SC7440 – Goodchap St, Noosa 9
3.3.3.2 Treatment Nodes
The following devices have been used in the treatment train to reduce these pollutant loads to achieve WQO’s.
Stormwater Harvesting – A 200kL volume of stormwater harvesting has been included in the
model. The re-use has been modelled for both irrigation (777kL/year) and toilet/laundry use (7.2kL
per day) as per the MUSIC modelling guidelines Section 4.2 for the site area and a 90 bed facility;
SPEL ‘SPELFilter’ Cartridges – Standard underground cartridges were required to achieve the
WQO’s. The filters use an upflow treatment process, through a spiral wrapped media configuration
that maximises surface treatment area. Refer to Appendix D for specifications. The design
proposed is:
o 4 Cartridges;
SPE ‘StormSacks’ GPT – A number of baskets installed to the top of field inlets to trap coarse
sediment prior to entering the drainage system was modelled in line with the cartridge system. The
design proposed is:
o 3 Baskets;
3.3.4 Effectiveness in Pollution Reduction
The water quality development model was set up with the incorporation of the above devices to reduce
pollutant export to WQO levels. Table 3.6 indicates the predicted pollutant mean values of stormwater
discharged as calculated by MUSIC:
Pollutant Percentage Load Reduction
Total Suspended Solids (TSS) 84.0%
Total Phosphorus (TP) 67.3%
Total Nitrogen (TN) 60.6%
Gross Pollutants (>5mm) 100%
Table 3.6 - Flow Based Pollutant Load Reduction
The MUSIC modelling results shown above indicate that the treatment train will adequately treat TSS, TP
and TN generated by stormwater runoff in accordance with the targets required under the water quality
objectives stated previously.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU18/001 - Referenced Document - Site Based Stormwater Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.