                                                                                                                 NOTES - GENERAL
                                                                                                                 1. LOCAL AUTHORITY REQUIREMENTS                                       8.      LAWN AREAS - IF APPLICABLE
                                                                                                                 Unless specified or detailed with this set of Landscape               Cultivate existing subgrade to a depth of 150mm, place 100mm
                                                                                                                 drawings works are to be to Local Authority details and               of topsoil as specified, and lay 25mm thick turf rolls as
                                                                                                                 requirements.                                                         specified. Ensure flush to adjacent pathways.

                                                                                                                 2. DRAINAGE                                                           9.      IRRIGATION
                                                                                                                 Refer to relevant architects drawings for storm water drainage        Irrigation to be provided at clients discretion and threfore has
                                                                                                                 requirements. Refer to architects drawings for the lcoation of        not been provided as part of this landscape plan.
                                                                                                                 hardscape items including walls and barriers.
                                                                                                                                                                                       10.         ESTABLISHMENT AND MAINTENANCE
                                                                                                                 3. FALLS, LEVELS AND GRADING                                          WORKS
                                                                                                                 Grade all planting areas evenly. Ponding is unacceptable.             Period Commencement: The planting establishment period
                                                                                                                                                                                       includes 12 weeks and commences at the date of practical
                                                                                                                 Final surface levels to be verified on site. Refer architects         completion.
                                                                                                                 drawings for levels on road surfaces, pits, gullies etc.
                                                                                                                                                                                       General: Throughout the planting establishment period, carry
                                                                                                                 Unless noted otherwise on plan, surrounding maximum grades            out maintenance work including, watering, mowing, weeding,
                                                                                                                 should be 1:4 for planting beds, and 1:6 for turf areas.              rubbish removal, fertilising, pest and disease control,
                                                                                                                                                                                       reseeding, returfing, staking and tying, replanting, cultivating,
                                                                                                                 4. PLANTING SELECTION                                                 pruning, hedge clipping, aerating, reinstatement of mulch,
                                                                                                                 Refer to plant schedule for plant selection and to plans for the      renovating, top dressing, and keeping the site neat and tidy.
                                                                                                                 locations softscape species.
                                                                                                                 Plants have been selected based on the local environment,
                                                                                                                 planting pallet present within Castaways Beach and existing           Fertilising
                                                                                          SITE AREA              stock available from commercial nurseries.                            Fertilise planting areas as required to achieve healthy growth.

                                                                                                                 4.1 Fertiliser to planting areas:
                                                                                                                 Install Agriform 10gm Slow Release Tablets to all plants              Mulch
                                                                                                                 under 45Ltr at planting as per the Manufacturer's instructions. .     Maintain in a clean and tidy condition and reinstate mulch to
                                                                                                                 Use Dynamic Lifter or equivalent through topsoil as per               required depth as specified in Schedules - Finishes.
                                                                                                                 manufacturer's recommendations. Apply a general organic               Keep away from tree trunks and the base of all plants. Allow to
                                                                                                                 fertiliser to all plants. Fertilisers containing phosphorous must     top up at the end of the Establishment Period.
                                                                                                                 not be used on Banksia, Grevillea, Hakea, Telopea,
                                                                                                                 Hardenbergia, Proteas, Alyogyne and Phebalium species.
                                                                                                                                                                                       Pest and disease control
                                                                                                                 4.2     SH - Sun hardened                                             Apply chemicals and follow manufacturer's instructions. Record
                                                                                                                 It is the contractors responsibility to ensure all plants are sun     in establishment log.
                                                                                                                 hardened to the sites climatic conditions.

                                                                                                                 5.     PLANTING AREAS (PA)                                            Pruning of trees and shrubs
                                                                                                                 Cultivate to 150mm depth and place 300mm topsoil, as                  Remove broken or dead branches, maintain natural habit of
                                                                                                                 specified. Place 100mm layer of organic mulch, as specified.          tree. Lightly prune all shrubs halfway through and at the end of
                                                                                                                                                                                       the Establishment Period.
                                                                                                                 Mulch
                                                                                                                  (a) Blanket mulch all areas indicated as revegetation with a
                                                                                                                      minimum of 100mm deep hoop pine mulch or as                      Replacements
                                                                                                                       approved.                                                       Plants: Continue to replace failed, damaged or stolen plants.
                                                                                                                  (b) No soil laden tub grindings will be allowed to be used as        Replace all plants that are dying or have died during the
                                                                                                                      mulch.                                                           establishment period. This is to be done progressively so that
                                                                                                                  (c) Soil laden tub grindings may only be used as an additive         plant numbers match construction drawing numbers at the end
                                                                                                                       to site topsoil used in revegetation areas.                     of establishment period.

                                                                                                                 6.     ROCK PLACEMENT
                                                                                                                                                                                       Watering


KEY PLAN - NTS
                                                                                                                 Refer to plans for the indicative location of feature rocks to be
                                                                                                                 used to naturalise garden areas. Rock placement and                   Water sufficiently to ensure healthy turf and plant growth.
                                                                                                                 specification subject to clients discretion.                          Maintain irrigation system where installed.
                                                                                                                                                                                       It is anticipated that 15 waters will occur in the initial 12 week
                                                                                                                 7.     EQUITABLE ACCESS                                               establishment period. Watering will occur over the whole site
                                                                                                                 All pathways are to have maximum cross-falls of 1:40.                 and will be sufficient to ensure satisfactory establishment of all
                                                                                                                 Handrails and pathways to comply with AS1428.1.                       plants.
                                                                                                                                                                                       The timing of the 15 waters will be the contractor's
                                                                                                                                                                                       responsibility.




PLANT SCHEDULE - REFER LP02




                                                                                                                                                                                                                                                                                                                  LIST OF ASSOCIATED DRAWINGS
                                                                                                                                                                                                                                                                                                                  SHEET:                            DESCRIPTION:
                                                                                                                                                                                                                                                                                                                  LP01                              COVER SHEET/ KEY PLAN




9 NOOSA DUNES - LANDSCAPE PLANS PACKAGE
                                                                                                                                                                                                                                                                                                                  LP02                              LANDSCAPE PLAN



                                                                                                                                                                                                                                                                                                                  CERTIFICATION:
                                                                                                                                                                                                                                                                                                                  REGISTERED LANDSCAPE ARCHITECT:                    DATE:



                                                                                                                                                                                                                                                                                                                  RYAN CAIRNEY - 3182                                02/01/2021


                                                                  PROJECT TITLE:                       CLIENT:                                                                                                      TITLE:                                                                                        JOB:                      PLAN:      REV:        NORTH:

                        PO Box 9566 Pacific Paradise, Qld, 4564
                                               P: 07 5450 5984
                                                                  9 NOOSA DUNES                        RICHARD AND JENNY FIDDIS                                  C
                                                                                                                                                                 B
                                                                                                                                                                        FOR APPROVAL
                                                                                                                                                                        FOR APPROVAL
                                                                                                                                                                                          20-04-2021
                                                                                                                                                                                          19-02-2021
                                                                                                                                                                                                       RC
                                                                                                                                                                                                       RC
                                                                                                                                                                                                            JL
                                                                                                                                                                                                            JL
                                                                                                                                                                                                                    LANDSCAPE PLAN                                                                                J000784                   LP01        C
                                          ABN: 60 625 108 625
                                                                  512 DAVID LOW WAY, CASTAWAYS BEACH                                                             A      PRELIMINARY       17-02-2021   RC   JL
                                                                                                                                                                                                                    COPYRIGHT © 2021 NCES. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY
                                                                                                                                                                                                                                                                                                                  SCALE:                    NTS @ A1
                                                                                                                                                                                                                    MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF NCES.
                                                                                                                                                                 ISSUE DETAILS            DATE         INIT CHK'D

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Att 1 - Amended Landscaping Plans.pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.