Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

07/1014 - Op Works - Landscaping, Carparking, Access, Frontage [As Published] · 142007.1014

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

wel

INTEGRATED PLANNING ACT 1997

State-controlied road matters -

For more information refer to Guide 3.

‘Unless you answered “none of the above” to G2,
fhe application triggers referral to the Depariment
of Main Roads (DMR) as a referral agency.

in certain circumstances DMR wif be an advice
agency, while in other circumstances DMR wit
be @ concurrence agency.

Schedule 2 of the 1 Requiation wil assist you to
determine where DMR 's an advice or
concurrence agency for the application.

IDAS Assessment Checklist, Version 20, 2 April 2007
2. The application involves: (tick applicable box/es)
(1 @) development on land contiguous* to a State controlled road and for -
CO (a) material change of use assessable against the planning scheme;
(1 (b) reconfiguring a fot unless -
« the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased;
C1 ©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)~
« associated with access to a State-controlled road; or
for filling or excavation, or
« involving the redirection or intensification of site stormwater from the land, through a

pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlied road.

C2 @i) development on tand not contiguous to a State-controlied road and -
1 (a) material change of use -
* assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;

C1 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.

(iii) none of the above

 

Clearing vegetation

 

 

g ; 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. C1 (i) material change of use -
nt ae eee 8, (a) assessable against the planning scheme;
Ree Natal Rescues ond Wate (b) on alot containing -
ifan agency other than NRW i the dssessrnent + acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRW is a ¢ if there is no property map of assessable vegetation for the lot - remnant vegetation;
canourTence agency forthe application in retation (c) where the existing use of the land is a rural or environmental use; and
yoked 9 you pation eis (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
‘eterral to NRW for assessment regardless Oi(ii) reconfiguring a fot -
whether vegetation clearing is proposed or not .
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of
. assessable vegetation or, if there is no property map of assessable vegetation for
@ . the lot, remnant vegetation;
. {b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smatler - comptete Part J of Form 1
(li) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
{b} not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 4
{1 (iv) _ none of the above.
~ Strategic port land | -|4. The application invotves:
For mote information refer to Guide 11, {1 (i) development on strategic port !and as defined in the Transport Infrastructure Act 1994 (TI
“Hyou ficked (j - the relevant Port Authority is the Act) - complete Part | of Form 1
assessment manager for the application.
Hyou ficked (i) Queenstarid Transport is a (I (i) a material change of use that is inconsistent with the tand use plan approved under the
‘concurrence agency for the application. Ti Act for the strategic port land - complete Part ! of Form 1

 

& (iii) Tone of the above

 

4 Land contiguous to a State-controfied road is defined in schedute 14 of the IP Regutation to mean lend - if part of the land is within 100m of the State-controlted road; or that is part of a future State-

controfed road,

Page 2

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1014 - Op Works - Landscaping, Carparking, Access, Frontage [As Published].pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.