Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2020-11-19 Ordinary Meeting Agenda

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                             19 NOVEMBER 2020


2    PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT – 10 NOVEMBER 2020


ATTENDANCE & APOLOGIES
COUNCILLORS
Cr Brian Stockwell (Chair)
Cr Karen Finzel
Cr Tom Wegener
Cr Clare Stewart

Cr Amelia Lorentson (non-Committee Councillor – for reports 1 - 3; 5 - 6)

EXECUTIVE
D Iezzi, Acting Chief Executive Officer
A Dow, Acting Director Environment and Sustainable Development


COMMITTEE RECOMMENDATIONS TO COUNCIL

1    OPW18/0150.01 REQUEST TO CHANGE AN EXISTING APPROVAL FOR PRESCRIBED
     TIDAL WORKS - JETTY AT 21 WESLEY COURT, NOOSA HEADS
     That Council note the report by the Coordinator Engineering to the Planning & Environment
     Committee Meeting dated 10 November 2020 regarding Application No. OPW18/0150.01,
     request an Other Change to a Development Permit for Prescribed Tidal Works – Jetty situated
     at 21 Wesley Court, Noosa Heads, and:
     A.    Approve the change and agree to change Condition 1 as follows:

                Plan No.   Rev.    Plan/Document Name                                         Date

                S01        C2      Drawing Schedule & Transmittal prepared by Long View       12 June 2020
                                   Consulting Engineers

                S02        C2      Structural Notes Sheet prepared by Long View               12 June 2020
                                   Consulting Engineers

                S03        C2      Site Plan, Framing Plan, Elevations prepared by Long       12 June 2020
                                   View Consulting Engineers

                S04        C2      Jetty Framing Details prepared by Long View Consulting     12 June 2020
                                   Engineers

     B     Approve the change and agree to change Condition 6 as follows:
           No additional boatlifting devices are to be attached or moored at the jetty structure for
           the purpose of elevating a vessel above the water without Council approval.
     C.    Find the following matters relevant to the assessment and sufficient reason to approve
           the application:
           1.      The floating decks comply with the Overall Outcomes of the Watercourses Works
                   Code as the structures do not detrimentally impact upon the visual amenity of the
                   area or impact upon navigational access in the canal;
           2.      The jet ski boat lifting device is located within the jetty structure, is located directly
                   in front of the subject property and does not detrimentally impact upon the visual
                   amenity in the area or impact upon navigational access in the canal;
     D.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.

                                                                                              Page 5 of 23
Log in to download the original file

2020-11-19 Ordinary Meeting Agenda(PDF, 731KB).pdf · 749 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.