Council archive · source document
Meeting papers
Very large file (150 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 490, section 1. The text section number identifies this passage in the reader.
Note 15. Property, Plant and Equipment (continued)
Index applied
Last (change in index Other interim
Valuation comprehensive Key assumptions and estimates last applied to revaluation
Asset Class and Fair Value Hierarchy approach valuation date Valuer engaged (related data sources) asset class) adjustment
Land (Level 3) Current 30/06/22 APV Valuers and No observable active market - (i.e land Queensland Nil
2023: $175.1m replacement cost Asset utilised for footpaths, access restriction Government
2022: $175.1m Management purposes or has a volumetric title). Statistician's
Land sales are analysed and compared Office Land
taking into account area, location and Development
other general site characteristics. Activity Profile for
The hypothetical development approach Noosa Shire
is used for land which is specialised in (Median
nature and where no comparable land Residential Sale
sales are available. Price)
Noosa Council Annual Report 2022 - 2023
Most Recent
Index Applied:
15.2% -
equivalent to 2
years movement
(2021)
Buildings (Level 3) Current 30/06/2020 Australis Asset No active market due to the specialised ABS Producer Nil
2023: $72.2m replacement cost Advisory Group nature of the assets and the services Price Index: 3020
2022: $70.6m local government buildings provide. Non-residential
Valuations are determined using unit building
rates for construction taking into construction,
consideration industry standard cost Queensland
guides, project costs from recently Most Recent
completed buildings. Index Applied:
Other inputs to cost, useful life and 5.3% equivalent to
remaining life include economic value, 1 years (2023)
legal and commercial obsolescence,
industry standards, asset condition and
consumption rating applied. All buildings
are separated into different components
with value determined based on a range
of interrelating factors. i.e. sub-structure,
superstructure, roof, electrical and
lighting, fitout and fittings, fire services,
HVA, mechanical and security services.
continued on next page ... Page 29 of 56
256 257
Page 490 of 518
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Meeting papersMeeting papersMeeting 180 ↗
About this file
- File size
- 150 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.