Operational Initiative Operational Initiative
Polystyrene processing Annual textile drive
Outcomes Outcomes
Treatment and diversion of polystyrene waste from landfill Increased recycling and reduction in landfill
Progress Commentary for 1 July 2022 - 30 June 2023 Progress Commentary for 1 July 2022 - 30 June 2023
— Installed and running. Trial complete and contract awarded for supply and install of a larger processing machine. — Annual textile drive event held 5 June 2023..
Installation scheduled for August 2023.
Status
Status Completed
On Track and Ongoing
Undertaking feasibility studies and developing plans for new Waste infrastructure projects is incorporated in the
FY23/24 Operational Plan Resource Recovery Highlights
The implementation of the SEMP is incorporated in the FY23/24 Operational Plan
Operational Initiative — Noosa Shire generated 90,534 tonnes of waste with 47,558 tonnes (52%) diverted from landfill which is
Household recycling decontamination approximately 1.57T per person.
Noosa Council Annual Report 2022 - 2023
— We processed 5,954 mattresses by stripping and recycling them at our Resource Recovery Centre.
Outcomes — We are trialling a new ‘Container for Change’ reverse vending machine capable of separating cans and bottles.
Reduced contamination in recycle bins — Council has approved a new polystyrene compacting machine which will divert 50 tonnes from landfill each year.
— Smart bins were trialled in Noosa Heads, using solar energy to compact rubbish. Further trials are ongoing.
Progress Commentary for 1 July 2022 - 30 June 2023 — Bin Sensors installed to measure waste generation and improve collection cycles to reduce emissions.
— Waste contamination audits scheduled for July 2023.
Status
On Track and Ongoing
Undertaking feasibility studies and developing plans for new Waste infrastructure projects is incorporated in the
FY23/24 Operational Plan
Operational Initiative
Double grind green waste
Outcomes
Improved product quality
Progress Commentary for 1 July 2022 - 30 June 2023
— Ongoing.
Status
Completed
115
Page 419 of 518
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (43d079c065.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.