Projects Description Project Budget
Noosaville Landfill, Cell The project included the construction / expansion of a new $8.4M
2022 / 23 Completed Projects Expansion and Cell 1.1 waste Cell 1.1, Final Capping of the western batter of Cell 1.1
Capping Project (where waste operations have finished), and the construction
Each year, Council identifies several infrastructure projects that are critical to delivering on our Corporate Plan and
(Multi-year Project) of a new high efficiency sediment (HES) basin on the south
strategic vision for the Shire and community. For this financial year, several key projects were completed as outlined below.
of the site to treat rainfall runoff and make sure only clean
water is leaving the site. These works were critical to expand
Infrastructure Projects the landfill’s life expectancy and waste operations, as well
as part of Council’s levitative requirements for remediation,
Projects Description Project Budget and environmental protection requirements for operating the
landfill.
Kin Kin Wahpunga Lane Council delivered the Wahpunga Lane Bridge Renewal $3.0M
Bridge Renewal as part of the Bridge Renewal Program jointly funded by Noosaville Landfill, The project included the modification of the existing $301,000
the Australian Government and Council. The $3M project Outbound Weighbridge weighbridge office and the installation of an outbound
replaced the original timber bridge with a wider concrete weighbridge. The new outbound weighbridge improves the
single-lane bridge to meet current standards. processing capabilities of the landfill, improves the safety
The new bridge has a 100-year design life and will reduce of the public and helps to prevent traffic queuing out of the
long-term maintenance and operational costs. landfill onto Eumundi Noosa Road.
Noosa Council Annual Report 2022 - 2023
Sunshine Beach Metal Council replaced the existing metal skate ramp at Sunshine $350,000 Noosa Parade Upgrade This upgrade of Noosa Parade was funded by both local and $8M
Half Pipe Beach Skate Park with a new larger ramp, which features a state government and was a key project in Noosa’s Cycling
modern surface consistent with those used in competition. and Walking Strategy. The upgrade offers dedicated bike
The new ramp is also more resilient in Queensland’s climate lanes, widened paths, slower road speeds and improved
with the ramp surface more user friendly when wet or hot. lighting.
Bus Stop Program As part of the nineth year of Council’s annual Bus Stop $287,000 Cooroy Belli Creek Road A new two-lane concrete bridge was completed replacing the $1.3M
Program, five bus stops around the Shire were upgraded to be Bridge original 9.7 metre timber bridge, built in 1929. The new bridge
compliant with the Disability Discrimination Act. The upgraded is wider, safer, and stronger, having been constructed with a
stops in Noosaville, Peregian Beach, Pinbarren and Tewantin 100-year life design to reduce long-term maintenance and
were also fitted with the new ‘Noosa Style’ shelter. operational costs.
This year’s program was partly funded by Translink who The Australian Government contributed $450,000 to the
contributed to funding 50% of civil upgrades and $19,000 per construction costs of this project, through the Bridges
shelter. Renewal Program.
Federal Middle Creek A two-kilometre section of Middle Creed Road received a $1.55M Kin Kin Recreational Hall Building remediation work on the Kin Kin Recreational Hall $230,000
Road Reconstruction much-needed upgrade, which was fast tracked in response – Remediation Building has been completed, including restoration of the internal VJ
to the Black Mountain landslide. The section of road now has Works cladding and flooring, a re-fitout of the existing community
a stronger base and better flowing table drains, providing a kitchen, electrical and lighting work throughout, and the
safer environment for road users. removal and prevention of the Microbat Guano.
The project, with a total cost of $1.55M, was funded through
the Federal Government’s Local Roads and Community This project was funded by the Queensland Government’s
Infrastructure (LRCI) Phase 3 Grant ($1.29M) and Road South East Queensland Community Stimulus Package in
Betterment funding ($260,000) through the Queensland association with Noosa Council.
Reconstructive Authority (QRA).
147
Page 435 of 518
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (43d079c065.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.