NOTES - GENERAL
1. LOCAL AUTHORITY REQUIREMENTS 8. LAWN AREAS - IF APPLICABLE
Unless specified or detailed with this set of Landscape Cultivate existing subgrade to a depth of 150mm, place 100mm
drawings works are to be to Local Authority details and of topsoil as specified, and lay 25mm thick turf rolls as
requirements. specified. Ensure flush to adjacent pathways.
2. DRAINAGE 9. IRRIGATION
Refer to relevant architects drawings for storm water drainage Irrigation to be provided at clients discretion and threfore has
requirements. Refer to architects drawings for the lcoation of not been provided as part of this landscape plan.
hardscape items including walls and barriers.
10. ESTABLISHMENT AND MAINTENANCE
3. FALLS, LEVELS AND GRADING WORKS
Grade all planting areas evenly. Ponding is unacceptable. Period Commencement: The planting establishment period
includes 12 weeks and commences at the date of practical
Final surface levels to be verified on site. Refer architects completion.
drawings for levels on road surfaces, pits, gullies etc.
General: Throughout the planting establishment period, carry
Unless noted otherwise on plan, surrounding maximum grades out maintenance work including, watering, mowing, weeding,
should be 1:4 for planting beds, and 1:6 for turf areas. rubbish removal, fertilising, pest and disease control,
reseeding, returfing, staking and tying, replanting, cultivating,
4. PLANTING SELECTION pruning, hedge clipping, aerating, reinstatement of mulch,
Refer to plant schedule for plant selection and to plans for the renovating, top dressing, and keeping the site neat and tidy.
locations softscape species.
Plants have been selected based on the local environment,
planting pallet present within Castaways Beach and existing Fertilising
SITE AREA stock available from commercial nurseries. Fertilise planting areas as required to achieve healthy growth.
4.1 Fertiliser to planting areas:
Install Agriform 10gm Slow Release Tablets to all plants Mulch
under 45Ltr at planting as per the Manufacturer's instructions. . Maintain in a clean and tidy condition and reinstate mulch to
Use Dynamic Lifter or equivalent through topsoil as per required depth as specified in Schedules - Finishes.
manufacturer's recommendations. Apply a general organic Keep away from tree trunks and the base of all plants. Allow to
fertiliser to all plants. Fertilisers containing phosphorous must top up at the end of the Establishment Period.
not be used on Banksia, Grevillea, Hakea, Telopea,
Hardenbergia, Proteas, Alyogyne and Phebalium species.
Pest and disease control
4.2 SH - Sun hardened Apply chemicals and follow manufacturer's instructions. Record
It is the contractors responsibility to ensure all plants are sun in establishment log.
hardened to the sites climatic conditions.
5. PLANTING AREAS (PA) Pruning of trees and shrubs
Cultivate to 150mm depth and place 300mm topsoil, as Remove broken or dead branches, maintain natural habit of
specified. Place 100mm layer of organic mulch, as specified. tree. Lightly prune all shrubs halfway through and at the end of
the Establishment Period.
Mulch
(a) Blanket mulch all areas indicated as revegetation with a
minimum of 100mm deep hoop pine mulch or as Replacements
approved. Plants: Continue to replace failed, damaged or stolen plants.
(b) No soil laden tub grindings will be allowed to be used as Replace all plants that are dying or have died during the
mulch. establishment period. This is to be done progressively so that
(c) Soil laden tub grindings may only be used as an additive plant numbers match construction drawing numbers at the end
to site topsoil used in revegetation areas. of establishment period.
6. ROCK PLACEMENT
Watering
KEY PLAN - NTS
Refer to plans for the indicative location of feature rocks to be
used to naturalise garden areas. Rock placement and Water sufficiently to ensure healthy turf and plant growth.
specification subject to clients discretion. Maintain irrigation system where installed.
It is anticipated that 15 waters will occur in the initial 12 week
7. EQUITABLE ACCESS establishment period. Watering will occur over the whole site
All pathways are to have maximum cross-falls of 1:40. and will be sufficient to ensure satisfactory establishment of all
Handrails and pathways to comply with AS1428.1. plants.
The timing of the 15 waters will be the contractor's
responsibility.
PLANT SCHEDULE - REFER LP02
LIST OF ASSOCIATED DRAWINGS
SHEET: DESCRIPTION:
LP01 COVER SHEET/ KEY PLAN
9 NOOSA DUNES - LANDSCAPE PLANS PACKAGE
LP02 LANDSCAPE PLAN
CERTIFICATION:
REGISTERED LANDSCAPE ARCHITECT: DATE:
RYAN CAIRNEY - 3182 02/01/2021
PROJECT TITLE: CLIENT: TITLE: JOB: PLAN: REV: NORTH:
PO Box 9566 Pacific Paradise, Qld, 4564
P: 07 5450 5984
9 NOOSA DUNES RICHARD AND JENNY FIDDIS C
B
FOR APPROVAL
FOR APPROVAL
20-04-2021
19-02-2021
RC
RC
JL
JL
LANDSCAPE PLAN J000784 LP01 C
ABN: 60 625 108 625
512 DAVID LOW WAY, CASTAWAYS BEACH A PRELIMINARY 17-02-2021 RC JL
COPYRIGHT © 2021 NCES. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY
SCALE: NTS @ A1
MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF NCES.
ISSUE DETAILS DATE INIT CHK'D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 1 - Amended Landscaping Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.