2404-40124 SRA - Response with conditions (MCU24_0044 and OPW24_0045) · MCU24/0044
RA6-N SARA reference: 2404-40124 SRA Council reference: MCU24/0044 & OPW24/0045 Applicant reference: 04874 27 May 2024 Chief Executive Officer Noosa Shire Council PO Box 141 Tewantin QLD 4565 [email protected] Attention: Mark Lewis Dear Sir/Madam SARA referral agency response—13 Dolphin Crescent, Noosaville (Referral agency response given under section 56 of the Planning Act 2016) The development application described below was confirmed as properly referred by the State Assessment and Referral Agency (SARA) on 1 May 2024. Response Outcome: Referral agency response – with conditions Date of response: 27 May 2024 Conditions: The conditions in Attachment 1 must be attached to any development approval Advice: Advice to the applicant is in Attachment 2 Reasons: The reasons for the referral agency response are in Attachment 3 Development details Description: Development permit Operational work for prescribed tidal works (pontoon) SARA role: Referral agency SARA trigger: Schedule 10, Part 17, Division 3, Subdivision 1, Table 1 (Planning South East Queensland (North) regional office Level 4, Foundation Place 3 South Sea Islander Way, Maroochydore Page 1 of 7 PO Box 1129, Maroochydore QLD 4558
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
2404-40124 SRA
Regulation 2017) - Operational work that is tidal works or work in a
coastal management district
Schedule 10, Part 17, Division 3, Subdivision 1, Table 2 (Planning
Regulation 2017) - Operational work that is tidal works or work in a
coastal management district
SARA reference: 2404-40124 SRA
Assessment manager: Noosa Shire Council
Street address: 13 Dolphin Crescent, Noosaville
Real property description: Lot 74 on N10573
Applicant name: Michael & Sandy Guthrie
Applicant contact details: C/- The Jetty Specialist
18 Ron Parkinson Cres
Corbould Park QLD 4551
[email protected]
Human Rights Act 2019 A consideration of the 23 fundamental human rights protected under
considerations: the Human Rights Act 2019 has been undertaken as part of this
decision. It has been determined that this decision does not limit
human rights.
Representations
An applicant may make representations to a concurrence agency, at any time before the application is
decided, about changing a matter in the referral agency response (s.30 Development Assessment
Rules). Copies of the relevant provisions are in Attachment 4.
A copy of this response has been sent to the applicant for their information.
For further information please contact Ruth Creffield, Senior Planning Officer, on 5352 9775 or via email
[email protected] who will be pleased to assist.
Yours sincerely
Danika Cowie
Principal Planning Officer
cc Michael & Sandy Guthrie, [email protected]
enc Attachment 1 - Referral agency conditions
Attachment 2 - Advice to the applicant
Attachment 3 - Reasons for referral agency response
Attachment 4 - Representations about a referral agency response provisions
Attachment 5 - Documents referenced in conditions
State Assessment and Referral Agency Page 2 of 7
Page 3
2404-40124 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. Conditions Condition timing
Operational works
Schedule 10, Part 17, Division 3, Table 1, Item 1 – Tidal works or work within a coastal management
district —The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Environment and Science to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
1. The development must be carried out generally in accordance with For the duration of
the following plans: works and to be
Layout plan, prepared by The Jetty Specialist, dated maintained.
06/03/2024, drawing number TJS-04865-02, revision A.
Elevation, prepared by The Jetty Specialist, dated
06/03/2024, drawing number TJS-04865-03, revision A.
2. The works to which this approval relates are to be for a private At all times.
purpose only.
3. Any operator and contractor involved in the works to which this During construction.
approval relates must:
a) be provided a copy of referral agency conditions
b) install all measures, plant and equipment necessary to
ensure compliance with the conditions of this approval
c) maintain such measures, plant and equipment in a proper
and efficient condition
d) operate such measures, plant and equipment in a proper
and efficient manner.
4. For the proposed works only use material which are free from During construction.
contaminants as defined under section 11 of the Environmental
Protection Act 1994.
5. Should the works become damaged as a result of erosion, flooding At all times.
or storm tide inundation, the registered landowner(s) of the subject
land shall be responsible for the removal of all debris at their own
expense.
Schedule 10, Part 17, Division 3, Table 2, Item 1 – Tidal works or work within a coastal management
district —The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Transport and Main Roads to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
6. The development must be carried out generally in accordance with At all times.
the following plans:
Site Plan and Water Allocation, prepared by The Jetty
Specialist, dated 22/11/23, drawing number TJS-04865-01,
revision A.
7. a) Light/mark all vessels, structure, plant and equipment associated For the duration of
with the works, in accordance with Section 3 of AS4282-1997 work and for operation
Control of the obtrusive effects of outdoor lighting. to be maintained at all
times.
b) Lighting provided must not obscure, disguise or otherwise
interfere with the safe navigation of other vessels, including the
effectiveness of navigational lighting.
State Assessment and Referral Agency Page 3 of 7
Page 4
2404-40124 SRA
8. The construction, operation and maintenance of the pontoon and For the duration of
any ship berthed, moored or attached to the structure, must not: works, and at all times.
a) encroach into, pass over or under a navigation corridor; or
b) be located in a high risk maritime zone; or
c) impede the safe navigation of other ships or boats; or
d) restrict safe access to or from neighbouring structures
9. Remove and dispose of any debris or similar obstruction For the duration of
encountered whilst undertaking the work at an appropriately licensed works.
facility.
10. All piles and/or structure to be demolished, both above and below Prior to the completion
the waterline must be completely extracted/removed. of works.
State Assessment and Referral Agency Page 4 of 7
Page 5
2404-40124 SRA
Attachment 2—Advice to the applicant
General advice
1. Terms and phrases used in this document are defined in the Planning Act 2016, its regulation
or the State Development Assessment Provisions (SDAP) (version 3.0). If a word remains
undefined it has its ordinary meaning.
State Assessment and Referral Agency Page 5 of 7
Page 6
2404-40124 SRA
Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)
The reasons for the SARA’s decision are:
The proposed development is for operational work for prescribed tidal works for a pontoon.
The proposed development involves operational work in a developed tidal waterway, and as such
required assessment under the State Development Assessment Provisions (SDAP).
SARA assessed the application against State code 7: Maritime safety, of the SDAP (v3.0) and found it
complies, subject to conditions to ensure:
o the development is carried out generally in accordance with the plans of development
submitted with the application
o that at all times, all lights on or above the development site do not interfere with safe
navigation in surrounding waterways
o the development does not encroach on the navigation corridor or high-risk maritime zone to
ensure the safe passage of vessels
o that debris from the development does not create a hazard to navigation
o that there is no residual material that could create a hazard to navigation.
SARA assessed the application against State code 8: Coastal development and tidal works, of the
SDAP (v3.0) and found it complies, subject to conditions to ensure:
o the development is carried out generally in accordance with the plan of development
submitted with the application.
o that at all times, the works, to which this approval relates are for private purpose only.
o any operator and contractor involved in the works ensures impacts on coastal values
(water quality) are avoided or minimised.
o works only use materials which are free from contaminants as defined under section 11 of
the Environmental Protection Act 1994.
o damaged works as a result of erosion, flooding or storm tide inundation, the registered
landowner(s) of the subject land shall be responsible for the removal of all debris at their
own expense.
Material used in the assessment of the application:
the development application material and submitted plans
Planning Act 2016
Planning Regulation 2017
the SDAP (version 3.0), as published by SARA
the Development Assessment Rules
SARA DA Mapping system
section 58 of the Human Rights Act 2019
Attachment 4—Representations about a referral agency response
provisions
(page left intentionally blank)
State Assessment and Referral Agency Page 6 of 7
Page 7
2404-40124 SRA Attachment 5—Documents referenced in conditions (page left intentionally blank) State Assessment and Referral Agency Page 7 of 7
Used in these records
2404-40124 SRA - Response with conditions (MCU24_0044 and OPW24_0045).pdfRelated documentApplication case desk ↗
About this file
- File size
- 263 KB (small file)
- File type
No other editions are linked here.