Council archive · source document
Decision Letter - Change to an Existing Approval - 010.2006.00000138.002 [As Published] · 132006.138.02
Officer: Jack Lewis
Direct Telephone: (07) 5449 5183
Response Address: Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Email: [email protected]
Our Reference: 2006/138
Your Reference: 290509
11 August 2009
Robert G Utz
PO Box 934
NOOSA HEADS QLD 4567
Dear Sir
Change to an Existing Approval
Integrated Planning Act 1997
I refer to your request to make a change to an existing approval. On 6 August 2009 Council decided
your requested changes.
Details of the decision with the consolidated conditions are as follows:
1 APPLICATION DETAILS
Application No: 2006/138
Street address: 18 Weyba Street, Sunshine Beach
Real property description: Lot 75 RP 48113
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
Council on 12 July 2006 decided to issue the following type of approval:-
Development Permit for Material Change of Use – Duplex Dwelling
In relation to the request to make a change to the existing approval, Council on 6 August 2009
decided to:
A. Approve a change to the development approval with changes to Conditions 1 & 15
B. Delete Conditions 28, 29 & 40
C. Approve a change to Advice Condition 1
D. Issue a Change to Development Approval
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
Page 1 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 16 pages
Page 2
2006/138
4 ASSESSMENT MANAGER CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and may
be amended by these conditions.
Plan No. Rev. Plan / Document Name Date
0525.01A Basement Level Plan – Kidd & Co Nov 2005
0525.02A Ground Floor Plan – Kidd & Co Nov 2005
0525.03A 27 July 2009 Upper Level Plan – Kidd & Co Nov 2005
0525.04A 27 July 2009 Roof terrace Plan – Kidd & Co Nov 2005
0525.05A 27 July 2009 Elevations 1 – Kidd & Co Nov 2005
0525.06A 27 July 2009 Elevations 2 – Kidd & Co Nov 2005
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to
the premises being occupied and maintained at all times thereafter. The Landscaping Plan
shall include:-
3.1. the existing Lilly Pilly’s located along the property’s rear boundary shall be retained;
3.2. screening vegetation in the form of native trees and understorey plantings along the
side (with the exception of the bench seats along the side boundaries for a length of 4.5
metres) and rear boundaries of the site to ensure visual screening for the privacy of the
adjoining sites.
4. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use.
5. Any fencing provided in conjunction with the development shall not exceed a maximum height
of 2 metres above natural ground level and be setback at least 1 metre from the front property
boundary, with at least half of the fencing setback 2 metres. The area of land between the
fence and the front property boundary shall be densely landscaped to screen any fencing from
the street.
6. The dividing wall/fence between the two dwelling units at the rear of the site adjacent to the
swimming pools and landscaped courts shall not exceed 2 metres in height above natural
ground level.
7. The bench seat structure shall not exceed a maximum of 2 metres above natural ground level.
8. Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
thus remaining as open structures.
9. The development shall not exceed a maximum height of 2 storeys and 8 metres above natural
and finished ground level.
10. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the maximum
allowable building height as required by either the conditions of approval or the Planning
Scheme.
Page 2 of 17
Page 3
2006/138
11. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
12. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
13. Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
14. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
15. The Development Permit for a material change of use of premises lapses if the use has not
happened by 12 July 2013, unless an application to extend the currency is approved by
Council.
16. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
Building Services
17. Fencing to the swimming pool must comply with the Queensland Building Act 1975 Part 3 (as
amended) and Part 5 of Standard Building Regulation 1993 in all respects. Direct access from
the dwelling to the pool enclosure is not permitted.
Land Development
Vehicle Access
18. A vehicular access driveway to serve the property shall be constructed from the Weyba Street
frontage of the site generally in accordance with the Driveway Centre Profile on Drawing No
16078-OW1 dated January 2006 by SCG Consulting Engineers, except as modified herein.
19. The driveway together with the footpath shall be designed by qualified engineer and
constructed to Council’s design standards and to grades that prevent vehicles from scraping
and/or bottoming whilst also allowing pedestrians movements along the footpath without any
level difference. Should any driveways be constructed to grades that do not comply with
AS2890.1-2004, Council will require that the driveway be removed and reconstructed to levels
that do comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
to have the footpath continue at a constant grade to minimise the potential for pedestrians to
trip or fall.
Carparking
20. Carparking shall be provided within the site generally as shown on Drawing No 0525.01 (A)
dated November 2005 prepared by KIDD & Co, except as modified herein.
21. A minimum of 4 covered carpark spaces shall be provided on site.
22. The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for
user class 1A with allowance for vehicles to enter and leave the site in a forward gear and with
a minimum head clearance (headroom) at any point of 2.2m.
Page 3 of 17
Page 4
2006/138
23. The proposed turning area at the entry of the proposed carpark shall be sign posted to
indicate that the area is a “Turning Area Only” and that “No Parking is Permitted”.
24. All vehicles shall enter and leave the site in a forward direction.
Frontage Works
25. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
frontage of the site in accordance with Planning Scheme Policy PSP1 Landscaping
Guidelines. Grass shall be couch, free of weeds.
26. A new 1.5m wide concrete path shall be constructed along the Weyba Street frontage of the
site in accordance with Council’s design standards and to an alignment that protects any
significant vegetation or any underground services.
27. Where applicable, all redundant vehicular crossings to the site shall be removed and replaced
by kerb & channel, footpath paving and landscaping such as trees and grasses in accordance
with Council’s Standard specifications prior to commencement of the use permitted by this
permit.
Pathway Contributions
28. Deleted
Park Contributions
29. Deleted
Stormwater Drainage
30. All roof runoff from any new dwelling shall be directed to individual rainwater storage system
or tank (minimum storage 3000 litres per dwelling unit) that is installed to ensure water from
the tank can be used for external uses (such as watering gardens, irrigation, ornamental
ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for use in
flushing of toilets internal to the dwelling. All rainwater tanks are to be designed and installed
in accordance with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks,
and shall be part of the plumbing application in conjunction with the building approval. The
location and capacity of the tanks shall be clearly shown on the plans submitted for Building
Works approval.
31. All stormwater overflows from the water tank/s and stormwater runoff from paved areas
(excluding underground parking area and the internal access driveway) shall be collected on
site and discharged to Council’s kerb & channel street drainage system in Weyba Street.
Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer
and submitted to Council prior to obtaining a Development Permit for Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
drainage system at any one location is 25 litres/second.
32. The applicant shall ensure that the development will not adversely affect the existing drainage
conditions on adjoining properties and that no additional runoff from the site is discharged onto
these properties due to this development. The stormwater runoff from roof and outdoor
paved areas for all storms up to and including 100 years storm event are directed (by pipes or
overland flow paths) to Weyba Street.
33. An infiltration pit for the drainage of the access driveway and the underground carpark shall be
designed generally in accordance with Drawing No 16078-OW1 dated January 2006 by SCG
Consulting Engineers and certified by a registered geotechnical engineer ensuring the
proposed infiltration pit will not cause any adverse impact or nuisance seepage to other
properties. A Development Permit for Operational Works shall be required.
34. All site stormwater drainage shall be by means of a gravity system.
Page 4 of 17
Page 5
2006/138
Sewer Mains
35. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
36. The existing sewer main that traverses the rear of the site and the ‘zone of influence’ (taken as
the area within a 45-degree angle measured from the invert of the sewer main to the finished
surface level) shall be accurately located and determined by a licensed Surveyor and shown
on all plans submitted for Operational Works approval.
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
risk of damage no structures requiring a building permit (eg. swimming pools, dividing walls
exceeding 1m in height, etc) shall be constructed within this ‘zone of influence’ and as such
the applicant shall ensure the Operational Works plans and Building plans are in compliance
with this requirement (in particular the location of the swimming pool may need to be revised).
37. A registered easement shall be created over the zone of influence of all sewers within the
subject site and over those parts of the subject site that are impacted upon by sewers on any
adjoining sites. The easements shall generally be parallel to and centred over the sewer main
and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
within the allotment (measured from the finished surface) and not less than 3.0m wide. In this
regard a licensed surveyor shall accurately locate all sewer mains and determine the
necessary width of the easement, which shall be shown on all plans submitted for Operational
Works / Building Works approval. To this extent the surveyor shall certify that the sewer and
the zone of influence is wholly contained within the easement to be created.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
Town Water Supply
38. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
39. Each water connection to the water reticulation system shall extend to the property boundary
and be metered. Each individual unit shall be provided with its own water meter. All fees for
the supply of water meters shall be paid to the Council.
Headworks Contributions
40. Deleted
Earthworks and Site Stability
41. Any filling works required on site shall be carried out in accordance with Section 3.8 of
Council’s Engineering Design Standards Manual and so as not to cause the additional
ponding of water on any adjoining lands. Details and depth of filling works must be provided
with the application for a Development Permit for Operational Works.
42. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
any fences to be replaced shall be clearly shown on the plans submitted for Operational
Works approval.
Page 5 of 17
Page 6
2006/138
43. All earthworks, foundation works and earthworks equipment used on the site shall take into
consideration the recommendations and the findings provided in the geotechnical report (site
investigation report No 15078 (S)) by SCG Consulting Engineers dated 31 March 2006.
44. A Geotechnical Engineer or similar qualified expert shall inspect the site and establish whether
any measures are required to protect the stability of adjoining buildings and/or structures, and
shall inspect the excavations to confirm the founding soil material and that the methods of
construction recommended in the geotechnical report No 16078 (S) dated 31 March 2006 and
the engineering drawing No 16078-OW1 dated January 2006 by SCG Consulting Engineers
are appropriate to the site. Copies of all inspection reports are to be submitted to Council to be
kept on the file of the Development Permit for Operational Works.
45. An existing Conditions Survey is to be carried out on adjoining structures, fences and
landscaping prior to any construction works taking place on site. If distress already exists, a
photographic survey shall be undertaken, the distress measured and a plan to monitor
changes to distress shall be implemented. A copy of this report is to be submitted to Council
within 5 business days of survey and prior to construction work proceeding.
Erosion and Sediment Control
46. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
General
47. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
48. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
49. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Environmental Health
50. Noise emission from swimming pool and spa equipment (including heating equipment) shall
comply with the following requirements:
50.1. The equipment shall be installed and located in a manner that prevents excessive noise
in accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement
Notices (on-the-spot fines) may apply for offences.
50.2. A person must not use equipment on any day if it makes or causes noise to be made –
50.2.1. From 10pm to 7am: Which is audible outside the most exposed part of an
affected building
50.2.2. From 7am to 7pm: More than the lower of either –
50 dB(A)
5 dB(A) above the background noise level
50.2.3. From 7pm to 10pm: More than 3 dB(A) above the background noise level.
51. Noise emission from air conditioning equipment shall comply with the following requirements:
Page 6 of 17
Page 7
2006/138
51.1. The equipment shall be installed and located in a manner that prevents excessive noise
in accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement
Notices (on-the-spot fines) may apply for offences.
51.2. Submission of written certification from a suitably qualified person confirming that the
noise levels comply when measured at either the residential boundary or outside the
most exposed part of an affected building, whichever is the closest to the equipment.
This is required immediately after installation of the equipment and prior to any
occupation of the building, and in a format approved by Council.
51.3. A person must not use equipment on any day if it makes or causes noise to be made –
51.3.1. From 10pm to 7am: More than the lower of either –
40 dB(A)
3 dB(A) above the background noise level
51.3.2. From 7am to 7pm: More than the lower of either –
50 dB(A)
5 dB(A) above the background noise level
51.3.3. From 7pm to 10pm: More than 3 dB(A) above the background noise level.
52. Noise from building works associated with residential development shall comply with the
following –
52.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
52.2. All reasonable measures are taken to minimise noise emissions.
52.3. Not permitted on Sunday or public holidays
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Agency Address Basis
Environmental GPO Box 2771 BRISBANE QLD 4001 Concurrence
Protection Agency
A copy of any referral agency conditions is attached.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan No. Rev. Plan / Document Name Date
0525.01A Basement Level Plan – Kidd & Co Nov 2005
0525.02A Ground Floor Plan – Kidd & Co Nov 2005
0525.03A 27 July 2009 Upper Level Plan – Kidd & Co Nov 2005
0525.04A 27 July 2009 Roof terrace Plan – Kidd & Co Nov 2005
Page 7 of 17
Page 8
2006/138
0525.05A 27 July 2009 Elevations 1 – Kidd & Co Nov 2005
0525.06A 27 July 2009 Elevations 2 – Kidd & Co Nov 2005
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The applicant is advised that development contributions and infrastructure charges applicable
to this development approval have been based on the following Uses Class/ Uses and
applicable quantities:-
Existing Development Approved Development
Existing Use Class / Approved Use Approved
Existing Quantity
Use Class / Use Quantity
Multiple Housing 2 x 2 bedroom Multiple Housing 2 x 2 bedroom
Type 2 - Duplex units Type 2 - Duplex units
2. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
3. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
the cost of operational works exceeds $80,000, then a portable long service leave levy is
required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
the approved form issued by the Building and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
declaration outlining the cost of the operational works must be submitted to Council with the
lodgement of any application for operational works over the site.
4. Prior to the commencement of the development, a plumbing assessment must be obtained
from Noosa Council’s Plumbing Services Section in accordance with the Plumbing & Drainage
Act 2002 (as applicable).
5. This proposal has not been assessed in relation to the spread of fire between properties /
buildings. It is the building certifiers responsibility to assess the requirements for fire services,
fire separation and appropriate methods of construction as part of the building works approval
process. Referral to the Queensland Fire and Rescue Service (QFRS) may be required as
part of the Building Approval process.
6. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed
where it could reasonably be expected to move into a roadside gutter, storm water drain or a
watercourse. On the spot fines apply for such offences.
7. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
7.1. On a Sunday or public holiday, at any time; or
7.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
Page 8 of 17
Page 9
2006/138
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development
Permit
Development Permit for Building Works All building works
Development Permit for Operational Works Landscaping, Car parking, Access, Frontage
Works, Stormwater Drainage and Infiltration
Pit and Site Civil Works
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Nil
12 SUBMISSIONS
No submissions were received
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Page 9 of 17
Page 10
2006/138
Decision Notice History
12 July 2006 - Original Decision Notice.
6 August 2009 - Approve a change to Conditions with amendments to
Conditions 1 & 15. Delete Conditions 28, 29 & 40. Approve
a change to Advice Condition 1.
Yours faithfully,
Denis Wallace
Senior Development Planner
Page 10 of 17
Page 11
2006/138
Referral Agency Conditions
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
<
Page 11 of 17
Page 12
2006/138 Page 12 of 17 [OCR of page images] 2006/138 Postal address: Telephone: 3224 S644 EPA po.: Application no.: Property Description: Property Location: Signed Mark Paton Chief Scientific Advisor Ce: R Utz & § Clague PO Box 2771, BRISBANE QLD 4001 Fax: 32473278 E-mail: [email protected] AMA 8925 2006/1383 Lotro: 75 Registered Plan no.; RP48113 18 Weyba Street, SUNSHINE BEACH C/- Martoo Consulting Pty Led PO Box 1684 NOOSA HEADS QLD 4567 IDAS covering letter (concurrence agency) Paget od Page 12 of 17
Page 13
2006/138 Page 13 of 17 [OCR of page images] 2006/138 IDAS C-6 Concurrence agency response Integrated Plomning Act 1997 983,3.16 and 3.3.18 Applicant: Robert G Utz & Stephen J Clague C+ Mactoo Consulting Pry Lid PO Box 1684 NOOSA HEADS QLD 4567 Application n0,: 20061138 Date received by EPA: 08 February 2006 Jurisdiction; Exevirommental Protection Aet 1994 Role; Concurrence Description: Material Change of Use and Reconfiguration of a Lat 18 Weyta Street, SUNSHINE BEACH Lotno.: 7S Registered Plan no.: RP4BI13 1 ‘Type of development = Manerial change of use OC Reconfiguration of a Lot where: Othe existing wse of the land is, or if the Land is vacant land with no existing vse the mest recent wse of the land was, for a notifiable activity under the Exvironmental Protection Act 1998, the propaserd use of the land is fice child care, educational, recreational, residential or similar purposes and the existing use of the land is, or if the land is vacant land with no existing use the most recent ese of the land was, for an industrial activity. the land is on the Environmental Management Register or Contarsinated Land Register under the Environmental Protection Act 1994. the land is wholly or partly within an area for which an Area Management Advice foe industrial activity or natural mineralisation has been issued and the proposed use of the lund |s for child care, educational, recreational, residential or similar purposes. @ the land is wholly or partly in an area for which an Area Management Advice for unexploded ordnance (UXO) has been issued 2 conditions must attach to any appeoval of the development Dany approval must be foe pret only of the development Q samy approval must be 2 preliminary approval only CD there wre no concurrence agency requirements: Othe application must be refused ro Reasons for including condition(s) or refusal Tih site (the subject lov's) ts part of an aree of land within which the Department of Defence (Define) bars assessed a ‘substantial’ risk of resikiual UXO contamination exists. Visi the Defence website hetpal/wwew defence gov.aafune for details. Page 13 of 17
Page 14
2006/138 Page 14 of 17 [OCR of page images] 2006/138 IDAS C-6 Defence advises that development or land use rezoning proposals for land within a ‘substantial’ zome showld only proceed following the conduct of UXO investigation and clearance activities. Defence maintains a list of commercial UXO investigation and remedial search contractors that it accredits to tery out this work, Defience also recommends that owners or oceupiers of potentially affected land and workers and contractors employed on the land need to be aware of the procedure if a suspect object is found, ‘As the EPA has no record of the site being further investigated or remediated, it is eoesidered that there remains a possibility of UXO being found on it, 4 Conditions ‘The following concurrence agency conditions are to be attached to any approval: 4.1 Price to the commencement of any development-related excavation, earthworks or soil disturbance, that part of the site to be so worked is to be subjected to investigation and, where accessiry, appropriate remedial action, 42° Any person employed to work on any part of the site where Condition 4,1 has not been satisfied is to be forewarned in writing by the applicant. This warning is to explain that information available to the EPA indicates a potential for residual UXO exists on the site and work should proceed with due caution, bt is to state the procedure to be followed by any person finding an object suspected of being explosive ordnance or component thereof: Do not disturb the object. ‘Take action, where appeopriate, to provent it being disturbed hy another person. Note its appeoximate dimensions and general appearance. Note the route to its tocation. Advise the Police as soon 2s possible. 4.3 Following investigation aed any remedial actice taken to satisfy Condition 4.1 above, the applicant is to seboait a report, prepared im accordance with current guidelines, to the EPA for assessment. The EPA is to subsequently advise the Noosa Council and the applicant of its assessment in regard to Condition 4.1 being satisfied, 44° No gravel, rock, sand or soil is to be removed from the site without written EPA approval. 45 The applicant is 10 advise the owner and sey occupter of the site af the acwe responsibilities. $ Additional comments or advicw Applicants may contact the EPA's Contaminated Land Unit on (07) 3224 $644 of visit the Defence website hitpdiwww defonce, pov awuxo fie the details of current UXO investigation and remedial search contractors. The EPA accepts reports based on investigative and remedial work carried owt ‘by these contractors, Investigation and remedial action to satisfy Condition 4.1 typically involves sampling/search programs with detection equipment unless the use of such equipment is: © considered unvexeranted by # UXO comtractor due to the extent Of any prioe excavation or earthworks or, conversely, of amy filling proposed as part of the development program; or WR? Page 14 of 17
Page 15
2006/138 Page 15 of 17 [OCR of page images] 2006/138 IDAS C-6 © prevented or made impracticable by the presence of « structure, stockpile, natural barrier or metal waste. In the latter case, alternative action may be appeopriate to minimise the risk in the first instance. For example, where the risk of exposure to any UXO that eeay exist is reduced by the presence of a Stractare of nateral barrier, issuance of the standard UXO warning (see Condition 4.2) may salfice while the structure, stockpile or barrier remains in place. Where a structure is to be removed or reduced as part of the development program, protective precautions, comecasurate with any greater risk to which workers might then be exposed, may seed to be considered. Progressive assessment will be necessary where such circumstances exist. Unless, at the completion of preliminary works, there is evidence then available to the UXO commnctor that any residual risk is negligible, the use of detection equipment will typically be required to comfiers the site's status, ‘Where investigation, along with any subsequent remedial action and assessment, is 10 be implemented by stages to satisfy Comdition 4.t and 4.3, a preliminary investigation report should be submitted by the appficant to the EPA along with a management plan for the proposed work, Staged investigation/remediation is most likely to be applicable where developntent of smaller, built-cm kis (which can present clreumstances such as those discussed above) or broadhectare sites is proposed. In such cases, the EPA's assessment of the report and advice 10 Council im regard 9 appeoval of the development will be dependent on agreement with the management plan Where Condition 4.1 is 10 be satisfied by a whole lot or beoadhectare development stage being subjected to investigation and any necessary remedial action, the EPA, based on the subsequent tevestigmion’ remediation report's findings and recommendatiom’s, may reassess the lot, ar that portion comprising the development stage, 8 being remadiated or nog needing remediation, and advise the applicant and Council accordingly. Otherwise, any balance of tand thet has not bees further investigated will retain the risk assesment made by Defence, This is unless evidence obtained from the investigated part's can be wsed to refute Defence's assessment im regard to all or part of the balance. in the latter casn, the EPA may reassess all of the balance or the applicable part's as being unaffected by UXO. 6 Additional information This comcurrence response applies only to contaminated land issues and does not remove the need to obtain any further approwal for this development which may be required by this or other legistation, State and/or Commommvalth, Applicants are advised to check with all relevaes statutory authorities, Applicants should also comply with all relevant legislation. The EPA has not provided a notification 10 native title parties foe this application. The State's Native Tithe Woek Procedwres indicate that the responsibility for assessment of native title issues for an IDAS application rests with the Assessment Manager, [t is recommended that the Assessment Manager determines whether native title notification is required for this application. *End of respomse* IDAS C4 CLM ven? Page 15 of 17
Page 16
2006/138
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated (6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
for the application are not available against the part of
Division 8 - Appeals to court relating to the approval that represents the concurrence agency’s
development applications response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following- jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application if-
application; (a) the development application involves impact
(b) a matter stated in a development approval, including assessment; and
any condition applying to the development, and the (b) the advice agency told the applicant and the
identification of a code under section 3.1.6;1 assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for; (2) The appeal must be started within 20 business
(d) the length of a relevant period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal.
submitter.
(2) An appeal under subsection (1)(a) to (d) must be
started within 20 business days (the “applicant’s appeal
Appeals for matters arising after approval given
period”) after the day the decision notice or negotiated (co-respondents)
decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
(3) An appeal under subsection (1)(e) may be started development application, a person to whom any of the
at any time after the last day a decision on the matter following notices have been given may appeal to the
should have been made. court against the decision in the notice-
Appeals by submitters (a) a notice giving a decision on a request for extension
of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
appeal to the court about- (b) a notice giving a decision on a request to make a
minor change to an approval.
(a) the giving of a development approval, including any
conditions (or lack of conditions) or other provisions (2) The appeal must be started within 20 business
of the approval; or days after the day the notice of the decision is given to
the person.
(b) the length of a relevant period for the approval.
(3) Subsection (1)(a) does not apply if the approval
(2) The appeal must be started within 20 business resulted from a development application (superseded
days (the “submitters appeal period”) after the day the planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to application under a superseded planning scheme.
the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be started at
(4) If an application involves both impact assessment
any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are
should have been made.
available only for the part of the application involving
impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application (no co-respondents)
are available only for the aspects of the development that 4.1.31.(1) A person to whom any of the following notices
would have required public notification under the have been given may appeal to the court against the
repealed Act. decision in the notice-
(a) a notice giving a decision on a request to change or
cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local
planning instrument)
Page 16 of 17
Page 17
2006/138
(b) a notice under section 6.1.442 giving a decision to (c) the decision to give a preliminary approval when a
change or cancel a condition of a development development permit was applied for;
approval. (d) the length of a period mentioned in section 3.5.21
(2) The appeal must be started within 20 business relevant period;
days after the day the notice of the decision is (e) a deemed refusal.
given to the person.
(2) An appeal under subsection (1)(a) to (d) must be
(3) Also, a person who has made a request started within 20 business days (the “applicant’s appeal
mentioned in subsection (1)(a) may appeal to the period”) after the day the decision notice or negotiated
court against a deemed refusal of the request. decision notice is given to the applicant.
(4) An appeal under subsection (3) may be started at (3) An appeal under subsection (1)(e) may be started
any time after the last day the decision on the at any time after the last day a decision on the matter
matter should have been made. should have been made.
Appeals against decisions to change approval conditions The Registrar for the Building and Development
under the repealed Act Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court 4.1.36 Appeals about particular infrastructure
against- charges
(a) the decision; or (1) This section applies to a person who has been
(b) a deemed refusal of the application. given, and is dissatisfied with, an infrastructure charges
notice or a regulated State infrastructure charges notice.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of (2) The person may appeal to the court against the
the decision is to be given to the person. notice.
(3) An appeal under subsection (1)(b) may be started (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter after-
should have been made. (a) if the notice is given because of a development
Appeals against local laws approval or master plan approval-the day the
applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the (b) otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the (4) An appeal under this section may only be about-
planning scheme may appeal to the court against the
(a) whether a charge in the notice is so unreasonable
decision or the conditions applied. that no reasonable relevant local government, State
(2) The appeal must be started within 20 business infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the have imposed it; or
applicant.
(b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the under this section can not be about the methodology
Integrated Planning Act 1997 as follows: used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to charges schedule or regulated State infrastructure
development applications charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval, including
any condition applying to the development, and the
identification of a code under section 3.1.6;3
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override local
planning instrument)
Page 17 of 17
Used in these records
Decision Letter - Change to an Existing Approval - 010.2006.00000138.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 188 KB (small file)
- File type
No other editions are linked here.