Skip to the record
The only place to find full transcripts.

Council archive · source document

Negotiated Decision Notice - 010.2007.00000256.001 [As Published] · 132007.256

of 20

Text shows just the words. Original shows the document exactly as it was published.

                                                                                        2007/256



      It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9
      explaining exactly how to predict waste quantities and design waste areas is available from
      Council and the web. The Plan shall include the following information: -
          The types of waste that will be generated from the activities approved within the
            development.
          Estimated volumes or tonnage of both recyclables and waste generated.
          Methods to be used for dealing with garden waste.
          Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
          Description of procedures for getting all waste to the bins; the storage of bins and the
            collection of bins by the contractor.
          A description of the design details of waste storage and recycling areas including size,
            location, elevation and floor plan, methods of bin washing and system to prevent storm
            water getting into sewer via the bin wash.
          A description of types and volume of waste storage containers to be used.
          The waste and recycling storage area shall include the provision of containers for all
            waste and recycling materials including putresable matter, non-recycling waste, paper/
            cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin
            washing facilities connected to sewer.
          A detailed description of vehicular access to collect waste. Where collection is off
            street, access must allow vehicles to enter and leave the site in a forward direction.
72.   A Waste Management Plan (construction and demolition) shall be submitted prior to
      demolition, removal or relocation of any building other than a shed.
      A Waste Management Plan (construction and demolition) is also required for construction of
      15 or more dwelling units or for any business use of greater than 500m².

      Waste Management Plans (construction and demolition) are required to be submitted in
      accordance with Planning Scheme Policy 11, Waste Management Plans see table below.

      Waste storage areas are to provide for adequate separation of all reusable, recyclable and
      waste materials. These shall be located so that they are convenient and safe to use. (Refer to
      Noosa Council Waste Management Code)
      The Plan shall contain the following information:
          The site area for the storage and separation of waste is to be shown on the plan
            drawings accompanying the application.
          A waste management table as indicated below is to be completed showing how waste
            material is to be segregated - recycled – reused or disposed.




                                                                                         11 of 20

Used in these records

About this file

File size
101 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice - 010.2007.00000256.001 [As Published].pdf · 101 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.