Council archive · source document
2. Amended Architectural Plans (Rec 27.7.26) · MCU21/0175
Plans and drawings: the text below has words only, no drawings.
Very large file (48.0 MB): may take a few minutes to open.
1 2 3 4 5 6 7 8 9 10 11 12
8500 6000 8100 8100 8500 8100 8100 8500 8500 8500 7700
PRIVATE OPEN SPACE COVENANT
3 2
2 BIO-RETENTION / LANDSCAPING 201 204
WA
301
179 m2
LTE
RH
AY
5800
D
B
A RIV
202
10 STAFF CAR PARK
RAMP TO BASEMENT 084 085
2400
086 087 088 089 090 091 092 093
E
8000
6000
1:8 1:6
400
AWNING ROOF OVERHANG HRV
B
0
BIN STORE
005
MRV
8500
006 LOADING DOCK
001
SHOWROOM
007 700m2
002
RL 8.900
C 008
RO
003
OF
OVE
8500
004
RHA
NG
009
D
201
2
010
LINE OF WALKWAY OVER ROOF ABOVE
011
204
A A
8500
1
202 2600 2400 2400 202
6200
3 BIKES 6 BIKES
012 026 027 4600
019 020 021 022 023 024 025 028 029
E 013
CARPARK
4 93 CARS 1
060
6200
EXISTING BUILDING 201 014 203
3 M.B. 15 BIKES COMMERCIAL
8500
061
RL 8.750
015 1600 m2
030 031 032 033 034 035 036 037 038 062
RL 8.900
F
016
ROOF OVERHANG
063
017 ROOF ABOVE
8500
COVERED WALKWAY
6200
ENTRY ARBOR /
018 064
039 040 041 042 043 044 045 046 047 065
G
1:22
066
203
6500
2
8500
067
048 049 050 051 052 053 054 055 056 057 058 059
4600
H
1:22
00
65
7000
PEDESTRIAN
COVERED
OAD
ENTRY
EXISTING FOOTPATH
1:25
I 6 BIKES
ER
WAY
GDRIVE
1:3
XISTIN
5
E M.B. 2 M.B.
VAT
ATH 068 069 070 071 072 073 074 075 076
FOOTP
TING
EXIS 2
301
SI LON
PRI
GN
PY
6500
RL 8.300
077 078 079 080 081 082 083
1
201
B
202
FUTURE TRANSIT CENTRE SITE
Rev Description Date CLIENT PROJECT TITLE DRAWN BY CHECKED BY DATE
E
B Preliminary Issue 17.11.25 KW SM 16.07.26
N
C Preliminary Issue 10.06.26
Suite 12, Level 2, 30 Florence St Proposed Commercial Centre GROUND FLOOR PLANS SCALE (@ A1) PROJECT NUMBER
Teneriffe, QLD 4005
D Draft DA Issue 18.06.26 1 : 250 25114
S
W
E DA Issue 25.06.26 [email protected] DRAWING NUMBER REV
MK Architecture Pty Ltd Copyright. Except under whats allowed under copy right law, no part of this drawing may be reproduced or otherwise dealt with, without written permission of MK Architecture Pty Ltd.
F DA Issue 09.07.26
G DA Issue 16.07.26
www.mkarchitecture.com.au Builder/Contractor shall verify job dimensions before any job commences. Figured dimensions take precedence over drawings and job dimensions. All shop drawings shall be submitted to the
Architect/Consultant, and manufacture shall not commence prior to return of inspected shop drawings by the Architect/Consultant. NC2 - M K A - A R - D R G - 101 G
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2. Amended Architectural Plans (Rec 27.7.26).pdfRelated documentApplication case desk ↗
About this file
- File size
- 48.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.