Council archive · source document
MCU15/0095 & REC15/0022 PM Submission Object - Petition - principal submitter - Tracy Stevens
Very large file (13.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
from the NSW DECCCode Air Quality and Vapour Recovery Requirements) would
comply as is and not needfurther modification to be compliant".
56. The relevant section of the Brisbane City Council (BCC) service station code (9.3.21) is
set out below. It concerns the required separation distance between fuel dispensing
14
areas and a sensitive use zone (which includes a schooI ):
Performonce Outcome 7
Development:
(0) is locoted a sufficient distonce from dwellings to mointoin residential omenity in
adjoining, adjacent or surrounding areas;
(b) avoids or minimises air emissions, including the instollatian of vapour recovery
systems;
(c) complies with the fallowing criteria at a sensitive zone or a sensitive use:
(i) air quality planning criteria in Table 9.3.21.3.015;
(ii) odour criteria in Table 9.3.21.3.E.
Note-An air quality impact report prepared in accordance with the Air quality planning
scheme policy can assist in demonstrating achievement of this performance outcome.
Acceptable Outcome 7.2
Development:
(a) if the annual throughput does nat exceed 1.2ML of fuel ensures fuel-dispensing areas and
vents are not located within 10m of 0 sensitive use or 0 sensitive zone;
(b) if the annual throughput is between 1.2ML and 9ML affuel, ensures fuel dispensing oreas
and vents are nat located within SOm of a sensitive use;
(c) if the annual throughput daes nat exceed 12ML affuel:
(i) is fitted with Stage 1 and Stage 2 vapour recovery equipment in compliance with the air
quality section of the Storage and dispensing of petroleum products planning scheme policy;
(ii) ensures fuel-dispensing areas and vents are not located within 20m of a sensitive use or a
sensitive zane;
(d) if the annual throughput exceeds 12ML, na acceptable outcome is prescribed.
Editor's note-"Fuel" means motor spirit, including petrol, premium unleaded petrol and
ethanol blend but excluding diesel.
57. The developers have conveniently not informed us as to what the estimated annual
throughput of motor spirit will be with respect to the proposed service station.
However, based on the information provided it is reasonable to expect the annual
throughput of motor spirit could exceed 12ML.
58. Accordingly, based on the BCC Service Station code Acceptable Outcome 7.2(d), if the
annual throughput of motor spirit for the proposed service station does exceed 12ML,
there is no acceptable outcome that is prescribed. Further, no air quality impact
report has been prepared in accordance with the Air Quality Planning Scheme policy
substantiating the developers claim that the 25m setback is sufficient.
14 TableSC1.2.3.A-lndexof BrisbaneCityCounciladministrativedefinitions.
15 Thisrequiresbenzenelevelsto be limited at 3 ppb (partsper billion) overa l-year period.
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU15/0095 & REC15/0022 PM Submission Object - Petition - principal submitter - Tracy StevensRelated documentApplication case desk ↗
MCU15/0095 & REC15/0022 PM Submission Object - Petition - principal submitter - Tracy StevensRelated documentApplication case desk ↗
About this file
- File size
- 13.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.