Council archive · source document
MCU18/001 - Referenced Document - Site Based Stormwater Management Plan · MCU18/0019
Plans and drawings: the text below has words only, no drawings.
SC7440 – Goodchap St, Noosa 2
TABLE OF CONTENTS
1.0 Introduction ............................................................................................................. 3
1.1 Background ......................................................................................................... 3
1.2 Scope .................................................................................................................. 3
1.3 Existing Topography ............................................................................................ 3
1.4 Proposed Development........................................................................................ 4
2.0 Water Cycle Management ....................................................................................... 5
2.1 Background ......................................................................................................... 5
2.2 Wastewater Minimisation ..................................................................................... 5
3.0 Water Quality Management .................................................................................... 5
3.1 Background ......................................................................................................... 5
3.2 Construction Phase.............................................................................................. 5
3.3 Operational Phase ............................................................................................... 6
3.3.1 Water Quality Objectives.................................................................................. 7
3.3.2 Catchment Areas ............................................................................................. 7
3.3.3 Pollutant Export Modelling ............................................................................... 7
3.3.3.1 Rainfall Data................................................................................................ 8
3.3.3.2 Treatment Nodes ......................................................................................... 9
3.3.4 Effectiveness in Pollution Reduction................................................................. 9
4.0 Stormwater Quantity Management....................................................................... 10
4.1 Background ....................................................................................................... 10
4.2 Site Drainage Constraints and Opportunities ...................................................... 10
4.2.1 Drainage Constraints ..................................................................................... 10
4.2.2 Drainage Opportunities .................................................................................. 10
4.3 Modelling Overview............................................................................................ 10
4.3.1 Methodology .................................................................................................. 10
4.3.2 Catchment Areas ........................................................................................... 11
4.3.3 Roughness Coefficients ................................................................................. 11
4.3.4 Storm Events ................................................................................................. 11
4.3.5 Outlet Condition ............................................................................................. 12
4.3.6 On-Site Detention .......................................................................................... 12
4.4 Modelling Results .............................................................................................. 13
4.5 Impacts on Existing Infrastructure ...................................................................... 14
5.0 Flood Hazard Overlay ........................................................................................... 18
6.0 Conclusions .......................................................................................................... 19
APPENDIX A – STORMWATER MANAGEMENT PLAN..................................................... 20
APPENDIX B – STORMWATER QUALITY MUSIC MODELLING ....................................... 21
APPENDIX C – XP-STORM MODELLING .......................................................................... 25
APPENDIX D – SPEL SPECIFICATIONS ........................................................................... 30
APPENDIX E – RATIONAL METHOD CALCULATIONS .................................................... 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU18/001 - Referenced Document - Site Based Stormwater Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.