Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

MCU18/001 - Referenced Document - Site Based Stormwater Management Plan · MCU18/0019

of 42

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
SC7440 – Goodchap St, Noosa                                                                             9




3.3.3.2 Treatment Nodes
The following devices have been used in the treatment train to reduce these pollutant loads to achieve WQO’s.


        Stormwater Harvesting – A 200kL volume of stormwater harvesting has been included in the
        model. The re-use has been modelled for both irrigation (777kL/year) and toilet/laundry use (7.2kL
        per day) as per the MUSIC modelling guidelines Section 4.2 for the site area and a 90 bed facility;
        SPEL ‘SPELFilter’ Cartridges – Standard underground cartridges were required to achieve the
        WQO’s. The filters use an upflow treatment process, through a spiral wrapped media configuration
        that maximises surface treatment area. Refer to Appendix D for specifications. The design
        proposed is:
            o   4 Cartridges;
        SPE ‘StormSacks’ GPT – A number of baskets installed to the top of field inlets to trap coarse
        sediment prior to entering the drainage system was modelled in line with the cartridge system. The
        design proposed is:
            o   3 Baskets;



3.3.4   Effectiveness in Pollution Reduction
The water quality development model was set up with the incorporation of the above devices to reduce
pollutant export to WQO levels. Table 3.6 indicates the predicted pollutant mean values of stormwater
discharged as calculated by MUSIC:


                                  Pollutant               Percentage Load Reduction

                       Total Suspended Solids (TSS)                   84.0%

                          Total Phosphorus (TP)                       67.3%

                              Total Nitrogen (TN)                     60.6%

                         Gross Pollutants (>5mm)                      100%

                                  Table 3.6 - Flow Based Pollutant Load Reduction



The MUSIC modelling results shown above indicate that the treatment train will adequately treat TSS, TP
and TN generated by stormwater runoff in accordance with the targets required under the water quality
objectives stated previously.

Used in these records

About this file

File size
2.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU18_001 - Referenced Document - Site Based Stormwater Management Plan.pdf · 2.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.