16th August 2013                                                              Level 9, 269 Wickham St
Ref. no. 2012.164.600                                                         PO Box 612 Fortitude Valley
                                                                              QLD 4006, Australia
                                                                              T +61 7 3251 8555
Sunshine Coast Council                                                        F +61 7 3251 8599
Locked Bag 72                                                                 [email protected]
SUNSHINE COAST MC QLD 4560                                                    www.blightanner.com.au
                                                                              ABN 32 061 537 666
Attention:      Mark Lewis

Dear Mark,

PROJECT: Noosa Flexi-Learning Centre OPW13/0463

RE:             Preliminary approval

On 6th August we received notice that a preliminary approval had been issued for the above
project, and that a Development Permit for Operational Works was pending the payment of a
performance bond.

That bond has now been paid to Council, and so we hereby request that a Development
Permit for Operational Works be issued.

Stormwater drainage
We note that Council intends to issue a condition requiring a piped stormwater connection to
the pipe in the street. Our previously submitted documentation demonstrates that, based on
the site soils and unique site design, flows will rarely flow across the footpath. The infiltration
rate of the site soils exceeds the 100 yr ARI (1% AEP) rainfall intensity, and any flows across
the footpath will be rare, of shallow depth, low velocity, short duration and an improvement
on existing conditions.

We appreciate the precautionary approach taken by Council, however this community project
has a finite budget, and the cost of installing this stormwater connection (with associated
trenching, pits, concrete boring, pipework and footpath reinstatement) is likely to cost about
$8,000. Including this item is likely to come at the expense of other sustainability features in
the project, including the elevated rainwater tank which is intended to symbolise sustainable
water use and reduce the long-term energy demands associated with pumping rainwater
(instead a more conventional tank and pump arrangement would be used). It would be a real
shame to lose that feature in order to provide a non-essential piped stormwater connection.

We request Council reconsider the evidence we have put forward in relation to the
stormwater connection, and would be happy to come and meet with relevant Council officers
to discuss.

Yours faithfully,



Alan Hoban
Principal Environmental Engineer
BLIGH TANNER PTY LTD
    DIRECTORS | ROD BLIGH | CHRIS TANNER | PAUL CALLUM | DAVID HAMLYN-HARRIS | PAUL EASINGWOOD

Used in these records

About this file

File size
34 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2013-08-16 Prelim approval OPW13-0463.pdf · 34 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.