Council archive · source document
07/1836 - MCU - Detached House [As Published] · 132007.1836
INTEGRATED PLANNING ACT 1997
“IDAS Assessment Checklist, Version 18.0, 10 November 2006
Whether particular. buildings may be
occupied for residential purposes
For more information go to schedule 2 table { of the
{P Regulation.
Assessment period 15 days. No response ls a
deemed refusal,
16.
An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
referral to the local government as the concurrence agency.
Design and siting
For more information go to schedule 2 table 1 of the
17.
An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code,
{P Regulation. . 18. An application may trigger referral to the local government as the concurrence agency if the building work
Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.
deemed refusal, 19. An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.
Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the
accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has
For more Information go to schedule 2 table 1 of the been completed. .
(PRegutation.
Assessment period 15 days. No responseis a
deemed refusal.
Higher risk personal appearance 21. An application may trigger referral to the local goverment as the concurrence agency to determine if the
services
For more information go to schedule 2 table 1 of the
IP Requtation and the QDC part 15,
Assessment period 15 days. No responses a
deemed refusal,
building work
© complies with the performance criteria of the Queensland Development code part 15; and
¢ the work does not comply with an acceptable solution stated in the part.
Building work for residential service
For more information go to schedule 2 tabte 1 of the
IP Requtation and the QDC part 20,
Assessment period 15 days. No response is a
deemed refusal.
22.
An application for building work for premises in which residential care service under the Residential -
Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
referral to the ocal goverment as the concurrence agency.
Building work for removal or
rebullding
For mere information go to schedule 2 tabla 1 of the
(P Requtation,
Assessment period 5 days. No response is a
deemed refusal.
23,
An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
teferral to the local government as the con agency.
Building work for rainwater tank in
designated rainwater tank area
For more information go to schedule 2 table 1 of the
IP Regulation and the QOC part 25,
Assessment period 15 days. No response is a
24.
8 Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and
« Under the Queenstand Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.
Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1836 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.