2404-40124 SRA - Response with conditions (MCU24_0044 and OPW24_0045) · MCU24/0044
2404-40124 SRA
8. The construction, operation and maintenance of the pontoon and For the duration of
any ship berthed, moored or attached to the structure, must not: works, and at all times.
a) encroach into, pass over or under a navigation corridor; or
b) be located in a high risk maritime zone; or
c) impede the safe navigation of other ships or boats; or
d) restrict safe access to or from neighbouring structures
9. Remove and dispose of any debris or similar obstruction For the duration of
encountered whilst undertaking the work at an appropriately licensed works.
facility.
10. All piles and/or structure to be demolished, both above and below Prior to the completion
the waterline must be completely extracted/removed. of works.
State Assessment and Referral Agency Page 4 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2404-40124 SRA - Response with conditions (MCU24_0044 and OPW24_0045).pdfRelated documentApplication case desk ↗
About this file
- File size
- 263 KB (small file)
- File type
No other editions are linked here.