2017-09-12 P&E Agenda - Attachments 1, 2 & 3 to Item 8 - Local Government Infrastructure Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnWallace Park Master Plan Review Draft Report Feb 2013 SCRC
Short Term Short Term
cost at 2012 "Trunk" Items (2012 $)
$ 125,000 $ 125,000
$ 75,000 $ 75,000
$ 20,000 $ 20,000
$ 5,000 $ 5,000
$ 40,000 $ 40,000
$ 20,000 $ 20,000
$ 10,000 Maintenance / Not trunk
$ 25,000 $ 25,000
$ 1,000 $ 1,000
$ 30,000 $ 30,000
$ 5,000 Maintenance / Not trunk
$ 10,000 Maintenance / Not trunk
$ 15,000 Maintenance / Not trunk
$ 5,000 Maintenance / Not trunk
$ 30,000 Maintenance / Not trunk
$ 5,000 Maintenance / Not trunk
$ 10,000 Maintenance / Not trunk
tba
$ 431,000 $ 341,000
replacement estimate
Att 2_LGIP Public Parks & LCF - SOW (Amendment).xlsx Wallace Park MP Review Summary 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.