Skip to the record
The only place to find full transcripts.

Council archive · source document

2404-40124 SRA - Response with conditions (MCU24_0044 and OPW24_0045) · MCU24/0044

of 7

Text shows just the words. Original shows the document exactly as it was published.

                                                                                          2404-40124 SRA




8.      The construction, operation and maintenance of the pontoon and         For the duration of
        any ship berthed, moored or attached to the structure, must not:       works, and at all times.
            a) encroach into, pass over or under a navigation corridor; or
            b) be located in a high risk maritime zone; or
            c) impede the safe navigation of other ships or boats; or
            d) restrict safe access to or from neighbouring structures
9.      Remove and dispose of any debris or similar obstruction                For the duration of
        encountered whilst undertaking the work at an appropriately licensed   works.
        facility.
10.     All piles and/or structure to be demolished, both above and below      Prior to the completion
        the waterline must be completely extracted/removed.                    of works.




State Assessment and Referral Agency                                                          Page 4 of 7

Used in these records

About this file

File size
263 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2404-40124 SRA - Response with conditions (MCU24_0044 and OPW24_0045).pdf · 263 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.