MCU18/001 - Referenced Document - Site Based Stormwater Management Plan · MCU18/0019
Plans and drawings: the text below has words only, no drawings.
SC7440 – Goodchap St, Noosa 26
Site Location: Noosa
DURATION 1 Year 2 years 5 years 10 years 20 years 50 years 100 years
5Mins 130.00 165.00 202.00 224.00 253.00 291.00 320.00
6Mins 122.00 155.00 190.00 210.00 238.00 274.00 302.00
10Mins 100.00 127.00 156.00 173.00 197.00 227.00 250.00
20Mins 73.70 93.50 116.00 128.00 145.00 168.00 185.00
30Mins 60.20 76.50 94.70 105.00 119.00 138.00 152.00
1Hr 40.60 51.90 64.90 72.40 82.60 96.10 106.00
2Hrs 26.00 33.40 42.60 48.10 55.40 65.10 72.60
3Hrs 19.60 25.40 33.00 37.50 43.50 51.50 57.70
6Hrs 12.10 15.80 21.10 24.40 28.70 34.40 39.00
12Hrs 7.65 10.10 13.80 16.20 19.20 23.30 26.60
24Hrs 5.04 6.69 9.30 11.00 13.10 16.10 18.50
48Hrs 3.35 4.47 6.28 7.45 8.96 11.00 12.70
72Hrs 2.53 3.39 4.81 5.75 6.94 8.60 9.94
Table C.1 - IFD Date Sourced from BOM
ARI in 1 2 5 10 20 50 100
years
coefficient 3.68E+00 3.92E+00 4.15E+00 4.27E+00 4.4039206 4.56E+00 4.67E+00
A
51
coefficient -5.98E-01 -5.90E-01 -5.67E-01 -5.55E-01 -5.45E-01 -5.33E-01 -5.25E-01
B
coefficient -4.98E-02 -4.54E-02 -3.46E-02 -2.84E-02 -2.35E-02 -1.80E-02 -1.40E-02
C
coefficient 6.89E-03 6.75E-03 6.57E-03 6.45E-03 6.23E-03 6.05E-03 0.01
D
coefficient 2.68E-03 2.25E-03 1.30E-03 7.23E-04 2.98E-04 -1.75E-04 -5.34E-04
E
coefficient -9.82E-05 -8.61E-05 -7.75E-05 -6.28E-05 -4.09E-05 -2.28E-05 -3.69E-06
F
coefficient -9.36E-05 -8.24E-05 -5.73E-05 -4.33E-05 -3.49E-05 -2.46E-05 -1.74E-05
G
Table C.2 – Coefficients (BOM)
[OCR of page images]
$C7440 — Goodchap St, Noosa
26
Site Location: Noosa
DURATION 1 Year | 2 years 5 years 10 years | 20 years | 50 years 100 years
5Mins 130.00 | 165.00 202.00 224.00 253.00 291.00 320.00
6Mins 122.00 | 155.00 190.00 210.00 238.00 274.00 302.00
10Mins 100.00 | 127.00 156.00 173.00 197.00 227.00 250.00
20Mins 73.70 | 93.50 116.00 128.00 145.00 168.00 185.00
30Mins 60.20 | 76.50 94.70 105.00 119.00 138.00 152.00
1Hr 40.60 | 51.90 64.90 72.40 82.60 96.10 106.00
2Hrs 26.00 33.40 42.60 48.10 55.40 65.10 72.60
3Hrs 19.60 | 25.40 33.00 37.50 43.50 51.50 57.70
6Hrs 12.10 15.80 21.10 24.40 28.70 34.40 39.00
12Hrs 7.65 10.10 13.80 16.20 19.20 23.30 26.60
24Hrs 5.04 6.69 9.30 11.00 13.10 16.10 18.50
48Hrs 3.35 4.47 6.28 7.45 8.96 11.00 12.70
72Hrs 2.53 3.39 4.81 5.75 6.94 8.60 9.94
Table C.1 - IFD Date Sourced from BOM
ARI in 1 2 5 10 20 50 100
years
coefficient 3.68E+00 | 3.92E+00 | 4.15E+00 | 4.27E+00 | 4.4039206 | 4.56E+00 | 4.67E+00
A 51
coefficient | -5.98E-01 | -5.90E-01 | -5.67E-01 | -5.55E-01 | -5.45E-01 | -5.33E-01 | -5.25E-01
B
cefficient -4.98E-02 | -4.54E-02 | -3.46E-02 | -2.84E-02 | -2.35E-02 | -1.80E-02 | -1.40E-02
coefficient 6.89E-03 | 6.75E-03 | 6.57E-03 | 6.45E-03 | 6.23E-03 | 6.05E-03 | 0.01
coefficient 2.68E-03 2.25E-03 1.30E-03 7.23E-04 2.98E-04 -1.75E-04 | -5.34E-04
E
coefficient | -9.82E-05 | -8.61E-05 | -7.75E-05 | -6.28E-05 | -4.09E-05 | -2.28E-05 | -3.69E-06
F
coefficient -9.36E-05 | -8.24E-05 | -5.73E-05 | -4.33E-05 | -3.49E-05 | -2.46E-05 | -1.74E-05
Table C.2 — Coefficients (BOM)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU18/001 - Referenced Document - Site Based Stormwater Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.