MINUTES
Planning & Environment
Committee Meeting
Tuesday, 12 July 2022
9.30am
Council Chambers, 9 Pelican Street, Tewantin
Committee: Crs Brian Stockwell (Chair), Karen Finzel, Clare Stewart, Tom Wegener
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 11 sections
Section 2
PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES 12 JULY 2022
1. ATTENDANCE & APOLOGIES
COUNCILLORS
Cr Brian Stockwell (Chair)
Cr Tom Wegener
Cr Frank Wilkie (Acting Mayor)
Cr Amelia Lorentson (non-Committee Councillor)
EXECUTIVE
S Waters, Chief Executive Officer
L Jensen, Acting Director Environment and Sustainable Development
APOLOGIES
Cr Karen Finzel
Cr Clare Stewart
The meeting commenced at 9.32am.
2. CONFIRMATION OF MINUTES
Committee Recommendation
Moved: Cr Wegener
Seconded: Cr Wilkie
The Minutes of the Planning & Environment Committee Meeting held on 7 June 2022 be
received and confirmed.
Carried unanimously.
3. PRESENTATIONS
Nil.
4. DEPUTATIONS
Nil.
Page 2 of 12
Section 3
PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES 12 JULY 2022
5. REPORTS FOR CONSIDERATION OF THE COMMITTEE
1 RAL22/0001 – APPLICATION FOR RECONFIGURATION OF A LOT (1 INTO 2 LOTS) AT
9 MAPLE STREET, COOROY
Committee Recommendation
Moved: Cr Wilkie
Seconded: Cr Wegener
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting of 12 July 2020 regarding RAL22/0001 for a Development Permit for
Reconfiguring a Lot (1 Lot into 2 Lots) situated at 9 Maple Street Cooroy and:
A. Approve the application in accordance with the following conditions:
PLANNING
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by the conditions of this Decision Notice
must be completed prior to submission of the subdivision plan to Council for
compliance assessment.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
21-5373AB - Plan of Proposed Reconfiguration of Lot 3 on 12 January 2022
SP327330 prepared by Max Watterson + Associates
3. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
Currency Period
4. This development approval lapses if the requirements of the conditions have not been
completed and an application for plan seal is not lodged with Council by 21 July 2026,
unless an application to extend the currency period is approved by Council.
Road Closure
5. An application is to be made to the Department of Natural Resources, Mines and
Energy (DNRME) to permanently close the section of road reserve along the Maple
Street frontage of proposed Lot 31.
If the application is approved, or approved in part, the area of road reserve is to be
amalgamated with adjoining lot(s) and no additional lots created. If the application to
close the road is refused, a copy of the advice from the DNRME stating that fact must
be submitted to Council prior to the signing of the Plan of Subdivision.
Boundary Encroachments
6. Certification must be submitted to Council from a Licensed Surveyor which certifies
that:
a. the setback/s to any new boundaries for any existing buildings remaining on the
site comply with the relevant provisions of the planning scheme and the Building
Act 1975, unless varied by this Decision Notice.
b. all constructed access and roadworks (including associated fill batters and
retaining walls) are fully contained within a dedicated reserve or registered
Page 3 of 12
Section 4
PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES 12 JULY 2022
easement.
c. all utility services and connections (e.g. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included
within an easement.
d. all existing effluent disposal areas are wholly located within the lot they serve and
comply with the boundary setback requirements of the Plumbing and Drainage
Act 2002 and associated codes and requirements.
e. all dams (including ponded water, dam walls and associated spillway structures)
are wholly located within the boundaries of a single lot.
f. all retaining walls and structures are fully contained within the lot they retain.
g. any fill, including fill batters, are wholly contained within the subject site and not
on adjacent properties.
h. for the community title scheme, the road pavement changes required by this
Decision Notice accurately demarcate the boundaries of the public and private
land.
Water & Sewer Connections
7. An underground connection to reticulated water and sewerage must be provided to
each lot in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to each lot.
Stormwater Drainage
8. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Services
9. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
10. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
11. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater) which certifies that the development has met the requirements
of this Decision Notice and all applicable legislation at the time of construction.
Easements
12. Existing easement Emt A on RP87371 (Easement for Access within Lot 3 on SP327330
to benefit Lot 1 on RP87371 – RP87371 is now contained within Lot 5 on SP213104)
is no longer relevant for its intended purpose, and must be extinguished prior to sealing
of the survey plan.
13. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
14. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
Page 4 of 12
Section 5
PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES 12 JULY 2022
endorsement.
15. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Damage to Services and Assets
16. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Carried unanimously.
2 MCU21/0228 & OPW21/0364 – CHANGE REPRESENTATIONS TO A DEVELOPMENT
APPROVAL FOR MULTIPLE DWELLING AND OFFICE, AND ROADWORK, DRAINAGE
WORK, LANDSCAPING, STORMWATER, EARTHWORKS - 245 DAVID LOW WAY
PEREGIAN BEACH QLD 4573
In accordance with Chapter 5B of the Local Government Act 2009, Cr Stockwell provided the following
declaration to the meeting of a declarable conflict of interest in this matter:
I, Cr Stockwell, inform the meeting that I have a declarable conflict of interest in this matter in relation
to the application by Altum Properties Group listed as Item 2. On 24 February 2020 I sought a review
by the Independent Council Election Observer (ICEO) as to the public claims of the Future Noosa
Team, of which Leigh McCready was publicly identified as a Campaign Manager. Leigh McCready is
associated with the applicant. Although I have a declarable conflict of interest, I do not believe a
reasonable person could have a perception of bias. Therefore, I will choose to remain in the meeting
room. However, I will respect the decision of the meeting on whether I can remain and participate in
the decision.
The CEO appointed Cr Wegener as Chair for the purpose of considering Cr Stockwell’s conflict of
interest declaration.
Committee Resolution
Moved: Cr Wilkie
Seconded: Cr Wegener
That Council note the declarable conflict of interest by Cr Stockwell and determine that it is in the
public interest that Cr Stockwell participates and votes on this matter because Council believes that a
reasonable person could not have a perception of bias because the ICEO review was advisory service,
not a statutory process, and Cr Stockwell’s queries at that time were in the public interest and neither
he nor Ms McCready stood to personally gain or lose from that advice and therefore a reasonable
person would trust that the final decision is made in the public interest.
Carried unanimously.
Cr Stockwell resumed the Chair.
Committee Recommendation
Moved: Cr Wilkie
Seconded: Cr Stockwell
That Planning & Environment Committee Agenda Item 2 be referred to the General
Committee for further consideration.
Carried unanimously.
Page 5 of 12
Section 6
PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES 12 JULY 2022
3 MCU19/0017.02 & RAL19/0004.02 – MINOR CHANGE TO DEVELOPMENT APPROVAL
FOR COMMERCIAL BUSINESS - TYPE 1 OFFICE, COMMERCIAL BUSINESS - TYPE 2
MEDICAL & ANCILLARY DWELLING UNIT & RECONFIGURATION OF A LOT – ACCESS
EASEMENT AT 36 - 40 HOFMANN DRIVE, NOOSAVILLE
Committee Recommendation
Moved: Cr Stockwell
Seconded: Cr Wilkie
That Planning & Environment Committee Agenda Item 3 be referred to the General
Committee for further consideration.
Carried unanimously.
4 FURTHER REPORT - MCU21/0083 - APPLICATION FOR A MATERIAL CHANGE OF USE
– MULTIPLE DWELLINGS (10 X DWELLING UNITS) AT 25 AND 27 TOOLAR STREET,
TEWANTIN
Committee Recommendation
Moved: Cr Wilkie
Seconded: Cr Stockwell
That Council note the Further Report by the Coordinator Planning to the Planning and
Environment Committee Meeting dated 12 July 2022 regarding Application No. MCU21/0083
for a Development Permit for a Material Change of Use – Multiple dwellings (10 dwelling
units) situated at 25 and 27 Toolar Street Tewantin and
A. Approve the application in accordance with the following conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the
use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions. In this regard, the Approved Plans
must be amended to incorporate the amendments listed within this Decision Notice
and resubmitted to Council prior to the issue of any Development Permit for
Operational Works
Plan No. Rev. Plan/Document Name Date
TP-0001-M H Site Plan and Site Cover, prepared by Robin Spencer 07.06.2022
Architecture
TP-0001-B B Site Vehicular Manouvring, prepared by Robin Spencer 07.06.2022
Architecture
TP-0003-D Site Landscaping Calculation Plan, prepared by Robin 07.06.2022
Spencer Architecture
TP-2010-L J Proposed Townhouses Ground Floor Plan, prepared by 07.06.2022
Robin Spencer Architecture
TP-2011-K I Proposed Townhouses First Floor Plan, prepared by Robin 07.06.2022
Spencer Architecture
Page 6 of 12
Section 7
PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES 12 JULY 2022
Plan No. Rev. Plan/Document Name Date
TP-2012-H E Proposed Townhouses Typical Unit Plans, prepared by 07.06.2022
Robin Spencer Architecture
TP-7010-I G External Elevations All Elevations, prepared by Robin 07.06.2022
Spencer Architecture
TP-7020-C B General Sections, prepared by Robin Spencer Architecture 07.06.2022
Page 2 of 6 4 Landscape and surface treatments plan, prepared by inSite 10.06.2022
EMLA
Page 3 of 6 4 Landscape planting plan 1 of 3, prepared by inSite EMLA 10.06.2022
Page 4 of 6 4 Landscape planting plan 2 of 3, prepared by inSite EMLA 10.06.2022
Page 5 of 6 4 Landscape planting plan 3 of 3, prepared by inSite EMLA 10.06.2022
Page 6 of 6 4 Plant palette, prepared by inSite EMLA 10.06.2022
000-F F Cover Sheet, (specifically colours and materials) prepared 01.10.2021
by Robin Spencer Architecture
Nature and Extent of Approved Use
3. The use must include a minimum of 8 small dwelling units as defined by the Noosa
Plan 2020.
Currency Period
4. This development approval lapses if the use has not happened by 21 July 2027, unless
an application to extend the currency period is approved by Council.
Built Form and Development Appearance
5. The maximum height of the development must not exceed 8 metres above the natural
ground and finished levels.
6. Certification must be submitted to Council from a Licensed Surveyor which certifies
that the buildings do not exceed the maximum height requirement of this Decision
Notice.
7. All air conditioning units or other mechanical equipment must be fully enclosed or
screened such that they are not visible from the street frontages nor adjoining
properties.
8. All deck and balcony areas above ground floor must not be enclosed by permanent
fixtures such as shutters, louvres, glass panelling or the like, except where required to
satisfy any privacy condition of this Decision Notice.
9. The development must incorporate the colour scheme and mix of materials as outlined
in the approved colour palette and approved plans.
Performance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to pre-start meeting. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond
or guaranteed sum to effect compliance with conditions.
Protection of Privacy
11. Where windows, balconies, terraces, verandahs or decks overlook or have the
potential to overlook the private open space of nearby properties or view into habitable
room windows within 10 metres:
a. windows have a sill height of not less than 1.7 metres above finished floor level;
Page 7 of 12
Section 8
PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES 12 JULY 2022
b. windows and other openings are permanently screened to a minimum height of
1.7 metres to avoid overlooking;
c. windows and doors use translucent glazing to obscure views; or
d. windows or balconies are offset by 45 degrees or more.
12. To ensure the privacy of the adjoining properties to the north is protected, the northern
elevation of the upper-level decks to Units 9 and 10 must be screened to a height of
1.7 metres or treated in such a way to obscure direct views into the habitable room
windows or private open space areas of the adjoining property.
Street Identification
13. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate,
the building name.
Water & Sewer Connections
14. An underground connection to reticulated water and sewerage must be provided to the
development site in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
15. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
Fencing and Walls
16. Fencing to adjoining residential uses must be provided in accordance with the
approved plans.
17. Street fencing must be provided generally as shown on the approved plans.
18. The area of land between the fence and the front property boundary must be densely
landscaped to screen any fencing from the street. A mix of understorey and taller
species must be included.
Clothes Drying Areas
19. Each dwelling unit must be provided with access to an outdoor clothes line which is
screened from public view.
Community Management Statement
20. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the Building
Format Plan (or similar) to Council for compliance assessment.
21. All clauses and by-laws of the proposed Community Management Statement must
accord with the requirements of this Decision Notice and, in particular, must include
the following additional clauses:
a. The site includes a stormwater management and water quality treatment system.
b. The stormwater management and water quality treatment system must be
maintained in accordance with the Water by Design (2009) Maintaining
Vegetated Stormwater Assets (Version 1).
c. The full cost of maintaining the system in accordance with the Water by Design
(2009) Maintaining Vegetated Stormwater Assets (Version 1) must be included
in the proposed levies for each dwelling owner/body corporate.
Page 8 of 12
Section 9
PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES 12 JULY 2022
Land Amalgamation
22. All properties that are subject to the development must be amalgamated into a single
lot prior to endorsement of the first survey plan (plan seal) for the development and
evidence of such amalgamation must be submitted to Council.
External Works
23. Toolar Street must be upgraded for the length of its frontage to the subject site. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. construction of a pedestrian footpath in accordance with the conditions of this
Decision Notice;
b. removal of the existing property accesses and reinstatement of the kerb, footpath
and verge area to match the balance of the site frontage, including the provision
of topsoil and turf where the existing verge is grassed.
Condition 23 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Site Access and Driveways
24. A sealed access driveway must be provided from Toolar Street to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance
with an Operational Works approval and must include in particular:
a. a driveway crossover generally in accordance with Council’s Standard drawing
RS-051 and any associated addendum.
b. a driveway generally in accordance with the approved plans.
c. suitable safety measures, including warning signage, to improve driver
awareness of pedestrians and enhance pedestrian safety.
Car Parking
25. A minimum of 15 car parking spaces must be provided and marked on the site and
made available and accessible at all times. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. 3 visitor parking spaces within the total, which are clearly marked for that purpose
and accessible at all times for visitor use;
b. dimensions, crossfalls and gradients in accordance with Australian Standard
AS/NZS2890.1:2004 - Parking Facilities;
c. The additional visitor car space must be provided adjacent to one of the proposed
visitor spaces.
26. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
27. Directional signage must be provided to direct visitors to the car parking spaces
provided on site.
Pedestrian and Bicycle Facilities
28. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. a 2.0 metre wide footpath within the road verge for the entire length of the site’s
frontage to Toolar Street together with transitions to the existing pathway on
either side of the site
Condition 28 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Page 9 of 12
Section 10
PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES 12 JULY 2022
Stormwater Drainage
29. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and the Queensland Urban Drainage Manual, and must include in
particular:
a. 7kL of storage for roofwater capture and reuse. The storage tank is to receive
only roofwater runoff and is to be provided with a solid lid to prevent the inflow of
surface runoff. A backflow prevention device is to be fitted to restrict the backflow
of water in the detention tank into the roofwater storage;
b. Captured roofwater is to be plumbed to communal non-potable fixtures, including
bin washdown and landscape irrigation;
c. Stormwater pits receiving surface runoff are to be provided with litter-baskets;
and
d. An underground detention tank is to be provided within the site to ensure site
discharges achieve non-worsening for the range of durations relevant to the
downstream drainage network.
30. In conjunction with the development application for Operational Works, revised
detention tank design calculations and documentation is to be provided which identifies
all assumptions and the methodology applied in deriving the tank design, and which is
based on the recommendations of Australian Rainfall and Runoff 2019 and QUDM
2017. Ensemble temporal patterns are to be utilised for the analysis as well as the
current rainfall intensities recommended by Bureau of Meteorology. The detention tank
is to achieve non-worsening for the range of durations and recurrence intervals relevant
to the downstream drainage network.
Condition 30 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Services
31. Reticulated electricity and telecommunication services must be provided to the
development in accordance with the standards and requirements of the relevant
service provider.
32. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
33. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater) which certifies that the development has met the requirements
of this Decision Notice and all applicable legislation at the time of construction.
Easements
34. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
35. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
endorsement.
36. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Page 10 of 12
Section 11
PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES 12 JULY 2022
Earthworks and Retaining Walls
37. All earthworks and associated retaining structures/batters must be undertaken in
accordance with an Operational Works approval, and contained entirely within the
subject site unless written permission from the respective landowner(s) is provided to
Council.
38. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
Damage to Services and Assets
39. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
LANDSCAPING
40. The site must be landscape in accordance with Planning Scheme Policy PSP2 –
Landscaping and generally in accordance with the approved landscape plans prepared
by inSite EMLA dated 10 June 2022. The works must be undertaken in accordance
with an operational works approval.
41. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
WASTE DISPOSAL
42. Prior to the issue of any Operational Works approvals the Operational Waste
Management Plan must be amended to reflect that all waste collection will be
undertaken by Council’s contractor via rear lift trucks with the trucks collecting 1100
litre bins.
43. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9 - Waste Management. The facilities must include an
impervious area, within the site, correctly sized for all refuse and recycling containers
and suitably screened from public places and neighbouring properties. A bin wash area
is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket
trap. The drain outlet must be designed to prevent storm water entry to the sewerage
system.
44. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
45. Storage, disposal and management of solid, liquid and vegetative waste is conducted
in a safe and ecologically sustainable manner without environmental nuisance. In this
regard, vegetated waste must be disposed of via a green waste bin or at a local transfer
station.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act
2016.
Carried unanimously.
Page 11 of 12
Section 12
PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES 12 JULY 2022
5 MCU21/0212 APPLICATION FOR A MATERIAL CHANGE OF USE FOR A DWELLING
HOUSE AT 66 SEAVIEW TERRACE, SUNSHINE BEACH
Committee Recommendation
Moved: Cr Stockwell
Seconded: Cr Wilkie
That Planning & Environment Committee Agenda Item 5 be referred to the General
Committee due to the significance of the issue.
Carried unanimously.
6. REPORTS FOR NOTING OF THE COMMITTEE
6 DEVELOPMENT ASSESSMENT FEES & CHARGES VARIATIONS FOR 1 JULY 2021 TO
30 JUNE 2022
Committee Recommendation
Moved: Cr Wilkie
Seconded: Cr Stockwell
That Council note the report by the Manger Development Assessment to Planning &
Environment Committee Meeting dated 12 July 2022 regarding waiver or partial waiver of
development application fees for 1 July 2021 to 30 June 2022 as detailed in the Report.
Carried unanimously.
7 PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY – MAY 2022
Committee Recommendation
Moved: Cr Wilkie
Seconded: Cr Wegener
That Council note the report by the Manager, Development Assessment to the Planning &
Environment Committee Meeting dated 12 July 2022 regarding planning applications that
have been decided by delegated authority.
Carried unanimously,
7. CLOSED SESSION
Nil.
The meeting closed at 10.53am.
Page 12 of 12