Operational Initiative                                                                                               Corporate Plan 2017-2037 Focus Area: 2.7 Plan for Noosa’s aging demographic and support our
Wallace House Wood Borer inspection                                                                                  health and aged care sectors

Outcomes                                                                                                             Operational Initiative
Preventative maintenance to ensure the structural integrity of the building                                          Community Support software upgrade

                                                                                                                     Outcomes
Progress Commentary for 1 July 2022 - 30 June 2023
                                                                                                                     Improved system with customer privacy controls and requirements met
— Council is discussing scheduling options with resident group.

                                                                                                                     Progress Commentary for 1 July 2022 - 30 June 2023
Status
                                                                                                                     — Software is now live and fully operational. The project is now complete.
Completed
                                                                                                                     Status
Operational Initiative                                                                                               Completed
Repaint Peregian Beach Surf Clubhouse
                                                                                                                     Corporate Plan 2017-2037 Focus Area: 2.8 Maintain the ability to respond to disaster events (LDMP)
Outcomes
Preventative maintenance to ensure the whole of life structural integrity and amenity of the building                Operational Initiative
                                                                                                                     Review of Noosa Local Disaster Management Plan (LDMP)
Progress Commentary for 1 July 2022 - 30 June 2023




                                                                                                                                                                                                                                           Noosa Council Annual Report 2022 - 2023
— Painting completed for the Peregian Beach Surf Clubhouse.                                                          Outcomes
                                                                                                                     Increased local area capability for prevention preparedness, response, and recovery in a disaster
Status
Completed                                                                                                            Progress Commentary for 1 July 2022 - 30 June 2023
                                                                                                                     — Noosa Local Disaster Management Group (LDMG) adopted the Noosa LDMP at the February 2023 meeting. The
                                                                                                                       new corporate branding is being applied to the Plan and should be available at the beginning of August. The Plan
Corporate Plan 2017-2037 Focus Area: 2.6 Explore options for and investigate the feasibility of relocating
                                                                                                                       will then be presented for adoption by Council at a future Council meeting.
the Noosa Regional Gallery

                                                                                                                     Status
Operational Initiative
                                                                                                                     Behind Schedule
Pre-Feasibility Study Noosa Regional Gallery (Stage 2 & 3)
                                                                                                                     The implementation of the LDMP has been incorporated in the FY23/24 Operational Plan Operational Plan

Outcomes
                                                                                                                     Operational Initiative
Options and scenarios for a new regional art gallery are analysed to assist Council in deciding whether to proceed
                                                                                                                     Support the community in the ongoing recovery efforts from the 2022 Floods
to a further stage in this project
                                                                                                                     Outcomes
Progress Commentary for 1 July 2022 - 30 June 2023                                                                   Increased community health and wellbeing
— Community engagement undertaken and analysis complete, Gold Coast & Tweed Gallery site visits complete,
  Councillor workshops held, evaluation criteria for options and potential sites finalised, internal stakeholder     Progress Commentary for 1 July 2022 - 30 June 2023
  consultation complete, site evaluation complete and final sites determined for business case, preparation work     — Community Recovery Officer commenced in November 2022
  for business case in FY23/24 complete.
                                                                                                                     — Social Worker commenced December 2022 at Pomona Community House (funding from PHN).

Status                                                                                                               — Black Mountain comms portal launched. Recovery survey results analysed. Recovery activities underway and
Completed                                                                                                              ongoing through FY23/24. Extensive work underway in reconstruction.

                                                                                                                     Status
                                                                                                                     Completed



                                                                                                                                                                                                                                           125
                                                                                                                                                                                                                              Page 424 of 518

Log in to download the original (43d079c065.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.