Council archive · source document
MCU18/001 - Referenced Document - Site Based Stormwater Management Plan · MCU18/0019
Plans and drawings: the text below has words only, no drawings.
SC7440 – Goodchap St, Noosa 13
Flows from minor storms up to and including the 10 year ARI are to be conveyed in the underground
drainage system. Major storm events exceeding the ARI10 year, up to and including the peak ARI 100 year
events will overtop the stormwater pits fronting the boundary and flow overland into Council’s road reserve.
A concept drainage layout plan has been included as Appendix A of this report.
4.4 Modelling Results
A node layout plan is included in Appendix C of this report and the resultant peak flow rates are displayed
in Table 4.3 & 4.4.
ARI Design Storm (min) Peak Flow (m3/s)
2 60 0.170
5 60 0.230
10 60 0.262
20 60 0.309
50 60 0.350
100 60 0.392
Table 4.3 – Pre-Development Peak Flow Rate Results
ARI Design Storm (min) Peak Flow (m3/s)
2 60 0.104
5 60 0.124
10 60 0.133
20 60 0.197
50 60 0.254
100 60 0.285
Table 4.4 – Post-Development (mitigated) Peak Flow Rate Results
As can be seen in Tables 4.3 & 4.4 the post-development peak flow rates to the existing drainage system
compare well to that of the existing pre-development site discharges. This is due to the large volumes of
on-site detention proposed to be included as part of the development.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU18/001 - Referenced Document - Site Based Stormwater Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.