Skip to the record
The gold standard in government transparency.

Council archive · source document

07/1014 - Op Works - Landscaping, Carparking, Access, Frontage [As Published] · 142007.1014

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

> 4

wredaren PLANNING ACT 1997

Integration of land use and public
transport

Fos more informaiion refer to Guide 23, schedute
8A of the IPA, & schedule 2 of the [P Requtation.
Unless you answered “none of the above", the
application tiggers referral to.QT asa
concurrence agency.

 

IDAS Assessment Checklist, Version 20, 2 Apri 2007

22. The application involves: (tick the applicable box/es)—

1) (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

CO @i) reconfiguring a lot—

CJ (a) _ on land that is completely or partly within a public transport corridor, and the
total number of lots increases;

[1 (b) _ onland that is completely or partly within a future public transport corridor or
an aimort’s public safety area;

Li {c) _ onland that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

(Jd) _ for a residential purpose within the 25 ANEF contour for an airport,

C]{e) for a residential purpose resulting in 100 or more allotments.

L (ii) operational work assessable against the planning scheme, but not associated with a
material. change of use-mentioned in (i) above or reconfiguring a lot mentioned in (8)
above, on land that—

[1 (a) is completely or partly within a public transport corridor or a future public
transport corridor,
(J) (b) will result in work that encroaches into an airport's operational airspace.
LX] (iv) none of the above.

 

Railway safety and efficiency

For more information refer to Guide 23, schedule

8A of the IPA & schedule 2 af the IP Regulation.
Unies you answered “none of the above”, the
application triggers referral to QT asa
concurrence agency.

Moonie to Brisbane pipeline
Fot more information refer fo schedule 2of the P
Remlat

Unless you answered “none of the above”. the
application triggers referral to the hokder of
pipeline ficence No 1 issued under the Petrofeum
Act 1923. currently Santos QNT Pty Ld. for

advice.

 

23. The application involves: (tick the applicable box/es)—

(J () a material change of use assessable against the planning scheme for a purpose
mentioned in schedute 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

(1 (i) reconfiguring a tot—

(J (a) ontand that is completely or partly within a future public transport corridor,
future railway land or a raitway tunnel easernent,

(J (b) on land that is within 400m of a Citytrain passenger railway station or a future
Gitytrain passenger railway station, and the total site area is 5000m? or
greater;

C}{c} — ontand that abuts rail corridor Jand, commercial corridor land ar future railway
land, and the total number of lots increases;

{J {d) on tand that abuts rail corridor land, commercial corridor land or future Failway
‘and and an easement abutting the corridor or future railway land is created;

(Je) ontand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of tots increases;

(i (f) for a residential purpose resulting in 100 or more allotments.

(2) (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m%, on land that—

CJ (@) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;

(] (b) is completely or partly within future railway land, or a railway tunnel easement;

CJ (c) _ abuts reit conidor tand, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.

(iv) none of the above.

24. The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick ihe applicable box/es)—

(J (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring aot, and any structure or work will be located wholly or partly in the
easement

C1 Gi) reconfiguring a fot

C Gi) operational work assessable against the planning scheme, thatis filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

(iv) none of the above.

 

Page 8

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1014 - Op Works - Landscaping, Carparking, Access, Frontage [As Published].pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.