LINDSAY CONSULTING PTY LTD- STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED, AS TRUSTEE FOR THE LINDSAY FAMILY TRUST
1. INTRODUCTION
This report, the Stormwater Management Plan, details the proposed stormwater
management strategies for the proposed Unit development.
The stormwater Strategy is designed in accordance with the Noosa Council’s Stormwater
Planning Policy as well as the State Planning Policy.
2. SITE DESCRIPTION AND PROPOSED USE
The site is currently a vacant block of land of 594m2 . It is proposed (see Appendix A for
design drawings) that three units be constructed on site. When combined with paved
areas there is an approximate 455m2 of impermeable surface
The site is to be used for private residences to Appendix A for drawings detailing the
proposed location of Units.
3. PAVEMENT RUNOFF TREATMENT AND INFILTRATION
The runoff from all pavement areas shall be directed through a system of stormwater pits
and pipework to the LPOD identified as the Noosa Council Stormwater System, via the
Kerb and Channel in Willam Street.
4. STORMWATER QUANTITY
The rainfall data has been calculated as per QDUM and shows a non-worsening volume
of 6m3 of stormwater. Therefore, the stormwater design includes a 2000l detention tank
in each unit.
The minimum detention volume per unit shall be 2000L. Larger tanks may be used for
water harvesting and re-use, however, 2000L shall be made available for detention
volume in each tank.
REF: 20-1343 2
20 November 2020