 x1
0
Wf t6 - Waterhouse Floribunda
Ac s1 - Alpina Caerulea
9,370
9,540
9,320 EXISTING TREE
RETAINED Bs s2 - Banksia Spinulosa
5
4 3 2 1 Br s3 - Banksia Robur
5 5
As s4 - Asplenium Australasicum
9,100
6 6
5
6 Cp s5 - Cordyline Petiolaris
4
3 Can
2 8,565 t4 x1 Cs s6 - Cordyline Stricta
1
Pt
Gs s7 - Grevillea 'Superb'
Bse Bin
Ghg s8 - Grevillea 'Honey Gem'
Bin t1 x1
Lp s9 - Lepidozamia Peroffskyana
Wf t5 x1
Wf Mc s10 - Melaleuca 'Claret Tops'
BO
SI
TE t1 x1
UN
Sa s11 - Syzygium 'Aussie Boomer'
DA
RY
13
8°
00
'-
Bin
6.
Sr s12 - Syzygium 'Resilience'
42
6
Bin
gc1 - Austromyrtis Dulcis
WM
SITE BOUNDARY 175°00' - 20.982
gc2 - Blechnum Indicum
gc3 - Dianella Caerulea
A B C D E F G H NOOSA COUNCIL
APPROVED PLAN gc4 - Grevillea 'Cooroora Cascade'
S 5.000 S MCU25/0092 & OPW25/0143
Can Bse gc5 - Hibbertia Scandens
Bin
20 APRIL 2026
gc6 - Lomandra "Verday"
gc7 - Scaevola Calendulacea
S
t6 x1 t1 x1 t6 x1 t2 x1 t1 x1
EXISTING TREES gc8 - Viola Hederacea
t1 x1 REMOVED t2 x1 t4 x1
NOTES: DATE REV Revision ID ISSUE PROJECT: CLIENT: DRAWING NAME: PROJECT No: PHASE: DRAWING No: REV:
23/03/2026 D D Structure Revision
MARTIN ST DAVID & JENIFER BULL Landscaping: Trees 005 SD SD 400-02 D
5 MARTIN STREET, PEREGIAN
N
BEACH, QLD. SCALE:
SCHEMATIC DESIGN
COPYRIGHT LAWRIE DESIGN
1:125
GSPublisherVersion 0.13814.100.0
Page 9
SITE BOUNDARY 355°00' - 32.505
Vegetation Legend
gc1 x15
Sr Sa Sr Sa Sr Sa Sr Sa Sr Sa Gs gc4 x10 Trees to be Removed
Sa Cs
gc6 x25
Cs Cs Cs Cs Cs Cs Cs Cs 10,270 Cs Cs
Cs10,270 Cs P1 - Paving. Refer Eng's
1 9,593
1 Detail and Specifications
s12 x7 s6 x14 s11 x7 2 1
Sr 3
gc2 x30 Mc T1 - Turfed Area Type 1
Gs
2 gc3 x25 2
gc1 x30
Sa
9,870 Br s3 x2 T2 - Turfed Area Type 2
Cs GB1 - Mulched Garden Beds
Gs s7 x4
9,593
Sr gc8 x30
Cs Cs s6 x4 GB2 - Planters
gc1 x24
gc4 x20
Cs Mc s10 x2
s2 x2
Bs
Cs Bin t1 - Banksia Integrifolia
Br
s1 x2 gc8 x4 s7 x1 s3 x3 s1 x2 s6 x7
s5 x2 gc2 x3
Bs Br Gs
gc4 x10
gc8 x8 Cs
Br Cs Ac Br Cs Ac Cs Cs Bse t2 - Banksia Serrata
Cs Gs Cs
3 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 9,293 s5 x6 gc3 x7
Ac Cp
s1 x5 gc7 x7
10,370 6 5 4 3 2 1
Ac Cc t3 - Cyathea Cooperi
Cp
Cp Ac Cp Ac
SITE
Cp
Ac Cp
BOU
Cp Ac Cp Ac
Cp
ND
s7 x1
ARY
10,370 gc7 x20
Ac 9,293 Can t4 - Cupaniopsis Anacardiodes
10
9,570 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
1°00
gc2 x25
4 4
SITE BOUNDARY 265°00' - 26.152
Sa 6 5 4 3 2 1
' - 23
gc1 x12
.183
Cs Gs Cs Br Cs Cp Cs Cs
Cs gc8 x4 Br
Br
gc4 x5 gc2 x3 s5 x1 s3 x2 Pt t5 - Pandanus Tectorius
Sr
s5 x1 gc8 x4 s7 x2 Gs
s1 x1 Gs
Sa s1 x1 Ac Cs
Wf t6 - Waterhouse Floribunda
Cs s6 x5
Cs Mc
Sr gc6 x10
Ac s1 - Alpina Caerulea
9,370 Mc s10 x3
s7 x2
Gs
9,320
9,540 Bs s2 - Banksia Spinulosa
Sa s10 x1 s6 x6
Cs
5
Cs Mc
s6 x1
Cs 4 3 2 1 Br s3 - Banksia Robur
s3 x1 Br Cs s3 x3
5 Sr
Br 5
gc1 x18 gc4 x18 As s4 - Asplenium Australasicum
gc8 x10 9,100 Gs
Gs s7 x4
6 Sa
6
5
6 Cp s5 - Cordyline Petiolaris
Br
4
Cs
Cs 3 Cs
2
gc4 x18
8,565 Cs s6 - Cordyline Stricta
Mc
1
Ac
s12 x6 Sr Ac s1 x4
gc8 x12
Mc Cp
Cs Gs s7 - Grevillea 'Superb'
Br s9 x2 s6 x7 Gs
Cp s5 x5 s10 x1
s11 x6 Cs s1 x2 s10 x3 Cs
Sa s3 x1 Cs gc1 x10 Ghg s8 - Grevillea 'Honey Gem'
Cs s5 x4 s3 x2
Lp s9 x3 s7 x1
s6 x6
Cs Br Mc Gs
Cp s6 x4
Lp s9 - Lepidozamia Peroffskyana
Ac s1 x2
Cs
Sr Cp gc8 x22 s3 x1
Gs
Lp Mc Cs
Cs gc1 x32 s7 x1
Cp Br Cs Mc s10 - Melaleuca 'Claret Tops'
Lp
Cp Cp
SI
s6 x2
Ac
TE
Sa Mc Mc Ac Gs BO
Ac Ac Br UN
Cs Sa s11 - Syzygium 'Aussie Boomer'
DA
Lp Cs Gs RY
Cs Cp Cs Ac Cp Cs 13
Cs Lp Gs 8°
Cs
00
Cs Cs
'-
Gs Mc
6.
Sr s12 - Syzygium 'Resilience'
42
Sr Gs 6
s6 x5
Mc Cs Br Br s7 x2
Mc Cs gc1 - Austromyrtis Dulcis
Cs
WM
gc6 x14
SITE BOUNDARY 175°00' - 20.982
gc1 x42 gc4 x12 s6 x2 s10 x2 gc2 - Blechnum Indicum
gc1 x36 gc5 x49 gc6 x14 s7 x2 s3 x2 gc6 x10
gc6 x34 gc1 x12 s10 x2 gc4 x10 gc3 - Dianella Caerulea
A B C D E F G H NOOSA COUNCIL
gc4 - Grevillea 'Cooroora Cascade'
APPROVED PLAN
S S MCU25/0092 & OPW25/0143 gc5 - Hibbertia Scandens
20 APRIL 2026
gc6 - Lomandra "Verday"
gc7 - Scaevola Calendulacea
S
gc8 - Viola Hederacea
NOTES: DATE REV Revision ID ISSUE PROJECT: CLIENT: DRAWING NAME: PROJECT No: PHASE: DRAWING No: REV:
23/03/2026 D D Structure Revision
MARTIN ST DAVID & JENIFER BULL Landscaping: Ground + Mid Level 005 SD SD 400-03 D
5 MARTIN STREET, PEREGIAN
N
BEACH, QLD. SCALE:
SCHEMATIC DESIGN
COPYRIGHT LAWRIE DESIGN
1:125
GSPublisherVersion 0.13814.100.0
Page 10
SITE BOUNDARY 355°00' - 32.505
Vegetation Legend
Trees to be Removed
P1 - Paving. Refer Eng's
1 1 Detail and Specifications
T1 - Turfed Area Type 1
2 As 2
Lp
T2 - Turfed Area Type 2
GB1 - Mulched Garden Beds
Lp
GB2 - Planters
As
As
Bin t1 - Banksia Integrifolia
Lp s9 x4
13,690 13,690
Bse t2 - Banksia Serrata
3 As 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
As s4 x4
Cc t3 - Cyathea Cooperi
SITE
s9 x3 Lp
BOU
ARY ND
Lp Can t4 - Cupaniopsis Anacardiodes
10
19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
1°00
As
4 4
SITE BOUNDARY 265°00' - 26.152
' - 23
gc6 x35
.183
gc6 x35 As
Pt t5 - Pandanus Tectorius
gc5 x32
gc5 x32
s4 x6 As Wf t6 - Waterhouse Floribunda
As Ac s1 - Alpina Caerulea
Lp
Bs s2 - Banksia Spinulosa
Lp
Br s3 - Banksia Robur
As
5 5
As s4 - Asplenium Australasicum
6 Lp As Lp As Lp As 6 Cp s5 - Cordyline Petiolaris
Cs s6 - Cordyline Stricta
s9 x3 s4 x3 gc5 x16 gc6 x20
Gs s7 - Grevillea 'Superb'
Ghg s8 - Grevillea 'Honey Gem'
Lp s9 - Lepidozamia Peroffskyana
Mc s10 - Melaleuca 'Claret Tops'
SI
TE
BO
UN
Sa s11 - Syzygium 'Aussie Boomer'
DA
RY
13
8°
00
'-
6.
Sr s12 - Syzygium 'Resilience'
42
6
gc1 - Austromyrtis Dulcis
SITE BOUNDARY 175°00' - 20.982
gc2 - Blechnum Indicum
gc3 - Dianella Caerulea
A B C D E F G H
gc4 - Grevillea 'Cooroora Cascade'
gc5 - Hibbertia Scandens
NOOSA COUNCIL gc6 - Lomandra "Verday"
APPROVED PLAN
MCU25/0092 & OPW25/0143 gc7 - Scaevola Calendulacea
20 APRIL 2026 gc8 - Viola Hederacea
NOTES: DATE REV Revision ID ISSUE PROJECT: CLIENT: DRAWING NAME: PROJECT No: PHASE: DRAWING No: REV:
23/03/2026 D D Structure Revision
MARTIN ST DAVID & JENIFER BULL Landscaping: Upper Level 005 SD SD 400-04 D
5 MARTIN STREET, PEREGIAN
N
BEACH, QLD. SCALE:
SCHEMATIC DESIGN
COPYRIGHT LAWRIE DESIGN
1:125
GSPublisherVersion 0.13814.100.0