07/1836 - MCU - Detached House [As Published] · 132007.1836
INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport
-For more information refer to Guide 23, schedute
8A of the IPA, & schedule 2 of the P Reaulation.
Untess you answered ‘none of the above’, the
application triggers referral lo QT asa :
concurrence egency..
IDAS Assessment Checklist, Version 20, 2 April 2007
. The application involves: (tick the applicable boxes)
(1 (i) a materlal change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
{-] Gi) reconfiguring a lot—
((@)_ onland that is completely or partly within a public transport corridor, and the
ce total number of lots increases; -
(J (b) on land that is completely or party within a future public transport corridor or
.. analrport's public safety area;
(2) _ ontand thatis within 400m of a public passeriger transport facility or a future”
. public passenger transport facility, and the total site area is 5000m2 or greater;
C1 (@) for a residential purpose within the 25 ANEF contour for an airport;
(J€) _ foraresidential purpose resulting in 100 or more allotments.
LA (il) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or-reconfiguring a lot mentioned in (iiy
above, on land that
E1(@)__ is completely or partly within a public transport corridor or a future public
- transport corridor;
(1b) _ willresutt in work that encroaches into an airpor''s operational airspace.
{I (iv) none of the above. _
Railway safety and efficlency
For more Information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the iP Requiation.
Uniess you answered “none of the above’, the
application tiggers teferraltoQT asa
concurrence agency. . 7
23,
The application involves: tick the appficable box/es)—
(0) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
CO fil) reconfiguring a lot—
C{a) __ ontand that is completely or partly within a future public transport corridor,
future railway land or a railway funnel easement;
{1(b) _ ontand that is within 400m of a Citytrain passenger railway station or a future
Citytraln passenger railway station, and the total site area is 5000m? or
greater, ;
(1 (6) ontand that abuts rail corridor land, commercial corridor land or future railway
land, and the fotal number of lots increases;
(1@) __ onJand that‘abuts rail corridor land, commerciat corridor iand or future railway
land and an easement abutting the corridor or future railway land is created;
Ol) ontand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(1() __ for aresidential purpose resulting in 100 or more allotments.
CJ (ill) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 60m?, on jand that—
1) is completely or partly within rail corridor land or commercial corridor land, and
. the work is not for rail transport infrastructure or other rail infrastructure;
(3 (0) _ is completely or partly within future railway land, or a railway tunnel easement;
(J (c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
(iv) none of the above.
Moonle to Brisbane pipeline
Fos more information refer to schedule 2of the IP
Reguiaisn.
Unless you answered “none of the above’, the
application triggers referral to the holder of
pipeline licence No 4 Issued under the Petroleum!
“Act 1923, currently Santos QNT Ply Ltd, for
advice.
24,
The application involves the easement for the construction or operation of the Moonie to
‘Brisbane strategic pipeline, and involves: tick the applicable box/es}—
C1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or party in the
easement.
C) (ii) reconfiguring a tot
(7) (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a fot, and the
work is located wholly or partly in the easement.
{& (iv) none of the above.
Pages
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1836 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.