TODR

engineers & project managers

STORMWATER MANAGEMENT REPORT

Address: 61 Elanda Street, Sunshine Beach
Applicant/Client: Bev Jenner Constuctions

1. Background

Tod Consulting have been engaged to provide technical advice on the impacts of a proposed
development at 61 Elanda Street, Sunshine Beach. It is proposed to construct a duplex on the site. Tod
Consulting were also involved with a previous application for a similar development on the site in 2017.
As part of the previous application a Stormwater Management Plan (SWMP) was prepared by Aquaintel
Pty Ltd.

As the new Application is very similar in nature (and size) as the previous application that was approved
by Council it is proposed to undertake a catchment comparison with the original SWMP to guide the
detention requirements for this Application. Note that we have been in contact with Aquaintel and they
have no objections to us doing this.

2. Catchment Comparison & Recommendation

As outlined in the attached tables and marked up plans there has been a minor increase in the southern
catchment compared to the previous application. As the change is in the order of 10% it is proposed to
increase the number of Atlantis Tanks on the southern side from 10 to 12 double tanks. Note that this
report along with Aquaintel’s original SWMP will be provided to the building hydraulics consultant to
ensure compliance with the requirements outlined in these two reports.

This report should be read in conjunction with Aquaintel report dated 3 August 2017 (copy attached),
the attached plans and tables prepared by Tod Consulting and Tod Consulting drawing reference 18505
— C001

Prepared by

So

Doug Reynolds (RPEQ 9072)
Tod Consulting Pty Ltd
26 February 2018
Full text of the other 21 pages

Page 2

17623 - 135 Lake Weyba Drive — Engineering Report — Rev B

TODR

engineers & project managers

61 ELANDA STREET SUNSHINE BEACH

Comparison of new development catchments to original catchments in Aquaintel SWMP

JIN - 18505

Original Development - SWMP by Aquaintel

Table 1 from SWMP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WBNM Sub-catchment Area(m2) | Developed Scenario} equivalent
Impervious % impervious area
(m2)
Roof (to street) 90 100% 90
Roof 130 100% 130
Drive to Rear 36 100% 36
North East Grass 70 50% 35
North side 59 50% 29.5
South Side 65 50% 32.5
Backyard 56 10% 5.6
Total to rear 268.6 m2
spilt - north (60%) 161.16 m2
split - south (40%) 107.44 m2
New development catcments
Tod Sub-catchment Area(m2) | Developed Scenario] equivalent
Impervious % impervious area
(m2)
Roof (to street) 90 100% 90
Roof - north 68 100% 68
Roof - south 59 100% 59
Drive to Rear - north 62 100% 62
Pool deck area - south 50 70% 35
North side 45 50% 22.5
South Side 48 50% 24
Backyard 56 10% 5.6
Total to rear 276.1 m2
Split - north 155.3 m2
fu kK, Split - south 120.8 m2

Page 3

, ft ae
D Reynolds
PREQ 9072
26-Feb-18

CHANGE

-5.86 m2
13.36 m2

North
South

©

 

oe
|

 

_ STTEBOUNDARY 33551 89°58'10"

 

 

 

 

 

 

 

   

 

 

 

 

 

a:
115.084 0°00'00"

 

 

 

 

 

 

 

 

 

feem

 

ITE BOUNDARY 1

 

 

 

CARO eet

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

\ oN ~ 1
& \ |
{ |
So
'
| |
Ot | carace LEVEL eLAN
= [1:10 AT a3
curent progecr DRAWING DATATL
claire 61 Elanda street 200.01) TITLE Plan
Wade Jenner Sunshine Beach 0 4567 = AREA Garage Level
Tot 408 on RPABI12 Scate 1:100 aT Aa

  

‘STE BOUNDARY 3.551 269°56'10"

pmo
 -‘TODR

consulting engineers
PO Box 61, Noosaville Q 4566

www.todconsulting.com
D. rrncws

RIER FoF

GOCKEL ARCHITECTS
8/729 Brunswick Street
New Farm Queensland 4005
waw.gockel.com.au

DATE
PHASE,
DRAWN

#X-02-2018
Design Development
DLG

Page 4

O

    
   

oe eee

 

|
TD SP18B179 60 8
1
|
i

is

|

|
| |||
| STEBOUYDARY3355186°55'10" | {.

   

\
~ + mama 3500 ~

1 |

4. TOOR

-—+-
|
|

 

ie cal, consulting engineers

Mt: .

D. PO Box 61, Noosaville Q 4566
RES YOR www.todconsulting.com

CLIENT PROJECT ‘DRAWING DETAIL GOCKEL ARCHITECTS

Claire & 61 Elanda Street TITLE Plan DATE ‘XX-02-2018 8/729 Brunswick Street

Wade Jenner Sunshine Beach Q 4567 AREA Terrace Level PHASE Design Development Now Farm Queensland 4005

Lot 408 on RP4Si12 SCALE 1:100 AT A3 DRAWN DLG www. gockel.com.au

 

 

Page 5

aqua

Debbie Munro
Ziganairre Pty Ltd

by email
3 August 2017
61 ELANDA STREET, SUNSHINE BEACH — STORMATER QUANTITY ASSESSMENT

Dear Debbie,

Aqualntel have been commissioned by Ziganairre Pty Ltd to undertake a stormwater quantity assessment to
address an Information Request by Noosa Shire Council dated 13 July 2017 (OPW17/0225) for the proposed
development at 61 Elanda Street, Sunshine Beach. During this investigation discussion with Noosa Council were
undertaken in order to seek clarification on the intent of the development conditions and on the status of the
legal Point of Discharge for the site. It was advised that stormwater could be discharged to the street as long as
the maximum rate at which it was discharged is limited to the requirements of the conditions and that if runoff
cannot be directed to the street then stormwater must be infiltrated underground in order to minimise any
potential issues with stormwater flows increasing into neighbouring properties as a result of the development.

SITE AND CATCHMENT

The proposed site is located at 61 Elanda Street, Sunshine Beach. An existing residence is located on the
western portion of the site. Currently stormwater is discharged to the ground within the site.

The total site area is 505 m’ and the site falls to the east at a grade of approximately 12.5%. Stormwater runoff
would currently flow overland towards the rear of the property at the South East corner of the site. No
evidence of a formalised stormwater infiltration system has been located. Total catchment area assessed is
600m? which includes the site and rear falling verge.

Of this catchment 90m? of roof will be discharged to the Elanda Street. The development conditions for the site
specify that a maximum flow of 25L/s at any one location is to be discharged to the road, of which it understood
that the development complies with this condition.

The catchment is shown below in Figure 1.

m: 0439 119 890 t: +7 5414 7185

e: [email protected]
Ww: www.aquaintel.com.au

Page 6

 

aquaintel

 

Figure 1: Stormwater Catchment Plan

STORMWATER QUANTITY
Calculation of Flows

The objective of this study is to calculate the stormwater flows generated from the proposed development and
to size infiltration tanks / trenches to cater for the likely flows that cannot be discharged to the Street.

Hydrologic modelling has been carried out using the WBNM software for the 2, 5, 10, 20, 50 and 100 year ARI
storm events. Calculation of flows has been completed for the proposed developed case. As it is the objective of
the development to ensure runoff is infiltrated prior to leaving site to the rear there was no need to investigate
non-worsening of peak flows and thus no need for comparison with existing conditions.

An assessment was completed on the current site layout defined in the hydraulic services plans by lan Bradford
Plumbing Consultants (20/06/2017). These plans have highlighted that 90m? of the site can be directed to the
street. To be conservative in the infiltration sizing it has been assumed that the remainder of the site will be
directed to one of the two proposed infiltration locations.

The contributing catchment of 505 m? has been represented using six sub-catchments being the Front Yard,
Driveway, North East Grass, Roof (both roof areas combined) and Backyard areas. The catchment layout is
m: 0439 119 890 t: +7 5414 7185

e: [email protected]
Ww: www. aquaintel.com.au

ntelliqent Water Management Solutions

Page 7

aqua

shown in Figure 1. The sub-catchment areas and fraction impervious values for the catchments are tabulated
below in Table 1.

Table 1: WBNM Sub-Catchment Areas and Fraction Impervious Values

 

 

 

 

 

 

 

 

 

WBNM Sub-Catchment Area (ha) aap eC

Roof (to street) 0.009 100%

Roof 0.013 100%
Drive to Rear 0.0036 100%

North East Grass 0.007 50%
North_side 0.0059 50%
South_side 0.0065 50%

Backyard 0.0056 10%

 

 

 

 

The WBNM model has been validated with comparison of peak flows derived using the Rational Method and a
reasonable agreement was achieved. The WBNM model adopts a catchment lag parameter of 1.6, which is
within the accepted range of values provided in the WBNM technical reference manual. The rainfall loss rates
adopted for this investigation are an initial and continuing loss of Omm and 2.5mm/hr for pervious, and Omm

and Omm/hr for impervious.

Peak flows tabulated below in Table 2 represent the developed peak flow for each design storm event with the
critical duration varying from 5 to 15 minutes (5 minute for 100 year). Output summary provided in Attachment
1.

Table 2: Developed Scenario WBNM Peak Flows

 

 

 

2yr ARI Syr ARI | 10yr ARI | 20yr ARI | SOyr ARI | 100yr ARI
Catch it
ae (m*/s) | (m/s) | (m/s) | (m?/s) | (m/s) | (m°/s)
To Street 0.004 0.005 0.005 0.006 0.007 0.008
To Rear 0.019 0.023 0.026 0.029 0.033 0.037

 

 

 

 

 

 

 

 

 

Infiltration Trench Sizing

Discussion with Noosa Council (pers. Comm. Mark Lewis, 31 May 2016) indicated that the development would
need to demonstrate that runoff to the rear of the property for all but the most extreme rainfall events would
be infiltrated on-site so as not to cause scour or slope instability on adjacent properties. As such it was
determined that an infiltration trench or trenches would need to be sized to cater for the infiltration of all
design events up to and including the 1% AEP (1 in 100 year ARI design event).

m: 0439 119 890 t: +7 5414 7185

e: [email protected]
Ww: www.aquaintel.com.au

Page 8

aqua

The site is located on a beach dune. Although the geotechnical information provided by Global Testing Pty Ltd
(refer Attachment 2) did not provide an infiltration rate for the saturated hydraulic conductivity of the in-situ
sands, previous work in the area and empirical values for soils in this area indicate a saturated hydraulic
conductivity at the site were likely to be a minimum of k=2.56 x 10° m/s (9216 mm/hr). All calculations within
this document are based on this value. No information as to the depth to groundwater was available and it is
assumed that the base of infiltration trenches can be located at least 1.0 m above the seasonal high water table.

The methodology for the design of infiltration trenches is contained within “The WSUD Technical Design
Guidelines for South East Queensland” was adopted for this project. Chapter 7 of these Guidelines outlines two
alternate methodologies for the sizing of trenches being; the Hydrological Effectiveness Method and the Design
Storm Method. Calculation by both methods was undertaken for comparison.

The Hydrological Effectiveness Method aims to size an infiltration trench such that a specified proportion of the
mean annual runoff volume will infiltrate into the soil profile. The guidelines provide a series of design curves
based on an idealised tank/trench layout for estimation of trench size. Based on the geotechnical information
provided and an assumed trench of 0.9 m deep and 0.8m wide (porosity = 0.95 being an Atlantis Flo-Tank). This
assumes a system that the double tank system and 2 cells wide. Figure 7-7 of the Guidelines indicates that a
trench with an area equal to 1.5% of the catchment area would achieve a hydrological effectiveness of 100%.
That is, an infiltration trench with an area of 1.5% of the catchment and 1 m deep would infiltrate 100% of the
mean annual runoff from the site.

The alternate method for infiltration tank sizing is the Design Storm Method. As determined above the design
objective is to capture and infiltrate up to a 1% AEP (1 in 100 year ARI design event) runoff volume. This method
sizes a required detention volume based on the following:

- the volume of runoff from the catchment during the design event;
- the saturated hydraulic conductivity of the in-situ soil/sand; and
- the dimensions of the proposed trench including the length, width and height of the trench.

The required detention volume is the difference between the volume of runoff from the catchment and the
volume that can be infiltrated during a rainfall event.

From the hydrologic model outlined above the volume of runoff from the proposed lots was calculated (using
the WBNM model output) for the 1% AEP event.

Table 3 shows the calculated infiltration requirements and the number Atlantis Flo-Tank (double) to cater for
these infiltration requirements. Detailed calculations are provided in Attachment 3.

Table 3: Required Infiltration — Atlantis Flo-Tank (Double — 2 cells wide)

 

 

 

Volume Based on | Volume Based on Required
WBNM Sub- Area (ha) Hydrological Design Event Rai onc No of Atlantis
Catchment Effectiveness Method (m’) 2 Flo-Tank (Double)
Method (m?) (vd) np
Site (excluding
area draining to 0.0416 6.24 5.77 6.42 25
road)

 

 

 

 

 

 

m: 0439 119 890 t: +7 5414 7185

e: [email protected]
Ww: www.aquaintel.com.au

 

Page 9

aqua

It can be seen from Table 3 that the Design Storm Method results in marginally larger trench sizes and thus
these sizes are recommended for use on this site. The hydraulic services design has nominated two location for
the infiltration systems with one being located near the northern and southern boundaries at the rear of the
house. A flow split has also been nominated with 60% of the flow going to the northern system and 40% going
to the southern system. The following is infiltration system is recommended for the southern and norther
system:

e Southern System — 10 x Atlantis Flo-Tanks (double) (w) x 0.90m (d) x 3.4m (I)

e Northern System — 15 x Atlantis Flo-Tanks (double) (0.82m (w) x 0.90m (d) x 5.5m (I)

It is noted that there is a 3m Unity Water sewer easement in the property. It is understood that Unity water
may in some circumstances allow the infiltration trench within the easement however Unity Water would need
to be consulted.

CONCLUSION

Based on the methodology contained within the “The WSUD Technical Design Guidelines for South East
Queensland” and the geotechnical information available for the site it is recommended that a minimum
infiltration area and volume as provided in Tables 3 be installed within the development to prevent water
leaving the site. This volume and area could be accommodated by a total of 25 x Atlantis Flo-Tank (Double).

| trust this assessment of stormwater management requirements for your development meets your needs. Feel
free to contact me should you wish to discuss any of the content in this letter.

Yours faithfully,

Kelly McKendry ,

Water Resources Engineer / Director (RPEQ 09298)
Aquaintel Pty Ltd

Attachments

1. Hydrologic Calculations
2. Geotechnical Information
3. Trench sizing calculations

m: 0439 119 890 t: +7 5414 7185

e: [email protected]
Ww: www.aquaintel.com.au

Page 10

ATTACHMENT 1: Hydrologic Calculations

 

s iWBNM Lite
G

   

 

prj [ 2015007

Projact Deserpten
Project Locaton

 

 

 

rT om
Elanda St, Sunshine Beach

Choose Rain Gauge trom Database ‘Add to Database: Name naa

 

Lag Parameter (©)
Stream Lag Factor
Caleation Temostap

Tewantin

 

Int Lows
Continuing Lous Rate

 

 

 

Subarea oo DFact Tyee Elevation Storage
(actyara [Lo [7 J. owner] I 1 A m
wow : Peston ni

       
 

Divers to Sub Wars to Su]

 

(Cows er fy eve.)
Length
aich-F acter Dia
Directed algo
Detay jin} isch Factor

Drrectes to

 

Belay (min

Save & Run | Shorteut: Shift + Ctr + L

Most Recent File: 0:\W oki2015007_61 Elanda St SWAIP\O05_WENM_newiDOO%L, vi.won
Full Pam for WENMRun exe: G Water Recources\Pragyrams\W BNM.2012_ euacutatieaWBNMAn oxo

 

 

      

      

    

 

 

 

  

 

stom 1 2 3 “ s . 7 .
tyet8Min [ZW t8Min | BWt8Min | 1oveemin | a0 e1EMm | BOY Emin 10 Ye 5 iin
Peak Flomrates at Subares Out ms
neat| 0.003 0 0007 0.008
Ress) 0.003 0.0 0.008
Rost 0.010 0.011
FY Aree 006 0.006
Northside 3 005 9.005
South site 03 0.004 0.006 0.006 0
Deve 00 0.003 0.003 0.013 =
sacayars 023 033 0.037 136 ;
i
5
tntow Peak! 0.015 19 0 0 6033 003 0436
0.136
nie 6 " ; 76 0 le
vr v T T T T T T 4
ax Waterlev 0.0 047 058 066 00: 085 9.094 l=

 

‘Time [mins]

m: 0439 119 890 t: +7 5414 7185

e: [email protected]
Ww: www.aquaintel.com.au

Page 11

aquaintel

ATTACHMENT 2: Geotechnical Information

m: 0439 119 890 t: +7 5414 7185

e: [email protected]
Ww: www.aquaintel.com.au

Intelligent Water Management Solutions

Page 12

GLOBAL TESTING

 

 

 

 

 

 

 

 

 

THE ONLY NAME IN SOILS

QBCC Licence No. 1018403
PH : 07 54 740 900
3/53 Gateway Drive, Noosaville 4566

JOB NUMBER 15/1054 SITE CLASSIFICATION REPORT

CLIENT ZIGANNAIRE PTY LTD

SITE LOCATION | PROPOSED DUPLEX,

61 ELANDA STREET, SUNSHINE BEACH
REPORT DATE _| 21/10/2015
INTRODUCTION

The purpose of this report is to classify the subject allotment in accordance with Australian Standard
2870 - 2011 ‘Residential Slabs and Footings'. From this classification a footing system can be
recommended for the structure so as to allow adequate performance of the footings under the soil
conditions determined at the site.

Trees: There are several small to large trees on and adjacent to the proposed site. Global
Testing recommends an experienced arborist be commissioned to quantify the existing size,
location, predicted maximum height and type of these trees to aid in the design process. It is the
responsibility of the designing engineer to apply the principals of AS2870-2011 Appendix H
"Guide to Design of Footings for Trees" . The classification herein excludes the effect of trees on
the site.

Please note: The site has an existing residence which is to be removed.

SITE DESCRIPTION

 

Type of Allotment

Residential

 

Vegetation (Building Envelope)

Grassed/Scattered small to large sized
mature trees

 

 

 

 

 

 

Vegetation (Allotment) Grassed/Scattered small to large sized
mature trees

Road Status Sealed

Slope 7-9% to the Rear

Surface Water will Drain Towards Rear

Will Surface water from adjoining May

allotments traverse this site

Does the site have any watercourses No

 

Surrounding Allotments

 

 

 

 

 

 

 

Left Existing Residence
Right Existing Residence
Rear Existing Residence
Depth to Weathered Rock N/a
Depth to Water Table N/a

 

SITE CLASSIFICATION AND TARGET STRATA

 

Based on the findings of the site investigation, the classification of the site is considered to
conform to:-

CLASS “ P ” (Due to poor bearing capacity, the presence of trees and

the removal of an existing residence - Piering Required)
(PLEASE NOTE: If not for the poor bearing capacity and trees encountered and the removal of an
existing residence, this site would have the characteristics of an 'S' site)
in accordance with Australian Standard 2870 - 2011, 'Residential Slabs and Footings,
Construction’.

Page 13

1PO/1U54 Fage |

The target stratum for the foundation of the structure at location BH1 is the SAND at a
depth of 800mm below existing ground level.

The target stratum for the foundation of the structure at location BH2 is the SAND at a
depth of 1300mm below existing ground level.

It is the designing engineers responsibility to address the potential influence of any trees
present on or around the proposed building site.

If any fill is placed over the existing ground, the structure shall be piered through the fill
into the existing material. Further note that the placement of reactive material as fill, or cutting
of the site may change the site’s classification.

SOIL PROFILE
Refer to Soil Profile Report for borelog information

Whilst every effort has been made to ensure that the borelogs carried out at the subject
allotment are indicative of the soil profile over the site any discrepancy between the profile
detailed in the borelogs and that observed during construction shall be referred to Global
Testing for immediate attention.

MATERIALS LABORATORY TEST RESULTS

Soil Laboratory testing was not carried out on samples of the soil taken from the site because the clay
content of the material was too low for Shrink-Swell movements to be critical in the classification of
the soil profile. Determination of the classification for the site in this situation is based upon results
from Dynamic Cone Penetrometer testing performed over the site.

 

 

 

 

 

 

 

 

 

 

 

BOREHOLE n/a
DEPTH RANGE OF SAMPLE n/a
LIQUID LIMIT n/a
PLASTIC LIMIT n/a
PLASTIC INDEX n/a
LINEAR SHRINKAGE n/a
INSTABILITY INDEX n/a
SHRINK SWELL INDEX Jss n/a
PREDICTED SURFACE MOVEMENT n/a

 

 

Please note that the Plasticity Index (PI) determined by the Atterberg Test may be correlated to an
Instability Index (Ips)with reference to the results of extensive testing carried out by others, notably,
Dr P Mitchell, ‘Footings for Small Scale Domestic Structures, "March 1990.

Yours Sincerely,

MICH ART PINKNEY (1 ahorataryv Manager)

Page 14

 

15/1054 Page 2

LIMITATIONS

Recommendations given in this report are based on the information supplied by the client regarding the
proposed building construction in conjunction with the findings of the investigation. Any change in
construction type, building location or omission in the client supplied information, may require additional
testing and/or make the recommendations invalid.

The recommendations herein identify a target soil stratum into which the footings are to be founded. The
target stratum has been located by the depth in mm of the target stratum's upper horizon boundary below
the existing ground surface level at the time of the site investigation. Any cutting or filling works and any
surface erosion or deposits subsequent to the site investigation, will alter the measured location of the
stratum relative to the surface. Where required, the author should be notified in such cases to confirm the
location of the target stratum.

The description of the soil given in the Soil Profile section of this report is intended as a brief overview of
the soil's primary constituents. For a detailed classification of the soil, the reader should refer to the Soil
Profile Reports and/or Borehole Reports attached to this report.

Every reasonable effort has been made to locate the test sites so that the borehole profiles are
representative of the soil conditions within the area investigated. The client should be made aware
however, that exploration is limited by time available and economic restraints. In some cases soil
conditions can change dramatically over short distances, therefore, even careful exploration programs may
not locate all the variations.

If soil conditions different from those shown in this report are encountered or are inferred from other
sources, then the author must be notified immediately.

This report may not be reproduced except in full. The information and drawings provided with this report
shall only be used and will only be applicable for the development shown on the client supplied
information provided for this site.

Any dimensions, contours, slope directions and magnitudes shown on the Test Locality Plan shall not be
used for any building construction or costing calculations. The purpose of the plan is to show approximate
location of field tests only.

Any changes made to these recommendations by persons unauthorised by the author will legally be
interpreted as that person assuming the responsibility for the long-term performance of the footing system.

The recommendations contained in this report have not taken into consideration the long term effects of
any previous, current or potential subsurface work by mining companies or potential slope instability
problems. At the time of writing this report neither our client (nor his agent) nor the local authority had
made the author aware that these problems may be affecting this allotment. If a mining subsidence or
slope stability assessment is required for this allotment, the recommendations of a suitably qualified
geotechnical engineer should be sought.

Page 15

 

15/1054 Page 3

GLOBAL TESTING

 

THE ONLY NAME IN SOILS

SOIL PROFILE REPORT

CLIENT:

PROJECT:

Zigannaire Pty Ltd

BY:
61 Elanda Street,
Sunshine Beach JOB NO:

AUTHORIZED

DATE TESTED:

Deb Macnaught

20/10/2015

15/1054

 

Drilling Method: Jacro 105 100mm.

Borehole
No: 1

 

Depth
(mm)

Description

PENET.

(blows per 100mm)

 

1

2) 3/4

Est. Bearing
Capacity
(kPa)

 

 

100

 

200

 

300

 

400

 

500

 

600

 

700

 

800

 

900

 

1000

 

1100

 

1200

 

1300

 

1400

 

1500

 

1600

 

1700

 

1800

 

1900

 

2000

 

2100

 

 

2200

 

 

me ma

SAND (SP) - Fine to medium grained,
brown, moist, loose.

SAND (SP) - Fine to medium grained, grey,

moist, medium-dense.

Hole Terminated.

 

 

 

 

 

 

 

 

WW PYIMPMPM]MHlMlry

 

Ww

 

 

 

 

 

 

HLH] wl w]w]w

 

 

 

 

 

 

 

 

 

 

 

 

 

100

125

 

Page 16

aJIUU

 

2400

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2500
15/1054 Page 4
THE ONLY NAME IN SOILS
SOIL PROFILE REPORT
CLIENT: Zigannaire Pty Ltd AUTHORIZED Deb Macnaught
BY:
PROJECT: 61 Elanda Street, DATE TESTED: —= 20/10/2015
Sunshine Beach JOB NO: 15/1054
Drilling Method: Hand Auger 100mm. Borehole
No: 2
Depth Description (blows per 160mm) Est. Bearing
(mm) Capacity
1] 2 73 ]4 (kPa)
0 SAND (SP) - Fine to medium grained, grey,
moist, loose.
100 0.3 10
200 0.3
300 0.3
400 1 30
500 1
600 2
700 1 30
800 2
900 1
1000 SAND (SP) - Fine to medium grained, pale 1 30
grey, moist, loose.
1100 2
1200 2
1300 SAND (SP) - Fine to medium grained, pale 3 100
grey, moist, medium-dense.
1400 3
1500 Hole Terminated. 3 100
1600
1700
1800

 

 

 

 

 

 

 

Page 17

 

 

1900

 

 

2000

 

 

2100

 

 

2200

 

 

2300

 

 

2400

 

 

 

 

 

 

 

 

 

2500

 

15/1054 Page 5

GLOBAL TESTING

THE ONLY NAME IN SOILS

 

TL sis

 

 

Page 18

 

Site — 61 Elanda Street, Sunshine Beach

15/1054 Page 6

GLOBAL TESTING

THE ONLY NAME IN SOILS

Test Locality Plan

 

 

 

3m high
trees

LEGEND
- BH - Borehole Location

- PT - Percolation Test

Me -Trees

 

@ PN - Dynamic Cone Penetrometer Location

 

Me 4m high
tree

e™ high
tree

 

 

en high een high
We", high tree tree

tree

9%

8m high
| slope

t
hen high 9 “* We
tree
He 8m high
tree
BH2

8m high PN2
tree 35 wk 1m high
he! mhigh tree
tree

wo.
e-»

3m high
trees

 

 

Page 19

2m high
tree

8m high 3
tree

 

2m-

Existing Residence
(to be removed)

5-6m high palms

 

; a J _¢ 3m

1m high bushes

 

 

7m high
tree

 

 

Elanda Street

Not to Scale

 

dimensions in metres UNO

 

Note: Any dimensions, contours, slope directions and magnitudes shown on the plan shall not be used for any building
construction or costing calculations. The purpose of the plan is to show the approximate location of the field tests only. All

 

 

Zigannaire Pty Ltd
61 Elanda Street,
Sunshine Beach

Job No. 15/1054
Date Tested : 20/10/2015
Authorised:- Deb Macnaught

Page 20

aquaintel

ATTACHMENT 3: Trench Sizing Calculations

m: 0439 119 890 t: +7 5414 7185

e: [email protected]
Ww: www.aquaintel.com.au

Intelligent Water Management Solutions

Page 21

 

[Calculation of infikration Area
| Methodology following WSUD Guidelines for SEQ calculated

Goal Seek to Zero

Project Number: 2014019
Project: Elanda Street infiltration

 

[Permeability Estimates provided by Geotechnical Investigations

 

 

 

 

 

 

 

 

 

 

 

mis mms mine 11 ene ee act gn
Ueber uit Permeabity 1.00601” .006+02 "360000
Lower iit Permeability 26603 2566.00 9216
Design Event Method Tivoli Heciveness Method
vin Rational Method Q100 xt) 1144902 ma
‘Adopted Hydrological Eteciveness# 100% (1 100% ofthe mean annua runt i nftated)
100 Volume trom Want tims From Figure 7-7
Porosity ffi in trench (0.35 for gravel 1.0 empt ass Catchment Area Required © 150%
|W 0.80 m 2x Double Flo-Tanks (side by side) [Catchment Area (ha) Infiltration Volume (m3)
t= 803 m caleated rom Aint Rare 0025 375
a= 09 m Double Fo-Tank lt ess to street) ous 624
i 27m caleate rom dimensions
ue as from Table 7-6
be Sins 0108333333 br
von sa from €gn72 nitration MyeoloieEflectnenets (Dept # tm, Porosity 1.0)-Nambour
fan7.2intofon73
\Vd = S77 JAtlantis Flo-Tank (double) # 2s}
nda Save Goal Seek or es Tare tas Fo-Tank(doutle)® 23
Goat seek 00
Xe
Voefaeofr-s)] ese?
se $} a yaten72

 

= eto velume or stom dation D) tr)
saute byte conucthty bron a proven St 1.

‘= etteton we i)

-spereter gino herein wea =)

= deg of the ttn syste

= shy contctity moderating ttre Tbe 7.8

“stom auton Pel

Thus te regu deters vane (iy aebanen sytem canbe corente a fli.

eesvegs

qin 73

 

‘reid etertion cura)
eon cae
tow weiner)
= porony hid 1 geet 038)

“%

‘it 28 oserston Fair to Caner Pott ml Consicses her ngars Au 2008)

 

 

 

 

 

 

 

 

 

Stas etme ee a Tel Catena Aa

Rese? voaege maces Dea St tr Wat Senate aN Ca ge may =

 

 

Page 22

Used in these records

About this file

File size
8.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Att 3b - Stormwater.pdf · 8.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.