SUPERSEDED - Decision Notice - Approved by Delegation of Authority RAL21 0014

of 1

Page text shows just the words. Original shows the document exactly as it was published.

Officer: 	Lisa Pienaar
Direct Telephone: 	07 53296514
Our Reference:	RAL21/0014 & DBW21/0127
Your Reference:	04/1730
14 March 2022
KL Mayne & KE Mayne
C/- Max Watterson & Associates
PO Box 639
COOROY  QLD  4563
[email protected]
Dear Sir,Madam,
Decision Notice
Planning Act 2016
I refer to your application and advise that on 9 March 2022, Council decided to approve the application, subject to conditions.
Details of the decision are as follows:
application details
Application No:	RAL21/0014 & DBW21/0127
Street address:	13 Rectory St Pomona Qld 4568
Real property description:	Lot 11 RP 43995, Lot 12 RP 43995
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
Decision details
Council decided to issue the following type of approval:
Development Permit for Reconfiguring a Lot - Boundary Realignment
Development Permit for Building Works (Heritage)
CURRENCY PERIOD of approval
The currency period for this development approval is stated in the conditions below.
assessment manager conditions
PLANNING
When Conditions must be Complied With
Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
04-1730AC	-	Plan of Proposed Reconfiguration of Lots 11 & 12 on RP43995, prepared by Max Watterson & Associates	17/06/2021
A.01	06	Site Plan, prepared by Antoniajayne Design	18/02/2022
A.03	08	First Floor/Existing / Demolition Plan, prepared by Antoniajayne Design	18/02/2022
A.04	06	Exist/Demo Elevations, prepared by Antoniajayne Design	18/02/2022
A.05	06	Proposed Ground Floor Plan, prepared by Antoniajayne Design	18/02/2022
A.06	06	Proposed Floor Plan Upper, prepared by Antoniajayne Design	18/02/2022
A.07	06	Elevations 1, prepared by Antoniajayne Design	18/02/2022
A.08	06	Elevations 2, prepared by Antoniajayne Design	18/02/2022
A.10	06	Roof Plan, prepared by Antoniajayne Design	18/02/2022
A.11	06	Street Elevations, prepared by Antoniajayne Design	18/02/2022
All lot numbering on the subdivision plan to be submitted to Council for compliance assessment must remain as shown on the Approved Plans.
Performance Bond
Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions.
Building Height
The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground surface.
Currency Period – Reconfiguring a Lot
This development approval lapses if the requirements of the conditions have not been completed and an application for plan seal is not lodged with Council by 9 March 2026, unless an application to extend the currency period is approved by Council.

Currency Period – Building Works
The Currency Period for this development approval lapses if all conditions have not been complied with by 9 March 2026, unless an application to extend the currency period is approved by Council.
Landscaping
Existing trees on the site must be retained.
Trees to be retained must be protected from clearing or construction activities by:
clearly marking vegetation to be retained with flagging tape
installing protective fencing around the drip line of the vegetation
restricting stockpiling, storage and vehicle parking to those areas which are already cleared
using low impact construction techniques around vegetation.
Heritage
The dwelling must be constructed as per the design and materials as shown on the approved plans and reflect the character of Pomona.
The dwelling must have a colour palette of neutral or muted shades (a main colour plus 1-2 trim/highlight colours are sufficient) and avoid bright or garish colours that are not in keeping with the character of Pomona.
Property Access and Driveways
A residential driveway must be constructed to Lots 11 & 12 in their Rectory Street frontage. The driveways must be constructed as part of the any subsequent building approval on the lots. The driveway must be:
constructed in accordance with Council’s standard drawing RS-056 and any associated addendum:
be located to preserve existing vegetation in the road reserve.
The following property notation or similar will be added to Council’s rates records to advise Private Certifiers, owners and prospective purchasers of the requirements regarding the driveways:
“Private Certifiers, owners and prospective purchasers are notified that special access requirements apply to this parcel of land. Contact Council's Planning Department for Details.”
Boundary Encroachments
Certification must be submitted to Council from a Licensed Surveyor which certifies that:
the setback/s to any new boundaries for any existing buildings remaining on the site comply with the relevant provisions of the planning scheme and the Building Act 1975, unless varied by this Decision Notice;
all constructed access and roadworks (including associated fill batters and retaining walls) are fully contained within a dedicated reserve or registered easement;
all utility services and connections (eg. electricity, telecommunications, water, sewerage) are wholly located within the lot they serve or alternatively included within an easement;
all retaining walls and structures are fully contained within the lot they retain;
any fill, including fill batters, are wholly contained within the subject site and not on adjacent properties.
Stormwater Drainage
Stormwater runoff from the development must be controlled on-site and discharged to Council’s drainage system in Rectory Street. The discharge must not cause scour or damage to the subject site or the road reserve or impact on vegetation in the road reserve.
The following property notation or similar will be added to Council’s rates records to advise Private Certifiers, owners and prospective purchasers of the requirements regarding stormwater disposal:
“Private Certifiers, owners and prospective purchasers are notified that special stormwater requirements apply to this parcel of land. Contact Council's Planning Department for Details”
Services
Sewer reticulation must be provided to each lot in accordance with the standards and requirements of the relevant service provider.
Reticulated electricity and telecommunication services must be provided to each lot in accordance with the standards and requirements of the relevant service provider.
Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications.
Certification must be submitted to Council from all relevant service providers (Energex, NBN and Unitywater) which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction.
Easements
Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property.
All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
referral agencies
Not applicable.

Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
Infrastructure Charges
All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-development/development-tools-guidelines/infrastructure-charges
Equitable Access and Facilities
The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities.  Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work:
the Disability Discrimination Act 1992 (Commonwealth);
the Anti-Discrimination Act 1991 (Queensland); and
the Disability (Access to Premises – Buildings) Standards.
Property Driveway and Vehicle Crossover
The planning scheme declares Operational Work for the construction of a driveway and vehicle crossover to the property to be self-assessable against the Low Density Housing Code. A self-assessable application is required to be submitted to Council for the vehicle crossover (*link below) OR if the proposed driveway and vehicle crossover does not comply with each Acceptable Solution contained in the Code, a Development Permit for the work is required to be obtained from Council.
*http://www.noosa.qld.gov.au/documents/40217326/40415739/Vehicle%20Crossover%20Application%20Pack.pdf
Sustainability
In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable building design for residential and commercial development. Council encourages the use of sustainable building materials, energy efficient fittings, solar hot water, photovoltaic systems (including the use of inverter/charges), water saving devices and rainwater harvesting. For further information go to http://www.noosa.qld.gov.au/sustainable-homes
property notes
RAL21/0014 - Property Access Driveway
The following notation applies to approved lots 11 & 12:
Private Certifiers, owners and prospective purchasers are notified that special access requirements apply to this parcel of land. Contact Council's Planning Department for details.
RAL21/0014 - Stormwater
The following notation applies to approved lots 11 & 12:
Private Certifiers, owners and prospective purchasers are notified that special stormwater requirements apply to this parcel of land. Contact Council's Planning Department for details.
VARIATION approval details
Not applicable.
further development permits required
Type of Development Permit Required	Subject of the required Development Permit
Development Permit for Building Works	All building work (including concurrence agency referral for rebuilding/resiting)
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

Yours faithfully,

Lisa Pienaar
Development Planner

Enc:	Appeal Rights
Approved Plans/Documents

	Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017

Chapter 6 Dispute resolution
Part 1 Appeal rights
229 Appeals to tribunal or P&E Court
(1)	Schedule 1 of the Planning Act 2016 states –
(a)	Matters that may be appealed to –
(i)	either a tribunal or the P&E Court; or
(ii)	only a tribunal; or
(iii)	only the P&E Court; and
(b)	The person-
(i)	who may appeal a matter (the appellant); and
(ii)	who is a respondent in an appeal of the matter; and
(iii)	who is a co-respondent in an appeal of the matter; and
(iv)	who may elect to be a co-respondent in an appeal of the matter.
(2)	An appellant may start an appeal within the appeal period.
(3)	The appeal period is –
(a)	for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or
(b)	for an appeal against a deemed refusal – at any time after the deemed refusal happens; or
(c)	for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or
(d)	for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or
(e)	for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or
(f)	for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person.
Note –
See the P&E Court Act for the court’s power to extend the appeal period.
(4)	Each respondent and co-respondent for an appeal may be heard in the appeal.
(5)	If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal.
(6)	To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about-
(a)	the adopted charge itself; or
(b)	for a decision about an offset or refund-
(i)	the establishment cost of trunk infrastructure identified in a LGIP; or
(ii)	the cost of infrastructure decided using the method included in the local government’s charges resolution.
230 Notice of appeal
(1)	An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that-
(a)	is in the approved form; and
(b)	succinctly states the grounds of the appeal.
(2)	The notice of appeal must be accompanied by the required fee.
(3)	The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to –
(a)	the respondent for the appeal; and
(b)	each co-respondent for the appeal; and
(c)	for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and
(d)	for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and
(e)	each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and
(f)	for an appeal to the P&E Court – the chief executive; and
(g)	for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate.
(4)	The service period is –
(a)	if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or
(b)	otherwise – 10 business days after the appeal is started.
(5)	A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6).
(6)	A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person.
231 Other appeals
(1)	Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable.
(2)	The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error.
(3)	A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter.
(4)	In this section –
decision includes-
(a)	conduct engaged in for the purpose of making a decision; and
(b)	other conduct that relates to the making of a decision; and
(c)	the making of a decision or failure to make a decision; and
(d)	a purported decision; and
(e)	a deemed refusal.
non-appealable, for a decision or matter, means the decision or matter-
(a)	is final and conclusive; and
(b)	may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and
(c)	is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground.
232 Rules of the P&E Court
(1)	A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal.
(2)	However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court

[word/footer1.xml]
Page 2 of 7

[word/footer2.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 7

[Attachment: image3.png (image text)]
ee) NOOSA COUNCIL
Log in to download the original file

SUPERSEDED - Decision Notice - Approved by Delegation of Authority RAL21 0014.docx · 328 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.