Original source · versioned page text
2025 Annual Disaster MANAGEMENT REPORT · Att 1 - TC Alfred March 2025 - lessons identified
Process or
discipline Issue Future Action? Priority
Technical Needed models to continuously be running with updated TC forecast data, not a static Need to ensure models are setup for this ahead of storm season, with most recent survey
snapshot at the start of event. Computational requirements are high, need to rerun at speed. data inputted. Council should consider holding SWAN Model calibrated version in
SWAN is okay but Xbeach is harder to loop. platform for any of the taskforce or panel to use in case one group isn't available during
an event.
Technical Data on ETA lines and elevation that Council has been collecting for the past two years was Continue coastal monitoring program and ensure there is sufficient contingency budget
essential to inform impact forecast models. Beach survey data (existing beach slope) was used for surveys pre and post major storms as disaster funding does not cover it
in the empirical calculation for overtopping on NMB
Technical Regional Coastal Process Model needs to calculate refraction well and calibrate wave models Ensure Regional Coastal Process Model scope takes this into account.
(Over-refracting waves coming around Moreton Island affected wave model
(overestimating/underestimating as models not calibrated)
Technical COASTS Dashboard was not too far off the mark. Needs calibration but relatively close in Need to consider what platform is best for info sharing during a disaster
forecasting during ex TC-Alfred.
Technical Bathymetric river/beach survey data Is this information able to be provided through use of drones
Technical Disaster Vendors – Strategic list of vendors to engage. Included in Guardian Resources the contractor list prepared and updated by Procurement.
Also noted that LGAQ are working on a Disaster Preferred Contractor list.
Meeting protocols LDMG meeting times – difficult to get to meeting in person when meeting times coincide Adjust meeting times to avoid peak traffic periods Low
with school drop off/pick off times – traffic bottlenecks
Meeting protocols Clarity around who should attend LDMG meetings in person vs. via Teams Develop attendance guidelines Medium
Meeting protocols Need for people to identify themselves and their role before speaking meetings Reinforce meeting etiquette Low
Meeting protocols Confirm LDMG membership and contacts before event, send out contact list on a rolling Administration duty sheet to be adjusted to include Low
basis
Meeting protocols Meeting invites and paperwork to be sent from one email address so it is not missed. Admin - all informatin and meeting invites to come from Medium
LDCC Admin profile
Communications Consider Sunshine Coast & Noosa Mayoral messaging with District Disaster Coordinator Explore technology options to allow this regardless of location of participants Medium
Technology A way to track Requests for Assistance would be handy Include in briefing of available tools during standup of LDMG Medium
Communications Sandbags – improved community messaging around What to do with sandbags after the Include post-event sandbag guidance in public messaging Medium
event
Resources Commercial vs residential premises and habited vs vacant holiday accommodation – Develop sandbag distribution policy through sandbag working group Medium
policy required to outline who should take precedence for sandbags.
Resources Sandbag supply to all 11 locations across the region was timely, efficient and constant. N/A
Resources Sandbagging locations – finalise formal locations. Confirm and document official sandbagging sites High
Compliment LDMG Agenda – was great having LDC report immediately after BoM briefing. Medium
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original