Log in to see the plans as drawn LOCALITY PLAN
1. PURPOSE & PERFORMANCE
1.1. Works are to restore rock oyster ecosystems throughout the Noosa River estuary at sites that meet site suitability criteria and
positively interact with current human uses.
1.2. Works may provide some erosion protection; however, they have not been designed specifically for this purpose.
1.3. As the works do not include geotextile underlayer, some settlement is to be expected and has been factored into the design.
1.4. Module layouts have been developed to allow water flows through the structure to reduce siltation, however some siltation is to
be expected and has been factored into the design. Module layouts are to be laid as reef patches and may be curved or shaped SITE
to reflect the local bathymetry and specific constraints of each restoration site.
1.5. Inundation and overtopping during higher tides and flood events is to be expected.
2. SCOPE OF WORKS
2.1. Phase 1. Deployment of restoration substrates in modular forms at 4 restoration sites.
2.2. Phase 2. (SUBJECT TO SEPARATE APPROVAL) Deployment of restoration substrate at additional sites and/or to augment or
maintain existing sites throughout the estuary as funding allows. Additional sites to be progressively selected from within the
NOOSA SOUND EAST SITE 2.3.
identified Restoration Zones (refer Note 5).
Works may include seeding of substrate with oyster spat and/or live oysters. Oysters to be sourced from brood stock within the
Noosa River and/or culture stock from oyster gardening within the Noosa River.
2.4. Works may be staged. Individual sites may be staged subject to engineer's certification.
2.5. Deployment of navigation buoy(s) at each site and signage in accordance with permit conditions. NOTES
NOOSA SOUND WEST SITE 2.6. Works to be undertaken in accordance with the Project Restoration Plan.
2.7. Monitoring and Maintenance, as required (refer Note 4.)
2.8. Works may need to be adapted in response to climate change, depending on monitoring of habitat health.
3. NOOSA RIVER FISH HABITAT AREA, MATTERS OF STATE ENVIRONMENTAL SIGNIFICANCE & MARINE PLANTS
3.1. The objective of the works is to restore oyster-dominated ecosystems to the Noosa River estuary including within the Noosa
River Fish Habitat Area.
3.2. Two of the Phase 1 Restoration Sites, Tewantin and Goat Island, are within the Noosa River Fish Habitat (A) Area. The Noosa
Sound East and Noosa Sound West restoration sites occur outside of the Noosa Fish Habitat Area. The Phase 2 Restoration
Sites have not been selected, but will be within the Noosa River Fish Habitat Area (except for any further works in Noosa Sound
restoration sites).
3.3. Works to occur within the identified Restoration Zones, within 30m from shore, in water depths less than 2m below MLWS. The
GOAT ISLAND SITE exception to this is the Tewantin site where works are proposed on existing rocky substrate, or in the future where otherwise
approved in writing by MSQ.
TEWANTIN SITE 3.5. Phase 1 works results in temporary impacts to sparse marine plants at Tewantin site only.
3.6. Works are NOT to impact on existing terrestrial vegetation (including vegetation within mapped MSES).
3.7. During construction, plume is to be minimised and monitored visually to ensure no impacts to adjacent marine plants. Turbidity
monitoring to be undertaken in the event that it extends within 5m of mapped seagrass beds (Refer Project Restoration Plan
Section 6.4).
4. MONITORING & MAINTENANCE
4.1. Restoration substrates to be monitored periodically and after storm events in accordance with the Project Restoration Plan.
4.2. Maintenance to be undertaken as required. This may include:
· Reprofiling and/or placement of additional rock to reinstate design levels and profiles after expected settlement has
occurred. Ideally this would occur 12 months after deployment, but may be subject to timing of other works. Where limited
settlement is experienced (nominally <200mm) and the crest remains within the target depths for oyster growth,
maintenance works are not required. Additional rock only to be placed on existing reef where monitoring indicates that this
will enhance the habitat (not where existing habitat is established and healthy).
· Placement of additional oyster cultch (seeded or unseeded) and/or live oysters, onto a reef patch. Total volume of loose
shell (including existing loose shell) is not to exceed 10kg/m2 to maximise interlocking of the cultch or oysters with the rock.
· Removal of displaced rock and or oyster shell, if found more than 5m outside the restoration site, as part of monitoring, and
if resulting in negative impacts, is required.
5. RESTORATION ZONES, RESTORATION SITES, RESTORATION FOOTPRINTS
5.1. Suitable Restoration Zones have been identified as listed below. For more detailed images of each zone, refer drawing
NROR-2021-01. The Restoration Zones have been developed based on Habitat Suitability parameters and Restoration
Suitability parameters as detailed in the Project Restoration Plan.
LEGEND
Zone 1. Main Channel
Zone 2. Noosa Sound
Zone 3. Weyba Creek
PHASE 1 SITE
Zone 4. Lake Weyba
Zone 5. Lake Donella
5.2. Restoration Sites are identified within each Restoration Zone based on mapping of site-specific constraints, knowledge of past
oyster bed occurrences (where possible) and adoption of minimum distances outlined in Table 1.
Table 1. Constraints and Minimum Distances to Determine Restoration Footprint.
VERTICAL DATUM: - HORIZONTAL DATUM: -
REVISION REGISTER
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
A 9/7/21 Pre-lodgement comments SK BC AJ
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
*Substrate may be placed on existing rocky reef where the substrate is not supporting significant habitat.
**Unless approval is granted for enhancement of significantly degraded areas.
PROJECT NAME
***Except with written agreement of MSQ to extend further offshore (e.g. Tewantin Site).
Noosa River Oyster Restoration
5.3. The Restoration Footprints are the area of riverbed encompassed by a group of restoration substrate reef patches. Restoration DRAWING TITLE
Footprints are to be within the selected Restoration Sites. Phase 1 Restoration Sites are listed below and detailed on drawing
NRN-2021-03, -04, -05 & -06.
General Notes and Site Selection
Goat Island Restoration Site
Tewantin Restoration Site DRAWING No. REVISION:
Noosa Sound West Restoration Site
Noosa Sound Easts Restoration Site
NROR-2021-00 A
DRAWN : SK CHECKED :BC APPROVED :AJ
RPEQ 2876
SIZE: A3 SCALE : A3 DATE : 05 Aug, 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 5 pages
Page 2
LOCALITY PLAN
CONCEPT LAYOUTS
LAYOUT 1 LAYOUT 2 LAYOUT 3 SITE
SUITABLE FOR RANGE OF PROFILES.
SUITABLE FOR FLATTER PROFILES THAT PROVIDE A REEF LENGTH >5m. SUITABLE FOR RANGE OF PROFILES.
SUITABLE FOR RANGE OF SEDIMENT TRANSPORT SITES
SUITABLE FOR LOW SEDIMENT TRANSPORT SITES ONLY. SUITABLE FOR RANGE OF SEDIMENT TRANSPORT SITES
(Including Restoration Zone 1 Main Channel).
(i.e. Not within Restoration Zone 1. Main Channel) (Including Restoration Zone 1 Main Channel).
IDEAL FOR SITES THAT ARE NOT EXPERIENCING EROSION OR
IDEAL FOR SITES THAT ARE EXPERIENCING EROSION.
WHERE THERE ARE CONCERNS REGARDING SILTATION
Module Width
SHORE SIDE SHORE SIDE SHORE SIDE
Offset
Offset
Offset
ACCESS SPACE 1m-4m (See Note 1.5.) NOTES
ACCESS SPACE 1-4m (See Note 1.5.)
MODULE WIDTH MODULE WIDTH ACCESS SPACE 1-4m (See Note 1.5.)
MHWS MHWS MHWS
dependent on available profile width
dependent on available profile width
No. of modules & module width
No. of modules & module width
Module length dependent on
available profile width
1m Below MLWS preferred.
1m
1m
1m
1m Below MLWS preferred. 1m Below MLWS preferred.
Max 2m below MLWS. Max 2m below MLWS. Max 2m below MLWS.
RIVER SIDE RIVER SIDE RIVER SIDE
LAYOUT 1 LAYOUT 2 LAYOUT 3
Restoration Footprint Extent
Restoration Footprint Extent LEGEND
Restoration Footprint Extent CREST WIDTH ACCESS SPACE CREST WIDTH ACCESS SPACE MHWS
Offset (See Note 1.4) (See Note 1.5) 1m Offset (See Note 1.4) (See Note 1.5) 1m
Offset 1m 1-2m below MLWS
MHWS MHWS MHWS Restoration Footprint
1.5 (max) MLWS 1.5 (max) MLWS 1.5 (max) MLWS
1 LAT 1 LAT 1 LAT
1m Below MLWS 1m Below MLWS 1m Below MLWS
VERTICAL DATUM: - HORIZONTAL DATUM: -
TYPICAL SECTIONS
REVISION REGISTER
- - - - - -
- - - - - -
DESIGN NOTES - - - - - -
1. MODULE LAYOUT: 3.4. Shell to be evenly mixed through the rock, when used as a composite, to achieve good interlocking and not
1.1. Restoration footprints (i.e. collection of substrate reef patches within a restoration site) are to be defined by placed in alternating layers. Mixing to occur in small volumes on the barge immediately prior to placement to - - - - - -
constraint mapping and minimum required distances as per Table 1 on NROR-2021-00. avoid shell damage due to rehandling. - - - - - -
1.2. Rock substrate is to be laid as reef patches, as per the drawings for each restoration footprint and consistent
with the design module requirements. Reef patches may be curved or shaped to reflect the local bathymetry 4. CONSTRUCTION: A 9/7/2021 Pre-lodgement comments SK BC AJ
and specific conditions and constraints for each restoration site. 4.1. Reefs patches expected to be constructed using an excavator mounted on a shallow-draft barge. Excavator REV.NO. DATE DESCRIPTION BY ENG. APP.
1.3. Footprint of reef patches to consider construction practicality and tolerances. This includes to be fitted with GPS position control (or have equivalent system in place to enable accurate placement).
1.3.1. Allowance for a minimum distance from MHWS sufficient to allow for placement of design rock grading. 4.2. Substrate Placement
1.3.2. Minimum distance of 1m from seaward extent to allow for construction tolerances in deeper water. 4.2.1. Rock shall be placed to be well interlocked and stable. International
1.4. Crest width to be minimum 1m in any direction. Larger crest widths (up to nominal 10m) are more desirable 4.2.2. Rock shall be placed to provide an irregular, organic finish (within nominated tolerances). This will
as they provide a larger area for oyster growth. assist in enhancing the stability of the seeded oyster cultch. Coastal
1.5. Access space between reef patches to nominally be 1m - 4m although larger spaces may be desirable 4.2.3. Rock placement to be clear of any existing vegetation and minimum required distances (NROR-2021-00
depending on site configuration or expected sediment transport or siltation. Note 5.2).
Management
1.6. Final layout of reef patches to be determined by the certifying coastal engineer prior to construction and take 2.2. Cured Oyster Shell 4.3. Placement tolerances OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
into consideration local bathymetry, geometry of Restoration Footprint, adjacent land uses, presence of 2.2.1. Shells to be sourced from Mooloolaba Fish Market and local seafood restaurants. Shells to be cured (by 4.3.1. ± 0.5m horizontal tolerance TELEPHONE +61 7 55640564 FAX +61 7 55329147
erosion, existing infrastructure, wave action, water flows, sediment type, expectation of siltation and any other desiccation) in accordance with Queensland End of Waste Code - Oyster shells (ENEW07278317) as 4.3.2. ± 0.2m vertical tolerance (except crest) WEBSITE www.coastalmanagement.com.au
relevant factors. per the Waste Reduction and Recycling Act 2011. 4.3.3. Crest level to be no higher than MHWS and not more than 0.2m below MHWS at time of construction.
2.2.2. Shells to be whole, not fragments. Crest height to be lowered, as required, to match oyster recruitment heights at a given site.
2. MATERIALS 2.2.3. Shells may be washed in freshwater prior to deployment as composite substrate or as cultch (unseeded 4.3.4. Settlement of rock is expected to lower the reef patch profile over time.
2.1. Rock or seeded with oyster spat) 4.4. Anchoring of construction vessel not to impact on marine plants. No anchoring within 100m of submarine PROJECT NAME
2.1.1. Grading to be stable for individual locations and provide voids, rugosity and habitat complexity suitable cables. Noosa River Oyster Restoration
for habitat growth, as per design reef patches in drawings. 2.3. Seeded Oyster Cultch
- Phase 1 sites. Rock grading to be 150 - 500mm diameter with 50% over 300mm. 2.3.1. Cured oyster shell to be seeded with local oyster spat to enhance oyster growth and recruitment locally. 5. SEEDED OYSTER CULTCH, UNSEEDED OYSTER CULTCH, LIVE OYSTERS DRAWING TITLE
- Phase 2 sites. Rock grading for individual sites to be determined by coastal engineer for 2.3.2. Live oyster brood stock to be grown in oyster bags within the Noosa River as part of oyster gardening 5.1. Seeded Oyster Cultch, unseeded oyster cultch and/or live oysters are to be placed across the crest of the Module Designs
stability and suitability prior to construction project (with permit). rock substrate and would typically extend down the batters of the rock substrate. Seeding of areas in close
- Individual larger rocks may add to rugosity and may be incorporated provided that it fits within proximity to the seabed is to be avoided.
the profile of the reef patch and achieves good interlocking. 3. OYSTER REEF SUBSTRATE 5.2. Seeded Oyster Cultch and/or Live Oysters are to be placed as a single layer. Stacking or layering of cultch is DRAWING No. REVISION:
2.1.2. Rock to be igneous or metamorphic rock suitable for use in the marine environment. Rock to be sound, 3.1. A rock only substrate or a composite substrate of rock (as specified) mixed with cured oyster shell may be to be avoided. (Target placement volume of 5kg/m2/ with maximum 10kg/m2/.) NROR-2021-02 A
hard, durable and angular. Rock to be clean and free of topsoil and organic matter. used as a restoration substrate. 5.3. Seeded Oyster Cultch and/or Live Oysters are to be placed by hand into voids within rock substrate and
2.1.3. Rock characteristics to be in accordance with table below. 3.2. The composite substrate to be up to 10% shell to ensure substrate stability is maintained. interlocked as far as possible to limit loss from the structure. DRAWN : SK CHECKED :BC APPROVED :AJ
3.3. Oyster shell volume in composite may be increased to 20% in lower flow locations, subject to certifying 5.4. Placement to target more protected areas (less exposed to wave and current) preferentially.
engineer's approval. A higher component of shell may be considered subject to constructability and
RPEQ 2876
monitoring outcomes.
SIZE: A3 SCALE : A3 DATE : 05 Aug, 2021
Page 3
(a) Only signs for safety or education purposes
associated with the restoration works are permitted
and if installed must be maintained.
GOAT ISLAND SITE (b) Any wording included on the signs must be
consistent with the permitted development and
associated activity and the permissible
management of this development/activity within the
Noosa River declared Fish Habitat Area.
(c) The authority holder or their agent is
responsible for any enquiries directed by the sign.
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
Page 4
(a) Only signs for safety or education purposes
associated with the restoration works are permitted
and if installed must be maintained.
(b) Any wording included on the signs must be
TEWANTIN SITE
consistent with the permitted development and
associated activity and the permissible
management of this development/activity within the
Noosa River declared Fish Habitat Area.
(c) The authority holder or their agent is
responsible for any enquiries directed by the sign.
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
Page 5
LOCALITY PLAN
SITE
NOOSA SOUND WEST SITE
NOTES
1. Drawing Data:
1.1. Aerial image. Nearmap 29/10/2020
1.2. Site Survey. Northgroup Consulting Jan 2021
1.3. Environmental Mapping. Ecological Service
Professionals 2020
2. Site Parameters
2.1. 50yr Design wave height: 0.35m
2.2. Design wave period: 2.0s
2.3. 50yr Flood velocity: 0.16m/s
SITE LOCATION HAT
MHWS
RL +1.04m
RL +0.84m
MSL RL +0.45m
AHD RL +0.42m
MLWS RL +0.28m
LAT RL 0.0m
From MSQ 2021 Tidal Planes Munna Point Station
3. Restoration Footprint.
3.1. Landward extent defined by minimum
0 40 distances to vegetation. Extent may be
modified on site as required to ensure no
20 impact to existing vegetation (including dead
Meters Min 10m DISTANCE FROM MSQ BEACON TO BEACH trees).
3.2. Seaward extent defined by 1m below MLWS.
PREFERRED NAVIGATION CHANNEL CENTERLINE d
Lan
3.3. Observe all constraints and minimum
S tate distances set out in Drawing NROR-2021-00.
ted
4. Reef Patch Layout.
oca 4.1. Based on design module 3. Refer Drawing
Unall NROR-2021-02.
4.2. Rock size 150mm to 500mm with 50% over
300mm.
Up to 90m
4.3. Access width nominal 1m to 4m.
4.4. Minor layout modifications may be adopted in
response to any changes in site characteristics
NO ANCHORING WITHIN 100m OF SUBMARINE CABLE (e.g. in response to a newly fallen tree or
changes to seagrass extent). Any modification
to be in line with design principles outlined in
RESTORATION FOOTPRINT SUBMARINE CABLES Drawing NROR-2021-02. Any significant
(Min +5m DISTANCE) changes to be reviewed by the certifying
engineer.
4.5. Total Restoration Footprint area 937m2
A
4.6. Total area of rock 615m2
4.7. Total volume of rock ~1,150m3
4.8. Historic survey data limited. Settlement
B
expected to be 0.2m but could be higher.
JETTY Higher settlement expected on seaward edge
of reef.
LEGEND
HAT Mangroves
MHWS Seagrass
MLWS Rocky Oyster Rubble
1m Below MLWS Sand
C Vegetation Line
RP Boundary
Saltmarsh
Restoration Footprint
Min 30m
Fish Habitat Area
B Extent
MSQ Preferred
channel centerline
10m Distance from MSQ
A preferred channel centerline
VERTICAL DATUM: LAT HORIZONTAL DATUM: GDA94
D REVISION REGISTER
- - - - - -
- - - - - -
- - - - - -
6KNOT SIGN
2m DISTANCE - - - - - -
ROCK SUBSTRATE TO BE PLACED CLEAR OF EXISTING
B
MANGROVES VEGETATION AND BELOW MHWS WERE POSSIBLE.
- - - - - -
A
A 9/7/21 Pre-lodgement comments SK BC AJ
NT
REV.NO. DATE DESCRIPTION BY ENG. APP.
EASEMENT
ME
871
604
REEF PATCHES LAYOUT
SP 606
OSP290507
SE
International
195
SP188270
EA
Coastal
Existing mangroves
Management
Existing Vegetation (Not mangroves) OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
Restoration Footprint Restoration Footprint
1m 10m to 17m 1m
PROJECT NAME
Noosa River Oyster Restoration
5m to 8m
1m to 4m DRAWING TITLE
2m (min) 1 - 2m 1m to 6m 1m to 6m Phase 1 - Noosa Sound West
0.22 - 0.42m AHD MHWS 0.22 - 0.42m AHD 0.22 - 0.42m AHD MHWS
Restoration Site
1.5 max MLWS 1.5 max MLWS DRAWING No.
1 1
REVISION:
LAT LAT
NROR-2021-05 A
1m Below MLWS 1m Below MLWS
DRAWN : SK CHECKED :BC APPROVED :AJ
Seabed Profile Seabed Profile RPEQ 2876
SIZE: A3 SCALE : A3 DATE : 05 Aug, 2021
Page 6
LOCALITY PLAN
SITE
NOOSA SOUND EAST SITE
NOTES
1. Drawing Data:
1.1. Aerial image. Nearmap 29/10/2020
1.2. Site Survey. Northgroup Consulting Jan 2021
1.3. Environmental Mapping. Ecological Service
Professionals 2020
2. Site Parameters
2.1. Design wave height: 0.35m
2.2. Design wave period: 2.0s
SITE LOCATION
2.3. 50yr Flood velocity: 0.16m/s
HAT RL +1.04m
MHWS RL +0.84m
MSL RL +0.45m
AHD RL +0.42m
MLWS RL +0.28m
LAT RL 0.0m
From MSQ 2021 Tidal Planes Munna Point Station
3. Restoration Footprint.
3.1. Landward extent defined by minimum
distance to vegetation. Extent may be
modified on site as required to ensure no
impact to existing vegetation (including dead
trees).
3.2. Seaward extent defined by 1m below MLWS.
Unallocated State Land 3.3. Observe all constraints and minimum
distances set out in Drawing NROR-2021-00.
4. Reef Patch Layout.
4.1. Based on design module 3. Refer Drawing
NROR-2021-02.
4.2. Rock size 150mm to 500mm with 50% over
300mm.
4.3. Access width nominal 1m to 4m.
4.4. Minor layout modifications may be adopted in
response to any changes in site
characteristics (e.g. in response to a newly
fallen tree or changes to seagrass extent).
Any modification to be in line with design
principles outlined in Drawing
NROR-2021-02. Any significant changes to
A
be reviewed by the certifying engineer.
4.5. Total Restoration Footprint area 1839m2
4.6. Total area of rock 1,209m2
Up to 240m
4.7. Total volume of rock ~832m3
4.8. Historic survey data limited. Settlement
expected to be 0.2m but could be higher.
C Higher settlement expected on seaward edge
RESTORATION FOOTPRINT of reef.
LEGEND
HAT Mangroves
MHWS Seagrass
D
10m MLWS Rocky Rubble
B
10m 1m Below MLWS
Vegetation Line
Sand
Restoration Footprint
10m 10m RP Boundary Fish Habitat Area
A 10m 10m MSQ Preferred Extent
2m DISTANCE channel centerline
10m Distance from MSQ
MANGROVES preferred channel centerline
EASEMENT
DRP
FORESHORE ACCESS
VERTICAL DATUM: LAT HORIZONTAL DATUM: GDA94
0 223408 REVISION REGISTER
SP188261 0 - - - - - -
SP103385
ROCK SUBSTRATE TO BE PLACED CLEAR OF EXISTING - - - - - -
A
VEGETATION AND BELOW MHWS WERE POSSIBLE.
e
- - - - - -
Nor venu
FORESHORE ACCESS FORESHORE ACCESS - - - - - -
0
A
th
07
BUP13469 1 0 - - - - - -
sia
1 070 BUP8432
RP1 7
5 3 2 RP97493
k
0 A 9/7/21 SK BC BC AJ
Ban
0 60 RP92804
BUP2048 SP234718 RP106422 RP106442 REV.NO. DATE DESCRIPTION BY ENG. APP.
30
Meters
REEF PATCHES LAYOUT International
Coastal
Existing vegetation
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
Restoration Footprint
6m to 14m 1m PROJECT NAME
1m to 10m Noosa River Oyster Restoration
DRAWING TITLE
0.22 - 0.42m AHD MHWS Phase 1 - Noosa Sound East
1.5 max MLWS Restoration Site
1 LAT DRAWING No. REVISION:
Rock substrate to be placed clear of existing 1m Below MLWS NROR-2021-06 A
vegetation and below MHWS were possible. DRAWN : SK CHECKED :BC APPROVED :AJ
Seabed profile
RPEQ 2876