Skip to the record
Search everything, all in one place.

Original source · versioned page text

Meeting papers

of 528

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (150 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

                                  Figure 12 - SARA approved plan


3.3. Statutory Instruments – Planning Scheme
The subject site is located in Noosa Heads, with 94 & 142 Noosa Dr, Noosa Heads being a split
zoned Tourist Accommodation and Environmental Management and Conservation (EM&C). The
proposed short-term accommodation is identified as a consistent use in the Tourist
Accommodation zone and an inconsistent use within the EM&C zone. The application is required
to follow an impact assessable process and therefore must be assessed against the whole of
Noosa Plan 2020, to the extent the provisions are relevant to the development.


STRATEGIC FRAMEWORK
The Strategic Framework sets the policy direction for the planning scheme and forms the basis for
ensuring appropriate development occurs in the planning scheme area for the life of the planning
scheme. The Strategic Intent in the Strategic Framework includes the following statements:
     3.2 Strategic Intent
     3.2.2 A well managed and sustainable Noosa Shire
     This planning scheme seeks to maintain Council's long standing commitment to a
     sustainable population and well managed growth through firm Urban Boundaries,
     development densities and building heights. Unrestrained and unplanned development is
     resisted in Noosa Shire. Any unanticipated development requires demonstration of a high
     level of community need.
     3.2.5 Noosa's natural environment
     A network of habitat areas and linkages provide ecological connectivity from a wide cross
     section of ecosystem types and altitudinal ranges. These connecting habitat areas are shown
     on Strategic Framework Map SFM-4 - Biodiversity. A diverse network of wetlands is also
     present, of good ecological condition and encompassing over 16,000 hectares. This
     interconnected biodiversity network has strong adaptive capacity to endure the impacts of
     climate change and other emerging challenges because of the size and connectedness of
     protected areas and remnant vegetation. Management actions and land use planning

                                                                                  Page 12 of 38

                                                                                          Page 19 of 518
Log in to download the original file

43d079c065.pdf · 150 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.