Skip to the record
Accept no imitations.

Original source · versioned page text

ASTP_Town _Planning_Rpt

of 29

Page text shows just the words. Original shows the document exactly as it was published.

      types to enter and exit the site in forward gear (including AV) as demonstrated by the vehicle
      maneuvering diagrams on sheets C11 and C12 of Appendix 4.

33.   As detailed in Table 2 above, the proposed development has provided a compliant vehicle parking
      outcome with 34 car parks, 8 motorcycle bays and 10 bicycle spaces provided onsite to accommodate
      the demand generated by the proposed land uses.


3.7   Stormwater Management
34.   Please refer to the Civil Engineering Plans prepared by Ingeniir in Appendix 4 and the Stormwater
      Management Plan prepared by Ingeniir in Appendix 5. The development proposes to use on site bio-
      retention to satisfy water quality requirements. Further, the development achieves effective non-
      worsening of peak stormwater discharge rates.




  ASTP Ref: 240806                                                                           Page 14 of 29
Log in to download the original file

ASTP_Town _Planning_Rpt.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.